Mining Project Economics Database
Headline economics for 558 mining projects across 268 companies, pulled straight from NI 43-101, JORC and S-K 1300 technical reports and corporate disclosures. Ranked by after-tax NPV and linked to each company. Sort any column, or browse by commodity.
558 of 558 projects
| # | Project / Company | Study | ||||||
|---|---|---|---|---|---|---|---|---|
| 1 | Serra Sul Complex Vale S.A. (VALE) | Iron Ore | Feasibility Dec 2023 | $44.51B | — | — | — | — |
| 2 | Serra Sul Complex (S11CD) Vale S.A. (VALE) | Iron ore | Feasibility Dec 2023 | $44.51B | — | — | — | — |
| 3 | Serra Norte Vale S.A. (VALE) | Iron Ore | Feasibility Dec 2021 | $26.21B | — | — | — | — |
| 4 | Serra Norte Complex Vale S.A. (VALE) | Iron Ore | Resource Estimate Dec 2025 | $19.55B | — | $8.06B | — | 44.2 US$/ton of product |
| 5 | Salobo Operations Vale S.A. (VALE) | Copper / Gold | Resource Estimate Dec 2025 | $16.61B | — | $3.92B | — | — |
| 6 | Waterberg Project Platinum Group Metals Ltd. (PTM.TO) | Platinum Group Metals (PGM) - Pt, Pd, Rh, Au | Feasibility Aug 2024 | ZAR 11.56B | 14.2% | ZAR 18.86B | 52 yrs | — |
| 7 | Hycroft Mine (PEA base case - additional metrics) Hycroft Mining Holding Corporation (HYMC) | Gold & Silver | PEA May 2026 | $10.00B | 30.1% | — | — | — |
| 8 | Vicuña District Lundin Mining Corporation (LUN.TO) | Copper, Gold, Silver | PEA Feb 2026 | $9.50B | 14.8% | $7.10B | 70 yrs | 0.5 USD/lb |
| 9 | KSM Seabridge Gold Inc. (SEA.TO) | Gold and Copper | Feasibility 2022 | $7.90B | 16.1% | $6.40B | 33 yrs | 601 USD/oz Au |
| 10 | Jansen BHP Group (BHP) | Potash | Feasibility Jun 2022 | $5.50B | 15.2% | — | — | 61 USD/tonne KCl |
| 11 | Jansen Potash Project (Stage 1) BHP Group (BHP) | Potash | Pre-Feasibility Jun 2022 | $5.50B | 15.2% | — | — | — |
| 12 | Oko West G2 Goldfields Inc. (GTWO.TO) | Gold | Feasibility Apr 2025 | $5.18B | — | $972M | 12 yrs | 1,123 USD/oz |
| 13 | Donlin Gold NOVAGOLD Resources Inc. (NG.TO) | Gold | Pre-Feasibility Nov 2025 | $5.06B | 10.3% | $9.23B | 27 yrs | — |
| 14 | Graphite Creek Project Graphite One Inc. (GPH.V) | Graphite | Feasibility Mar 2025 | $5.03B | 26.8% | $4.87B | — | — |
| 15 | Graphite Creek Mine & Secondary Treatment Plant Graphite One Inc. (GPH.V) | Graphite | Feasibility | $5.00B | 27% | $5.00B | 20 yrs | — |
| 16 | Warintza Solaris Resources Inc. (SLS.TO) | Copper | Pre-Feasibility Nov 2025 | $4.60B | 26% | $3.68B | 22 yrs | 1.1 USD/lb |
| 17 | Berg Copper Project Surge Copper Corp. (SURG.V) | Copper | Pre-Feasibility Jun 2026 | C$4.59B | 23.8% | C$4.68B | 27.7 yrs | — |
| 18 | Simandou / Simfer Iron Ore Project Rio Tinto (RIO) | Iron ore | Feasibility Dec 2023 | $4.40B | — | $4.60B | — | — |
| 19 | Hycroft Property Hycroft Mining Holding Corporation (HYMC) | Gold, Silver | PEA Mar 2023 | $4.30B | 16.9% | $2.40B | 51 yrs | — |
| 20 | Kingking St Augustine Gold & Copper Ltd. (SAU.TO) | Copper-Gold | Pre-Feasibility Jul 2025 | $4.18B | 34.2% | $2.37B | 38 yrs | — |
| 21 | Oko-Ghanie G2 Goldfields Inc. (GTWO.TO) | Gold | PEA | $4.14B | — | $664M | 14 yrs | 1,191 USD/oz |
| 22 | Lake Superior Lithium Project Avalon Advanced Materials Inc. (AVL.TO) | Lithium | PEA Sep 2024 | C$4.12B | 47.5% | C$1.21B | 30 yrs | 13,029 CAD/t LHM |
| 23 | Lake Superior Lithium (Thunder Bay Lithium Refinery) Avalon Advanced Materials Inc. (AVL.TO) | Lithium | PEA 2024 | C$4.10B | 48% | C$1.30B | 30 yrs | — |
| 24 | Lake Superior Lithium (LSLi) Avalon Advanced Materials Inc. (AVL.TO) | Lithium | PEA Sep 2024 | C$4.10B | 48% | C$1.30B | 30 yrs | — |
| 25 | Lake Superior Lithium (LSLi) / Thunder Bay Lithium Processing Facility Avalon Advanced Materials Inc. (AVL.TO) | Lithium Hydroxide | PEA Sep 2024 | C$4.10B | 48% | C$1.30B | 30 yrs | — |
| 26 | Lake Superior Lithium (LSLi) / Thunder Bay Lithium Refinery Avalon Advanced Materials Inc. (AVL.TO) | Lithium Hydroxide | PEA 2024 | C$4.10B | 48% | C$1.30B | 30 yrs | — |
| 27 | Lake Superior Lithium Project (LSLi) Avalon Advanced Materials Inc. (AVL.TO) | Lithium Hydroxide | PEA Sep 2024 | C$4.10B | 48% | C$1.30B | 30 yrs | — |
| 28 | Casino Project Western Copper and Gold Corporation (WRN.TO) | Copper, Gold, Molybdenum, Silver | Feasibility Aug 2022 | C$4.06B | 18.1% | — | — | — |
| 29 | Angel Island (formerly Clayton Valley Lithium Project) Century Lithium Corp. (LCE.V) | Lithium | Feasibility Feb 2026 | $4.01B | 27.4% | $997M | 60 yrs | 4,389 USD/t Li2CO3 |
| 30 | Angel Island Lithium Project Century Lithium Corp. (LCE.V) | Lithium | Feasibility Feb 2026 | $4.01B | 27.4% | $997M | 60 yrs | 4,389 USD/t Li2CO3 |
| 31 | Clayton Valley Lithium Project Century Lithium Corp. (LCE.V) | Lithium | Feasibility Jan 2026 | $4.01B | 27.4% | — | 40 yrs | — |
| 32 | Clearwater Project E3 Lithium Ltd. (ETL.V) | Lithium | Pre-Feasibility Jun 2024 | $3.72B | 24.6% | $2.46B | 50 yrs | — |
| 33 | Buenavista del Cobre (BVC) Southern Copper Corporation (SCCO) | Copper | Pre-Feasibility Dec 2021 | $3.70B | — | $5.30B | 30 yrs | — |
| 34 | Gibraltar Copper Mine Taseko Mines Limited (TGB) | Copper | Production Mar 2022 | C$3.40B | — | — | 19 yrs | — |
| 35 | Valley (Rogue Project) Snowline Gold Corp. (SGD.TO) | Gold | PEA Aug 2025 | C$3.37B | 25% | C$1.70B | 20 yrs | 844 USD/oz |
| 36 | Rogue Project (Valley deposit) Snowline Gold Corp. (SGD.TO) | Gold | PEA Jun 2025 | CDN 3.37B | 25% | CDN 1.69B | 20 yrs | 844 US$/oz |
| 37 | Valley Snowline Gold Corp. (SGD.TO) | Gold | PEA Aug 2025 | C$3.37B | 25% | C$1.69B | 20 yrs | 844 USD/oz |
| 38 | Rogue Project Snowline Gold Corp. (SGD.TO) | Gold | PEA Aug 2025 | C$3.37B | 25% | C$1.69B | 20 yrs | 844 USD/oz |
| 39 | Horne 5 Gold Project Falco Resources Ltd. (FPC.V) | Gold | Feasibility Jul 2026 | C$3.35B | 28.2% | C$1.75B | — | 782 USD/oz |
| 40 | Valentine Gold Mine Equinox Gold Corp. (EQX.TO) | Gold | Feasibility Mar 2026 | $3.11B | — | $507M | — | — |
| 41 | Kami (Rose Central) Iron Ore Altius Minerals Corporation (ALS.TO) | Iron Ore | PEA Sep 2011 | $3.07B | 40.2% | $989M | 15.3 yrs | — |
| 42 | Diablillos AbraSilver Resource Corp. (ABRA.TO) | Silver-Gold | Feasibility Jun 2026 | $3.00B | 41.9% | $722M | 25 yrs | 20 USD/oz AgEq |
| 43 | Los Azules McEwen Mining Inc. (MUX.TO) | Copper | Feasibility Sep 2025 | $2.94B | 19.8% | $3.17B | 21 yrs | 2.1 USD/lb Cu |
| 44 | Shaakichiuwaanaan (Corvette) PMET Resources Inc. (PMET.TO) | Lithium | PEA Aug 2024 | C$2.90B | 34% | C$640M | 24 yrs | 593 USD/t |
| 45 | White Gold Project (Spot Case) White Gold Corp. (WGO.V) | Gold | PEA Aug 2026 | C$2.90B | 56% | C$1.00B | — | — |
| 46 | Shaakichiuwaanaan (CV5 & CV13 Pegmatites) PMET Resources Inc. (PMET.TO) | Lithium | PEA Aug 2024 | C$2.90B | 34% | — | 24 yrs | 560 USD/t (FOB Bécancour) |
| 47 | Viken District Metals Corp. (DMX.V) | Uranium, Vanadium | PEA Jun 2026 | $2.88B | 45.9% | $876M | 14 yrs | -118 USD/lb U3O8 |
| 48 | Arizaro Project Lithium Chile Inc. (LITH.V) | Lithium | Pre-Feasibility Jul 2024 | $2.83B | 36.3% | $1.05B | 20 yrs | 7,165 USD/t LCE |
| 49 | Crawford (FEED 2025) Canada Nickel Company Inc. (CNC.V) | Nickel | Feasibility 2025 | $2.80B | 17.6% | $2.00B | — | 1.5 USD/lb Ni |
| 50 | Converse Project Roxmore Resources Ltd. (RM.TO) | Gold | PEA May 2026 | $2.75B | 42.8% | $829M | 14.5 yrs | 1,769 USD/oz Au |
| 51 | Soto Norte Aris Mining Corporation (ARIS.TO) | Gold | Pre-Feasibility Sep 2025 | $2.68B | 35.4% | $625M | 22 yrs | 534 USD/oz |
| 52 | Tanbreez (Alternative PEA metrics - different discount) Critical Metals Corp. (CRML) | Rare Earth Elements | PEA Mar 2025 | $2.68B | 180% | $300M | — | — |
| 53 | Carangas New Pacific Metals Corp. (NUAG.TO) | Silver | PEA Jul 2026 | $2.65B | 35.9% | $645M | 19 yrs | 19.2 USD/oz AgEq |
| 54 | La Colorada Skarn Pan American Silver Corp. (PAAS) | Silver | Production Mar 2026 | $2.60B | 17% | $1.90B | 37 yrs | -22.7 USD/oz |
| 55 | Oko Gold Project G2 Goldfields Inc. (GTWO.TO) | Gold | PEA Dec 2025 | $2.56B | 39% | $664M | 14 yrs | 1,191 USD/oz |
| 56 | Lawyers-Ranch Thesis Gold Inc. (TAU.V) | Gold-Silver (Au-Ag), gold equivalent AuEq | Pre-Feasibility Dec 2025 | C$2.37B | 54.4% | C$736M | 15 yrs | 1,185 US$/oz AuEq |
| 57 | Elk Creek Project NioCorp Developments Ltd. (NB) | Niobium, Scandium, Titanium | Feasibility 2022 | $2.35B | 27.6% | $1.14B | 38 yrs | — |
| 58 | Elk Creek Critical Minerals Project NioCorp Developments Ltd. (NB) | Niobium, Scandium, Titanium, Rare Earths (NdPr, Dy, Tb) | Feasibility Jun 2022 | $2.35B | 27.6% | $1.14B | 38 yrs | — |
| 59 | Spanish Mountain Gold Project - Spot Case (US$3,300/oz gold) Spanish Mountain Gold Ltd. (SPA.V) | Gold | PEA Jul 2025 | C$2.30B | 32% | — | 24.5 yrs | — |
| 60 | Boardwalk LithiumBank Resources Corp. (LBNK.V) | Lithium | PEA Feb 2025 | $2.30B | — | — | 20 yrs | 4,588 USD/t |
| 61 | Red Rock Converter Rock Tech Lithium Inc. (RCK.V) | Lithium | — Aug 2026 | C$2.30B | 22% | C$1.30B | — | 6,111 CAD/t LHM |
| 62 | Pebble Project Northern Dynasty Minerals Ltd. (NDM.TO) | Copper | PEA 2023 | $2.23B | 16.2% | $3.12B | 20 yrs | — |
| 63 | Čoka Rakita (at $3,500/oz Au sensitivity) DPM Metals Corp. (DPM.TO) | Gold | Feasibility Jan 2026 | $2.21B | 67.8% | $448M | 10 yrs | — |
| 64 | Coffee Gold Project Fuerte Metals Corp. (FMT.V) | Gold | PEA Mar 2026 | $2.20B | 43.5% | — | 13 yrs | 1,386 USD/oz |
| 65 | Springpole Gold Project First Mining Gold Corp. (FF.TO) | Gold | Pre-Feasibility Dec 2025 | $2.10B | 40.8% | $1.10B | 9.4 yrs | 938 USD/oz |
| 66 | Tanbreez Critical Metals Corp. (CRML) | Rare Earth Elements (REE), Zirconium (Zr), Niobium (Nb), Tantalum (Ta), Hafnium (Hf), Gallium (Ga) | PEA Mar 2025 | $2.07B | 180% | $300M | 25 yrs | — |
| 67 | Baptiste Nickel Project FPX Nickel Corp. (FPX.V) | Nickel | Pre-Feasibility Sep 2023 | $2.01B | 18.6% | $2.18B | 29 yrs | 4.2 USD/lb Ni |
| 68 | Altar Project Aldebaran Resources Inc. (ALDE.V) | Copper | PEA Sep 2025 | $2.01B | 20.5% | $1.59B | — | 2.6 USD/lb Cu |
| 69 | Çöpler District (Initial Assessment Case) SSR Mining Inc. (SSRM) | Gold | PEA Dec 2021 | $2.00B | — | $218M | 22 yrs | 924 USD/oz gold |
| 70 | Whistler Gold-Copper Project U.S. GoldMining Inc. (USGO) | Gold-Copper (with Silver) | PEA Mar 2026 | $2.00B | 33% | $1.30B | 14.6 yrs | 1,046 USD/oz Au |
| 71 | HyProMag USA - Three Plant Target Mkango Resources Ltd. (MKA.V) | Rare Earths (NdFeB magnets) | — | $2.00B | — | — | — | — |
| 72 | Yellowhead Copper Project Taseko Mines Limited (TGB) | Copper | Feasibility Jun 2025 | C$2.00B | — | C$2.00B | 25 yrs | — |
| 73 | La Caridad Southern Copper Corporation (SCCO) | Copper | Resource Estimate Dec 2024 | $2.00B | — | $4.50B | 58 yrs | — |
| 74 | North Island Project NorthIsle Copper and Gold Inc. (NCX.V) | Copper, Gold | PEA Feb 2025 | C$2.00B | 28.6% | C$1.14B | 28.7 yrs | 1.8 USD/lb Cu Eq |
| 75 | Gunnison Project Gunnison Copper Corp. (GCU.TO) | Copper | PEA Mar 2026 | $1.96B | 22.5% | $1.56B | 21 yrs | 2.1 USD/lb Cu |
| 76 | Ontario Operations Vale S.A. (VALE) | Nickel / Copper | Feasibility Dec 2025 | $1.95B | — | — | 21 yrs | — |
| 77 | Luanga PGM + Au + Ni Project (Alternate Case - Vertical Integration / Smelter) Bravo Mining Corp. (BRVO.V) | PGM (Palladium, Platinum, Rhodium), Gold, Nickel | PEA Aug 2025 | $1.86B | 49% | $182M | 17 yrs | — |
| 78 | White Gold Project White Gold Corp. (WGO.V) | Gold | PEA Aug 2026 | C$1.86B | 40.7% | C$1.00B | 9.4 yrs | 1,482 USD/oz |
| 79 | Toroparu Aris Mining Corporation (ARIS.TO) | Gold | PEA Oct 2025 | $1.80B | 25.2% | $820M | 21.3 yrs | 1,300 USD/oz |
| 80 | Panuco Silver & Gold District Vizsla Silver Corp. (VZLA.TO) | Silver | Feasibility Nov 2025 | $1.80B | 111.1% | $239M | 9.4 yrs | 10.6 USD/oz AgEq |
| 81 | Panuco Vizsla Royalties Corp. (VROY.V) | Silver | Feasibility Nov 2025 | $1.80B | 111.1% | $239M | 9.4 yrs | 10.6 USD/oz payable AgEq |
| 82 | Panuco Silver & Gold Project Vizsla Silver Corp. (VZLA.TO) | Silver | Feasibility Nov 2025 | $1.80B | 111.1% | $239M | 9.4 yrs | 10.6 USD/oz AgEq |
| 83 | Panuco Elemental Royalties Corp. (ELE.V) | Silver-Gold | Feasibility Nov 2025 | $1.80B | 111% | $239M | 9.4 yrs | 10.6 USD/oz AgEq |
| 84 | Metates (2016 PFS comparison) Chesapeake Gold Corp. (CKG.V) | Gold & Silver | Pre-Feasibility Apr 2016 | $1.80B | — | $3.50B | 27 yrs | — |
| 85 | Cuajone Operations Southern Copper Corporation (SCCO) | Copper | Feasibility Feb 2025 | $1.79B | — | — | 50.4 yrs | — |
| 86 | Çöpler District SSR Mining Inc. (SSRM) | Gold | Feasibility Dec 2021 | $1.73B | — | — | 21 yrs | 966 USD/oz |
| 87 | Çöpler District (Reserve Case) SSR Mining Inc. (SSRM) | Gold | Feasibility Dec 2021 | $1.73B | — | — | 21 yrs | 966 USD/oz gold |
| 88 | Crater Lake Scandium Project Scandium Canada Ltd. (SCD.V) | Scandium (Sc2O3) / Rare Earth Elements | PEA Jul 2022 | C$1.72B | 32.8% | C$871M | 25 yrs | — |
| 89 | Ikkari Rupert Resources Ltd. (RUP.TO) | Gold | Pre-Feasibility Feb 2025 | $1.70B | 38% | $575M | 20 yrs | 918 USD/oz |
| 90 | South West Arkansas (SWA) Project Standard Lithium Ltd. (SLI.V) | Lithium | Feasibility Oct 2025 | $1.70B | 20% | $1.45B | 20 yrs | 4,516 USD/t |
| 91 | South West Arkansas Project Standard Lithium Ltd. (SLI.V) | Lithium | Feasibility Oct 2025 | $1.70B | 20% | $1.45B | 20 yrs | — |
| 92 | Ikkari (Rupert Resources) Aurion Resources Ltd. (AU.V) | Gold | Pre-Feasibility Feb 2025 | $1.68B | 38% | $575M | — | — |
| 93 | Carina Project Aclara Resources Inc. (ARA.TO) | Heavy Rare Earths (MREC) | Feasibility Apr 2026 | $1.66B | 26.9% | $781M | 18 yrs | — |
| 94 | Bankan Gold Project Robex Resources Inc. (RBX.V) | Gold | Feasibility Jun 2025 | $1.64B | 46% | $463M | 12.2 yrs | 1,057 USD/oz |
| 95 | Mont Sorcier Cerrado Gold Inc. (CERT.V) | Iron (DRI concentrate) | PEA Jul 2022 | $1.61B | 43% | $456M | 21 yrs | 28.2 USD/t |
| 96 | Shaakichiuwaanaan Project (CV5 Pegmatite) PMET Resources Inc. (PMET.TO) | Lithium | Feasibility Nov 2025 | C$1.59B | 18.1% | C$1.50B | — | 799.8 CAD/t conc |
| 97 | Phoenix (Wheeler River) Denison Mines Corp. (DML.TO) | Uranium (U3O8) | Feasibility Jun 2023 | C$1.57B | 73% | C$600M | 10 yrs | 18.4 USD/lb U3O8 |
| 98 | Wheeler River - Phoenix Denison Mines Corp. (DML.TO) | Uranium | Feasibility Jun 2023 | C$1.57B | 73% | C$600M | 10 yrs | 18.4 USD/lb U3O8 |
| 99 | Phoenix ISR (Wheeler River) Denison Mines Corp. (DML.TO) | Uranium (U3O8) | Feasibility Jun 2023 | C$1.57B | 73% | C$600M | 10 yrs | 18.4 USD/lb U3O8 |
| 100 | Alto Paraná Titanium Project (Stretch Case) Uranium Energy Corp. (UEC) | Titanium, high titania slag, high purity pig iron (HPPI) | PEA Nov 2023 | $1.55B | 25% | $918M | 23 yrs | — |
| 101 | Target Gold Mine Harmony Gold Mining Company (HMY) | Gold | Feasibility Oct 2024 | ZAR 1.52B | — | — | 5 yrs | — |
| 102 | Volcan Gold Project Tiernan Gold Corp. (TNGD.V) | Gold-Copper | PEA Jul 2025 | $1.51B | 28.7% | $1.02B | 13.6 yrs | 1,094 USD/oz Au |
| 103 | Boumadine Polymetallic Project Aya Gold & Silver Inc. (AYA.TO) | Silver (Polymetallic) | PEA Dec 2025 | $1.50B | 47% | $446M | 11 yrs | 1,021 USD/oz AuEq |
| 104 | Shaakichiuwaanaan (CV5 Lithium Only) PMET Resources Inc. (PMET.TO) | Lithium | Feasibility Oct 2025 | C$1.50B | — | — | — | — |
| 105 | Carina Module Aclara Resources Inc. (ARA.TO) | Rare Earth Elements (Heavy REE) | PEA Sep 2024 | $1.48B | 26.5% | $593M | 22 yrs | — |
| 106 | Shaw Dome Project - CarLang A Deposit EV Nickel Inc. (EVNI.V) | Nickel | PEA 2025 | $1.48B | — | — | 20 yrs | — |
| 107 | Shaw Dome Project - CarLang A Zone EV Nickel Inc. (EVNI.V) | Nickel | PEA 2025 | C$1.48B | — | — | 20 yrs | — |
| 108 | CarLang A Nickel Project EV Nickel Inc. (EVNI.V) | Nickel | PEA Jun 2025 | C$1.48B | 14% | C$3.32B | 20 yrs | 7 CAD/lb Ni-Eq |
| 109 | Santo Tomás Oroco Resource Corp. (OCO.V) | Copper | PEA Aug 2024 | $1.48B | 22.2% | $1.10B | 22.6 yrs | 2 USD/lb Cu |
| 110 | Salares Norte Gold Fields Limited (GFI) | Gold (with silver by-product) | Feasibility Mar 2025 | $1.47B | — | $155M | 11 yrs | — |
| 111 | Higginsville Hub Expansion (HXP) Westgold Resources Limited (WGX.TO) | Gold | Pre-Feasibility Mar 2026 | A$1.40B | 43% | A$145M | — | — |
| 112 | Higginsville Expansion (HXP) Westgold Resources Limited (WGX.TO) | Gold | Feasibility | A$1.40B | 43% | A$145M | — | — |
| 113 | Tower Gold Project STLLR Gold Inc. (STLR.TO) | Gold | PEA Jun 2025 | C$ 1.35B | 13.4% | C$ 1.87B | 19 yrs | 1,537 USD/oz |
| 114 | Kindersley Lithium Project (KLP) - Phase 1 CAD Grounded Lithium Corp. (GRD.V) | Lithium | PEA Jun 2023 | C$1.35B | — | — | — | — |
| 115 | Patterson Lake South (PLS) Project Paladin Energy Ltd. (PDN.TO) | Uranium | Feasibility Jan 2023 | $1.32B | 28.2% | $1.23B | 10 yrs | 15.2 USD/lb U3O8 |
| 116 | Tilden Property (Tilden Mine) Cleveland-Cliffs Inc. (CLF) | Iron | Feasibility Feb 2022 | $1.32B | — | — | 25 yrs | — |
| 117 | Lola Graphite Project Falcon Energy Materials Inc. (FLCN.V) | Graphite | PEA 2025 | $1.32B | 43.1% | $291M | 25 yrs | 680 USD/t NFG concentrate |
| 118 | Lola Graphite Project / Integrated Development Plan (IDP) Falcon Energy Materials Inc. (FLCN.V) | Graphite (CSPG, NFG concentrate) | PEA Feb 2023 | $1.32B | 43.1% | $291M | 25 yrs | — |
| 119 | Darling Range (Huntly & Willowdale bauxite mines) Alcoa Corporation (AA) | Bauxite (Alumina) | Feasibility Feb 2022 | $1.32B | — | — | 7 yrs | — |
| 120 | Camino Rojo Underground (PEA) Equinox Gold Corp. (EQX.TO) | Gold | PEA Mar 2026 | $1.30B | 30% | $608M | 17 yrs | 1,304 USD/oz |
| 121 | Camino Rojo Equinox Gold Corp. (EQX.TO) | Gold | Resource Estimate Mar 2026 | $1.30B | 30% | $608M | 17 yrs | 1,304 USD/oz |
| 122 | Nechalacho Rare Earth Project Avalon Advanced Materials Inc. (AVL.TO) | Rare Earths | Feasibility 2013 | C$1.30B | 19.6% | C$1.60B | — | — |
| 123 | Rio Grande Project NOA Lithium Brines Inc. (NOAL.V) | Lithium | PEA Oct 2025 | $1.28B | 22.6% | $706M | 30 yrs | — |
| 124 | Nechalacho Rare Earth Elements Project Avalon Advanced Materials Inc. (AVL.TO) | Rare Earth Elements | Feasibility May 2013 | $1.26B | 19.6% | $1.45B | 20 yrs | — |
| 125 | Goldfields - Upper Case Fortune Bay Corp. (FOR.V) | Gold | PEA Oct 2025 | C$1.25B | 74% | — | — | — |
| 126 | Luanga PGM + Au + Ni Project Bravo Mining Corp. (BRVO.V) | PGM (Palladium, Platinum, Rhodium), Gold, Nickel | PEA Aug 2025 | $1.25B | 49% | $496M | 17 yrs | — |
| 127 | Porcupine Complex Discovery Silver Corp. (DSV.TO) | Gold | PEA Jan 2025 | $1.20B | — | — | 22 yrs | 1,504 USD/oz |
| 128 | Patterson Lake South (PLS) / Triple R Paladin Energy Ltd. (PDN.TO) | Uranium (U3O8), with gold by-product | Feasibility Jan 2023 | C$1.20B | 27% | C$1.16B | — | — |
| 129 | Costa Fuego Hot Chili Limited (HCH.V) | Copper | Pre-Feasibility Mar 2025 | $1.20B | 19% | $1.27B | 20 yrs | 1.4 USD/lb Cu |
| 130 | Ontario Operations (Sudbury) Vale S.A. (VALE) | Nickel, Copper | Resource Estimate Dec 2021 | $1.18B | — | — | — | — |
| 131 | Colomac Gold Project STLLR Gold Inc. (STLR.TO) | Gold | PEA Jun 2023 | C$ 1.17B | 34.6% | C$ 654M | 11 yrs | 828 USD/oz |
| 132 | Malmbjerg Molybdenum Project Greenland Resources Inc. (MOLY.TO) | Molybdenum | Feasibility Apr 2022 | $1.17B | 22.4% | $820M | — | 12.4 USD/t ore milled |
| 133 | Malmbjerg Greenland Resources Inc. (MOLY.TO) | Molybdenum | Feasibility Feb 2022 | $1.17B | 22.4% | $820M | — | — |
| 134 | Kuska Wealth Minerals Ltd. (WML.V) | Lithium | PEA Jan 2024 | $1.15B | 28% | — | 20 yrs | — |
| 135 | Battery Materials Plant (BMP) – Morocco Falcon Energy Materials Inc. (FLCN.V) | Graphite (CSPG anode material) | PEA 2025 | $1.15B | 82% | $106M | 25 yrs | 3,193 USD/t CSPG |
| 136 | Battery Materials Plant (BMP) - Standalone Falcon Energy Materials Inc. (FLCN.V) | Graphite (CSPG) | PEA Feb 2023 | $1.15B | 82% | $106M | 25 yrs | — |
| 137 | Lola Graphite Project (Battery Material Plant only - BMP standalone) Falcon Energy Materials Inc. (FLCN.V) | Graphite (CSPG anode material) | PEA 2023 | $1.15B | 82% | $106M | 25 yrs | — |
| 138 | Metates Chesapeake Gold Corp. (CKG.V) | Gold-Silver | PEA Jan 2023 | $1.14B | 35% | $359M | 31 yrs | 749 US$/oz Au |
| 139 | Panuco Ag-Au-Pb-Zn Project Vizsla Silver Corp. (VZLA.TO) | Silver | PEA Sep 2024 | $1.14B | 85.7% | $224M | — | — |
| 140 | Mt Todd Gold Project Vista Gold Corp. (VGZ) | Gold | Feasibility Mar 2024 | $1.13B | 20.4% | $1.03B | 16 yrs | — |
| 141 | Perron Gold Project Amex Exploration Inc. (AMX.V) | Gold | Feasibility Apr 2026 | C$1.13B | 114.6% | C$194M | 5 yrs | 910 USD/oz |
| 142 | Arctic Project Trilogy Metals Inc. (TMQ.TO) | Copper, Zinc, Lead, Silver, Gold | Feasibility Nov 2022 | $1.11B | 22.8% | $1.18B | 13 yrs | 1.6 USD/lb Cu Payable |
| 143 | Copper World Arizona Sonoran Copper Company (ASCU.TO) | Copper | Pre-Feasibility | $1.10B | 19% | $1.30B | 20 yrs | — |
| 144 | Hemlo Gold Mine Hemlo Mining Corp. (HMMC.V) | Gold | Feasibility Oct 2025 | $1.09B | — | — | 14 yrs | 1,545 USD/oz |
| 145 | Koné Gold Project Montage Gold Corp. (MAU.TO) | Gold | Feasibility Feb 2024 | $1.09B | 31% | $712M | 16 yrs | 998 USD/oz |
| 146 | Mabilo RTG Mining Inc. (RTG.TO) | Copper & Gold | Feasibility Mar 2016 | $1.08B | — | $25M | 7 yrs | — |
| 147 | Mabilo Copper and Gold Mine RTG Mining Inc. (RTG.TO) | Copper, Gold | Feasibility 2016 | $1.08B | — | $25M | 7 yrs | — |
| 148 | Moonlight-Superior Copper Project US Copper Corp. (USCU.V) | Copper | PEA Jan 2025 | $1.07B | 23% | $956M | — | 2.5 USD/lb Cu Produced |
| 149 | Marathon Copper-Palladium Mine (Marathon Project) Generation Mining Limited (GENM.TO) | Copper, Palladium | Feasibility Mar 2025 | C$1.07B | 28% | C$992M | 13 yrs | 781 US$/PdEq oz |
| 150 | Marathon Copper-Palladium Project Generation Mining Limited (GENM.TO) | Copper/Palladium | Feasibility Mar 2025 | C$1.07B | 27.6% | C$992M | 13 yrs | 781 USD/oz PdEq |
| 151 | North Island Copper and Gold Project NorthIsle Copper and Gold Inc. (NCX.V) | Copper (Gold, Molybdenum by-products) | PEA May 2022 | C$1.06B | 19% | — | 22 yrs | — |
| 152 | Yandera Copper Project Freeport Resources Inc. (FRI.V) | Copper | Pre-Feasibility Nov 2017 | $1.04B | 23.5% | $930M | 20 yrs | — |
| 153 | Ying Ag-Pb-Zn-Au Property Silvercorp Metals Inc. (SVM.TO) | Silver | Feasibility Dec 2025 | $1.03B | — | — | — | — |
| 154 | Guben Converter Rock Tech Lithium Inc. (RCK.V) | Lithium | — Aug 2026 | C$1.02B | 18% | C$750M | — | 3,878 EUR/t LHM |
| 155 | James Bay Niobium - Open Pit Scenario NioBay Metals Inc. (NBY.V) | Niobium (Nb₂O₅) | PEA | C$1.01B | 27.5% | — | 30 yrs | — |
| 156 | La Mina GoldMining Inc. (GOLD.TO) | Gold-Copper | PEA Apr 2026 | $1.00B | 32.2% | $523M | 11.2 yrs | 1,045 USD/oz Au |
| 157 | Spanish Mountain Gold Project Spanish Mountain Gold Ltd. (SPA.V) | Gold | PEA Jul 2025 | C$1.00B | 18.2% | — | 24.5 yrs | — |
| 158 | Kindersley Lithium Project (KLP) Grounded Lithium Corp. (GRD.V) | Lithium | PEA Jun 2023 | $1.00B | 48.5% | $335M | — | — |
| 159 | Wicheeda REE Project Defense Metals Corp. (DEFN.V) | Rare Earth Elements | Pre-Feasibility Apr 2025 | $1.00B | 18.6% | $1.40B | — | 38.4 USD/kg NdPrO equivalent in MREC |
| 160 | Wicheeda Defense Metals Corp. (DEFN.V) | Rare Earth Elements (REE) | Pre-Feasibility Feb 2025 | $1.00B | 18.9% | — | — | — |
| 161 | Wicheeda Rare Earth Element Project Defense Metals Corp. (DEFN.V) | Rare Earth Elements (NdPr-rich) | Pre-Feasibility Apr 2025 | $1.00B | 18.6% | $1.40B | — | — |
| 162 | Wicheeda Rare Earth Project Defense Metals Corp. (DEFN.V) | Rare Earth Elements (NdPr, Tb, Dy) | Pre-Feasibility Feb 2025 | $992M | 18.9% | $1.44B | 15 yrs | — |
| 163 | Cabaçal Meridian Mining UK Societas (MNO.TO) | Gold-Copper | Pre-Feasibility Mar 2025 | $984M | 61.2% | $248M | 10.6 yrs | 742.3 USD/oz AuEq |
| 164 | Costa Fuego - Huasco Water (Stage 2 - Desalinated) Hot Chili Limited (HCH.V) | Water | Pre-Feasibility | $977M | 19% | $1.40B | — | — |
| 165 | Midwest (Midwest Main) Denison Mines Corp. (DML.TO) | Uranium (U3O8) | PEA Aug 2025 | C$965M | 82.7% | C$254M | — | 25.8 USD/lb U3O8 |
| 166 | Midwest Denison Mines Corp. (DML.TO) | Uranium | PEA Aug 2025 | C$965M | 82.7% | C$254M | — | 25.8 USD/lb U3O8 |
| 167 | Wicheeda Rare Earths Project Defense Metals Corp. (DEFN.V) | Rare Earth Elements (REE) | Pre-Feasibility Feb 2025 | $957M | 18.6% | $1.44B | 15 yrs | — |
| 168 | Cariboo Gold Project Osisko Development Corp. (ODV.V) | Gold | Feasibility Apr 2025 | C$943M | 22.1% | C$881M | 10 yrs | 1,157 USD/oz |
| 169 | Gabbs Project P2 Gold Inc. (PGLD.V) | Gold-Copper | PEA Oct 2025 | $943M | 33.8% | $383M | 14.2 yrs | 1,284 USD/oz Au |
| 170 | Gramalote Project B2Gold Corp. (BTO.TO) | Gold | Feasibility Jul 2025 | $941M | 22.4% | $740M | 13 yrs | 985 USD/oz |
| 171 | PAK Lithium Project Frontier Lithium Inc. (FL.V) | Lithium | Feasibility 2025 | C$932M | 17.9% | C$943M | 31 yrs | 624 CAD/tonne of concentrate sold |
| 172 | Florence Copper Taseko Mines Limited (TGB) | Copper | Feasibility Mar 2023 | $930M | 47% | $275M | 22 yrs | — |
| 173 | La Caridad (LC) Southern Copper Corporation (SCCO) | Copper | Pre-Feasibility Feb 2022 | $927M | — | $737M | — | — |
| 174 | Great Atlantic Salt Project Vulcan Minerals Inc. (VUL.V) | Salt | Feasibility Sep 2025 | C$920M | 21.3% | C$589M | 24 yrs | — |
| 175 | Goldfields - Intermediate Case Fortune Bay Corp. (FOR.V) | Gold | PEA Oct 2025 | C$916M | 59% | — | — | — |
| 176 | Fondaway Canyon Getchell Gold Corp. (GTCH.CN) | Gold | PEA Jun 2026 | $905M | 53.1% | $265M | 10.1 yrs | — |
| 177 | Roughrider Uranium Energy Corp. (UEC) | Uranium | PEA Nov 2024 | $900M | 40% | $545M | 9 yrs | 20.5 US$/lb U3O8 |
| 178 | Troilus Gold-Copper Project Troilus Mining Corp. (TLG.TO) | Gold, Copper | Feasibility Jun 2024 | $885M | 14% | $1.07B | 21 yrs | 1,109 USD/oz |
| 179 | James Bay Niobium - Open Pit & Underground Scenario NioBay Metals Inc. (NBY.V) | Niobium (Nb₂O₅) | PEA | C$865M | 27% | — | 23 yrs | — |
| 180 | Gryphon (Wheeler River) Denison Mines Corp. (DML.TO) | Uranium | Pre-Feasibility Jun 2023 | C$864M | 37.6% | C$737M | 6.5 yrs | 25.5 USD/lb U3O8 |
| 181 | Wheeler River - Gryphon Denison Mines Corp. (DML.TO) | Uranium | Pre-Feasibility Jun 2023 | C$864M | 37.6% | C$737M | 6.5 yrs | 25.5 USD/lb U3O8 |
| 182 | Gryphon UG (Wheeler River) Denison Mines Corp. (DML.TO) | Uranium (U3O8) | Pre-Feasibility Jun 2023 | C$864M | 37.6% | C$737M | 6.5 yrs | 25.5 USD/lb U3O8 |
| 183 | James Bay Niobium Project (OP+UG) NioBay Metals Inc. (NBY.V) | Niobium (Nb) | PEA Oct 2020 | C$856M | 27% | C$482M | 23 yrs | 20.5 USD/kg Nb |
| 184 | Schaft Creek Copper Fox Metals Inc. (CUU.V) | Copper (Cu-Mo-Au-Ag) | PEA Sep 2021 | $842M | 12.9% | $2.65B | 21 yrs | 1.2 USD/lb |
| 185 | CC&V SSR Mining Inc. (SSRM) | Gold | Feasibility Nov 2025 | $824M | — | — | 12 yrs | 2,135 USD/oz |
| 186 | CC&V (Cripple Creek & Victor) SSR Mining Inc. (SSRM) | Gold | Feasibility Jul 2025 | $824M | — | — | 12 yrs | 2,135 USD/oz |
| 187 | South Railroad Equinox Gold Corp. (EQX.TO) | Gold | Feasibility Feb 2026 | $783M | 48% | $395M | 10 yrs | 1,505 USD/oz Au |
| 188 | Musselwhite Mine Equinox Gold Corp. (EQX.TO) | Gold | Feasibility Dec 2024 | $782M | — | — | 7 yrs | — |
| 189 | Čoka Rakita (Feasibility Study) DPM Metals Corp. (DPM.TO) | Gold | Feasibility Jan 2026 | $782M | 36% | $448M | 10 yrs | 644 USD/oz payable gold |
| 190 | DeLamar Project - Base Case Integra Resources Corp. (ITR.V) | Gold-Silver | Feasibility Feb 2026 | $774M | 46% | $389M | 10 yrs | 1,480 USD/oz AuEq |
| 191 | DeLamar Project Integra Resources Corp. (ITR.V) | Gold | Feasibility Feb 2026 | $774M | 46% | $389M | 10 yrs | 1,480 USD/oz AuEq |
| 192 | Manono Lithium Tailings Project Tantalex Lithium Resources Corp. (TTX.CN) | Lithium | PEA Oct 2023 | $765M | 87% | $147M | 6 yrs | — |
| 193 | La Cigarra Kootenay Silver Inc. (KTN.V) | Silver | PEA Jun 2026 | $763M | 41% | $332M | 14 yrs | 18.7 USD/oz |
| 194 | Falco Horne 5 Project Falco Resources Ltd. (FPC.V) | Gold (polymetallic deposit with silver, copper, zinc) | Feasibility Mar 2021 | $761M | 18.9% | $844M | 15 yrs | 587 USD/oz |
| 195 | Koné Gold Project (KGP) Montage Gold Corp. (MAU.TO) | Gold | Feasibility Feb 2022 | $746M | 34.8% | $544M | — | 933 USD/oz |
| 196 | Mercur Gold Project Revival Gold Inc. (RVG.V) | Gold | PEA May 2025 | $741M | 56% | $208M | 10 yrs | 1,385 USD/oz |
| 197 | Silver Sand New Pacific Metals Corp. (NUAG.TO) | Silver | Pre-Feasibility Jun 2024 | $740M | 37% | $358M | 13 yrs | 10.7 USD/oz Ag |
| 198 | Silver Sand Silvercorp Metals Inc. (SVM.TO) | Silver | Pre-Feasibility 2024 | $740M | 37% | $358M | 13 yrs | 11 USD/oz |
| 199 | James Bay Niobium Project (UG) NioBay Metals Inc. (NBY.V) | Niobium (Nb) | PEA Oct 2020 | C$733M | 21.6% | C$579M | 23 yrs | 21.4 USD/kg Nb |
| 200 | James Bay Niobium NioBay Metals Inc. (NBY.V) | Niobium (Nb₂O₅) | PEA | C$733M | 21.6% | C$579M | 23 yrs | 78.1 CAD/t |
| 201 | New Amalga Gold Project Grande Portage Resources Ltd. (GPG.V) | Gold | PEA Feb 2026 | $721M | 56% | $255M | 7 yrs | 1,408 USD/oz Au |
| 202 | Tiros Project Resouro Strategic Metals Inc. (RSM.V) | Titanium & Rare Earths | PEA Jul 2026 | $715M | 44.2% | $191M | 20 yrs | — |
| 203 | Tiros Rare Earths and Titanium Project Resouro Strategic Metals Inc. (RSM.V) | Rare Earths & Titanium | PEA Jul 2026 | $715M | 44.2% | $160M | 20 yrs | 219 US$/t ROM |
| 204 | Copper Creek Faraday Copper Corp. (FDY.TO) | Copper | PEA May 2023 | $713M | 15.6% | $798M | 32 yrs | 1.9 USD/lb |
| 205 | Marimaca Oxide Deposit (MOD) Marimaca Copper Corp. (MARI.TO) | Copper | Feasibility Aug 2025 | $709M | 31% | $587M | 13 yrs | 2 USD/lb Cu |
| 206 | Fenelon Gold Project Wallbridge Mining Company Limited (WM.TO) | Gold | PEA Mar 2025 | C$706M | 21% | C$579M | 16 yrs | 1,046 USD/oz |
| 207 | Ying Ag-Pb-Zn Property Silvercorp Metals Inc. (SVM.TO) | Silver | Feasibility Jun 2024 | $699M | — | — | — | — |
| 208 | Lemhi Gold Project Freeman Gold Corp. (FMAN.V) | Gold | Feasibility Jun 2026 | $696M | 34.4% | $330M | 15 yrs | — |
| 209 | Yerington Copper Project Lion Copper and Gold Corp. (LEO.CN) | Copper | Pre-Feasibility Aug 2025 | $694M | 14.6% | $724M | 12 yrs | 2.7 USD/lb payable |
| 210 | Tia Maria Copper Project Southern Copper Corporation (SCCO) | Copper | Feasibility Mar 2022 | $676M | 16.6% | $1.75B | 20 yrs | — |
| 211 | Volta Grande Belo Sun Mining Corp. (BSX.TO) | Gold | Feasibility May 2015 | $665M | 26% | $298M | 17.2 yrs | 779 USD/oz |
| 212 | Enchi Gold Project - Spot Price Case Newcore Gold Ltd. (NCAU.V) | Gold | Pre-Feasibility Jun 2026 | $647M | 45% | $351M | 9.3 yrs | — |
| 213 | Bomboré Star Royalties Ltd. (STRR.V) | Silver | Feasibility Nov 2023 | $636M | — | — | 11 yrs | — |
| 214 | Bomboré Orezone Gold Corporation (ORE.TO) | Gold | Feasibility Nov 2023 | $636M | — | $58M | — | 2,200 USD/oz |
| 215 | Bomboré Phase II Expansion Orezone Gold Corporation (ORE.TO) | Gold | Feasibility Nov 2023 | $636M | — | $168M | — | — |
| 216 | Douta Gold Project Thor Explorations Ltd. (THX.V) | Gold | Pre-Feasibility Jan 2026 | $633M | 61% | $254M | 12.6 yrs | 1,890 USD/oz |
| 217 | Waihi North Project (Wharekirauponga) OceanaGold Corporation (OGC.TO) | Gold | Pre-Feasibility Dec 2024 | $621M | 24% | — | — | — |
| 218 | Waihi District - Alternative Case OceanaGold Corporation (OGC.TO) | Gold | Pre-Feasibility Dec 2024 | $621M | 24% | — | — | — |
| 219 | Waihi North Project OceanaGold Corporation (OGC.TO) | Gold | Pre-Feasibility Dec 2024 | $621M | 24% | — | — | — |
| 220 | El Brocal Compania de Minas Buenaventura S.A.A. (BVN) | Copper, Silver, Lead, Zinc | Resource Estimate Dec 2024 | $619M | — | — | 17 yrs | — |
| 221 | Northshore Property (Peter Mitchell Mine / E.W. Davis Works) Cleveland-Cliffs Inc. (CLF) | Iron (magnetite taconite pellets) | Feasibility Feb 2022 | $619M | — | — | 48 yrs | 80.1 USD/WLT Pellet |
| 222 | La Loutre Graphite Project Lomiko Metals Inc. (LMR.V) | Graphite | Pre-Feasibility May 2026 | C$617M | 24.7% | C$505M | 28 yrs | 514 US$/t conc. |
| 223 | La Loutre Lomiko Metals Inc. (LMR.V) | Graphite | Pre-Feasibility | C$617M | 24.7% | C$505M | 28 yrs | — |
| 224 | Johnson Tract Dolly Varden Silver Corp. (DV.V) | Gold | PEA May 2025 | $615M | 60% | $214M | 7 yrs | 860 USD/oz AuEq |
| 225 | Mineral Point Open Pit i-80 Gold Corp. (IAU.TO) | Gold | PEA Mar 2025 | $614M | 12% | — | 17 yrs | 1,400 USD/oz |
| 226 | Scottie Gold Mine (Toll Milling Scenario) Scottie Resources Corp. (SCOT.V) | Gold | PEA Oct 2025 | C$606M | 135.2% | — | — | — |
| 227 | Castelo de Sonhos TriStar Gold Inc. (TSG.V) | Gold | Pre-Feasibility May 2025 | $603M | 40% | $296M | 11 yrs | 1,111 USD/oz |
| 228 | Florida Canyon Mine Integra Resources Corp. (ITR.V) | Gold | Feasibility Jul 2026 | $601M | — | — | 8 yrs | 2,331 USD/oz |
| 229 | Florida Canyon Mine - 2026 Technical Report Base Case Integra Resources Corp. (ITR.V) | Gold | Feasibility Jul 2026 | $601M | — | — | 8 yrs | 2,331 USD/oz |
| 230 | Molo Modular Phase 2 NextSource Materials Inc. (NEXT.TO) | Graphite | PEA Jan 2022 | $593M | 31.4% | $156M | 26 yrs | — |
| 231 | United Taconite (UTAC) - Thunderbird Mine & Fairlane Facility Cleveland-Cliffs Inc. (CLF) | Iron (magnetite taconite, pellets) | Feasibility Dec 2021 | $591M | — | — | 51 yrs | — |
| 232 | Duparquet Gold Project First Mining Gold Corp. (FF.TO) | Gold | PEA Oct 2023 | $588M | 18% | $706M | 11 yrs | 976 USD/oz |
| 233 | El Domo Silvercorp Metals Inc. (SVM.TO) | Copper-Gold | Feasibility 2026 | $571M | 46% | $284M | 11.5 yrs | — |
| 234 | Cerro Las Minitas (CLM) - +15% Case Southern Silver Exploration Corp. (SSV.V) | Silver (Ag-Cu-Pb-Zn) | PEA Aug 2022 | $561M | 24.4% | — | — | — |
| 235 | Eau Claire Gold Project Fury Gold Mines Limited (FURY.TO) | Gold | Pre-Feasibility Jun 2026 | C$554M | 41% | C$217M | 11 yrs | 1,140 USD/oz |
| 236 | Lucky Friday Mine Hecla Mining Company (HL) | Silver, Lead, Zinc | Feasibility Feb 2022 | $554M | — | — | 17 yrs | — |
| 237 | North Island Copper and Gold Project (Hushamu & Red Dog) NorthIsle Copper and Gold Inc. (NCX.V) | Copper, Gold, Molybdenum, Pyrite | PEA Oct 2017 | C$550M | 14.3% | C$1.34B | — | — |
| 238 | Hugo North Extension (HNE) Lift 2 Entrée Resources Ltd. (ETG.TO) | Copper-Gold-Silver | PEA Oct 2021 | $541M | — | — | 22 yrs | 0.9 USD/lb payable Cu |
| 239 | Neves Project Atlas Lithium Corporation (ATLX) | Lithium (spodumene) | Feasibility Aug 2025 | $539M | 145% | $58M | 6.5 yrs | 489 USD/t SC5.5 |
| 240 | Quinchía Gold Project Tiger Gold Corp. (TIGR.V) | Gold | PEA Sep 2025 | $534M | 21.3% | $480M | — | 1,340 USD/oz |
| 241 | O'Brien Gold Project Globex Mining Enterprises Inc. (GMX.TO) | Gold | PEA Aug 2025 | C$532M | 47.6% | C$175M | 11 yrs | 1,058.5 USD/oz |
| 242 | São Jorge GoldMining Inc. (GOLD.TO) | Gold | PEA Jun 2026 | $532M | 42% | $202M | 10.6 yrs | — |
| 243 | Condor Gold Project Silvercorp Metals Inc. (SVM.TO) | Gold | PEA Jan 2026 | $522M | 29% | $292M | 13 yrs | 1,359 USD/EqOz-Payable |
| 244 | Kilbourne Graphite Project Titan Mining Corp. (TI.TO) | Graphite | PEA | $513M | 37% | $156M | 13 yrs | — |
| 245 | Opemiska XXIX Metal Corp. (XXIX.V) | Copper-Gold | PEA Oct 2025 | C$505M | 27% | — | 17 yrs | — |
| 246 | Cerro Las Minitas Southern Silver Exploration Corp. (SSV.V) | Silver | PEA Jun 2024 | $501M | 21.2% | $388M | 17.1 yrs | 13.2 USD/oz AgEq |
| 247 | Carangas Silvercorp Metals Inc. (SVM.TO) | Silver | PEA 2024 | $501M | 26% | $324M | 16 yrs | 8 USD/oz |
| 248 | Kandiolé Gold Project Roscan Gold Corporation (ROS.V) | Gold | PEA Feb 2026 | $498M | 43% | $219M | 13 yrs | 1,568 USD/oz |
| 249 | Enchi Gold Project Newcore Gold Ltd. (NCAU.V) | Gold | Pre-Feasibility Aug 2026 | $496M | 37% | $351M | 9.3 yrs | 2,290 USD/oz |
| 250 | Chvaletice Manganese Project Euro Manganese Inc. (EMN.V) | Manganese | PEA Jun 2026 | $492M | 13.8% | $825M | 26 yrs | — |
| 251 | Battery Hill Electric Royalties Ltd. (ELEC.V) | Manganese | PEA May 2022 | $486M | 25% | — | 47 yrs | — |
| 252 | Beartrack-Arnett Gold Project Revival Gold Inc. (RVG.V) | Gold | Pre-Feasibility Aug 2023 | $484M | 80% | $109M | 8 yrs | 1,248 USD/oz |
| 253 | Aley Niobium Project Taseko Mines Limited (TGB) | Niobium | Feasibility Sep 2014 | C$480M | 14% | — | 24 yrs | — |
| 254 | Minera Valle Central (MVC) – Cauquenes Phase Two Expansion Amerigo Resources Ltd. (ARG.TO) | Copper | PEA Dec 2016 | $480M | — | $30M | 21 yrs | — |
| 255 | El Arco Project Southern Copper Corporation (SCCO) | Copper | Pre-Feasibility Mar 2022 | $475M | 12.1% | — | 35 yrs | — |
| 256 | Borralha Tungsten Project Allied Critical Metals Corp. (ACM.CN) | Tungsten (WO₃) | PEA Apr 2026 | C$473M | 48.8% | C$124M | 11 yrs | 303 USD/mtu |
| 257 | Project Dynamo (Phase 1) Aclara Resources Inc. (ARA.TO) | Rare Earth Separation | Scoping Study | $470M | 25.2% | $277M | — | — |
| 258 | Project Dynamo Aclara Resources Inc. (ARA.TO) | Rare Earth Oxides (NdPr, Dy, Tb) | PEA Apr 2026 | $470M | 25.2% | $277M | — | — |
| 259 | Darling Range Bauxite (Huntly & Willowdale) Alcoa Corporation (AA) | Bauxite | Pre-Feasibility Feb 2023 | $464M | — | — | 9 yrs | — |
| 260 | Porvenir Mineros S.A. (MSA.TO) | Gold | Pre-Feasibility Mar 2026 | $460M | 37.9% | $207M | 10 yrs | 1,295 USD/oz AuEq |
| 261 | Porvenir (Nicaragua) Mineros S.A. (MSA.TO) | Gold/Polymetallic (Au, Ag, Zn, Cu) | Pre-Feasibility Mar 2026 | $460M | 37.9% | $207M | 10 yrs | 1,295 USD/oz AuEq |
| 262 | Shovelnose Westhaven Gold Corp. (WHN.V) | Gold | PEA Apr 2025 | C$454M | 43.2% | C$185M | 11.1 yrs | 836 USD/oz AuEq |
| 263 | Camino Rojo Orla Mining Ltd. (OLA.TO) | Gold | Feasibility Jan 2021 | $452M | 62% | $134M | 10.4 yrs | 543 USD/oz Au |
| 264 | Buckreef Gold Project TRX Gold Corporation (TRX.TO) | Gold | PEA May 2025 | $442M | — | $89M | 17.6 yrs | 1,206 USD/oz |
| 265 | UAE Battery Anode Facility (BAF) NextSource Materials Inc. (NEXT.TO) | Graphite (Anode Materials) | Pre-Feasibility Oct 2025 | $442M | 24.2% | $291M | — | — |
| 266 | Nueva Recuperada Project (Tangana + Plata Mining Units) Silver X Mining Corp. (AGX.V) | Silver | PEA Sep 2025 | $440M | 69% | $82M | 14 yrs | 15.8 USD/oz AgEq |
| 267 | Nueva Recuperada Silver Project (Tangana + Plata) Silver X Mining Corp. (AGX.V) | Silver | PEA Sep 2025 | $440M | 69% | $82M | 14 yrs | 15.8 USD/oz AgEq |
| 268 | Nueva Recuperada (Tangana + Plata) Silver X Mining Corp. (AGX.V) | Silver | PEA Sep 2025 | $440M | 69% | $82M | 14 yrs | 15.8 USD/oz AgEq |
| 269 | Tonopah West Project Blackrock Silver Corp. (BRC.V) | Silver | PEA May 2026 | $437M | 28% | $190M | 11.2 yrs | 17.4 US$/oz AgEq |
| 270 | Karowe Diamond Mine (KDM) Lucara Diamond Corp. (LUC.TO) | Diamonds | Feasibility Sep 2025 | $432M | — | $779M | — | — |
| 271 | Karowe Diamond Mine Lucara Diamond Corp. (LUC.TO) | Diamonds | Feasibility Sep 2025 | $432M | — | $779M | — | — |
| 272 | Ana Paula Project Heliostar Metals Ltd. (HSTR.V) | Gold | PEA Nov 2025 | $426M | 28.1% | $300M | 9 yrs | 1,011 USD/oz |
| 273 | Cerro del Gallo Project Heliostar Metals Ltd. (HSTR.V) | Gold | Pre-Feasibility Dec 2025 | $424M | 33.1% | $195M | 15 yrs | 1,390 USD/GEO |
| 274 | Granite Creek Open Pit i-80 Gold Corp. (IAU.TO) | Gold | PEA Mar 2025 | $421M | 30% | — | 10 yrs | 1,225 USD/oz |
| 275 | Alto Paraná Titanium Project Uranium Energy Corp. (UEC) | Titanium (ilmenite), high titania slag, pig iron | PEA Nov 2023 | $419M | 21% | $338M | 24 yrs | — |
| 276 | Los Ricos North GoGold Resources Inc. (GGD.TO) | Silver (with Gold and base metals) | PEA May 2023 | $413M | — | — | — | — |
| 277 | Sleeper Gold-Silver Project Paramount Gold and Silver Corp. (PZG) | Gold, Silver | Resource Estimate Aug 2023 | $402M | 45% | $201M | 17 yrs | 2,407 USD/oz |
| 278 | True North Gold Project 1911 Gold Corporation (AUMB.V) | Gold | PEA Feb 2026 | C$391M | 105% | C$59M | 11 yrs | 1,897 USD/oz |
| 279 | Samapleu Project Sama Resources Inc. (SME.V) | Nickel, Copper, Iron | PEA Jun 2020 | $391M | 27.2% | $282M | 20 yrs | — |
| 280 | Cadillac Project (PEA reference on timeline) Cartier Resources Inc. (ECR.V) | Gold | PEA undefined 2022 | C$388M | 21% | — | — | — |
| 281 | Condestable Mine (Condestable & Raúl) Rio2 Limited (RIO.TO) | Copper | Feasibility Apr 2024 | $386M | — | — | 13.2 yrs | — |
| 282 | Grassy Mountain Paramount Gold and Silver Corp. (PZG) | Gold | Feasibility May 2026 | $375M | 39% | $190M | 9.3 yrs | 1,442 USD/oz |
| 283 | Toquepala Southern Copper Corporation (SCCO) | Copper | Feasibility Feb 2025 | $374M | — | — | 41.2 yrs | — |
| 284 | Molo Graphite Expansion NextSource Materials Inc. (NEXT.TO) | Graphite | Feasibility Jan 2024 | $370M | 29% | $187M | — | 714.3 USD/t concentrate |
| 285 | Alacran Project Cordoba Minerals Corp. (CDB.V) | Copper, Gold, Silver | Feasibility Dec 2023 | $360M | 23.8% | $420M | 14.2 yrs | 1.5 USD/lb Cu |
| 286 | Casa Berardi Mine Hecla Mining Company (HL) | Gold | Feasibility Feb 2024 | $356M | — | — | 14 yrs | — |
| 287 | Los Ricos South GoGold Resources Inc. (GGD.TO) | Silver | Feasibility Jan 2025 | $355M | 28% | $227M | 15 yrs | 12.3 USD/oz AgEq |
| 288 | Cerro Las Minitas (CLM) Southern Silver Exploration Corp. (SSV.V) | Silver | PEA Aug 2022 | $349M | 17.9% | $341M | 15 yrs | 13.3 USD/oz AgEq |
| 289 | Molo Graphite Mine NextSource Materials Inc. (NEXT.TO) | Graphite | Feasibility Mar 2025 | $348M | 17.5% | $291M | 34 yrs | — |
| 290 | Condestable Mine Rio2 Limited (RIO.TO) | Copper | Feasibility Feb 2024 | $346M | — | — | — | 2.3 USD/lb |
| 291 | Asanko Gold Mine Galiano Gold Inc. (GAU.TO) | Gold | Feasibility Mar 2023 | $343M | — | $58M | 8.5 yrs | 1,143 USD/oz |
| 292 | Raleigh Lake ILC Critical Minerals Corp. (ILC.V) | Lithium, Rubidium | PEA Dec 2023 | C$342M | 44.3% | C$112M | 9 yrs | 993 CAD/t SC6 |
| 293 | Copperstone Project Minera Alamos Inc. (MAI.V) | Gold | Feasibility Sep 2026 | $341M | 111% | $57M | 6.3 yrs | 1,338 USD/oz |
| 294 | Goliath Gold Complex NexGold Mining Corp. (NEXG.V) | Gold | Pre-Feasibility Mar 2023 | C$336M | 25.4% | C$335M | 13 yrs | 1,037 USD/oz |
| 295 | Galaxy Gold Mine Golconda Gold Ltd. (GG.V) | Gold | Production Feb 2026 | $336M | — | — | 20 yrs | — |
| 296 | Carmacks Cascadia Minerals Ltd. (CAM.V) | Copper-Gold | PEA Nov 2022 | C$330M | 38% | C$220M | 9 yrs | — |
| 297 | Goldboro Gold Project NexGold Mining Corp. (NEXG.V) | Gold | Feasibility Jan 2022 | C$328M | 25.5% | C$271M | 10.9 yrs | 849 USD/oz |
| 298 | Zancudo⚑ Denarius Metals Corp. (DMET) | Au, Ag | PEA Mar 2026 | $324M | 558.5% | $11M | 11 yrs | 2,482 USD/oz |
| 299 | Madsen⚑ Star Royalties Ltd. (STRR.V) | Gold | Pre-Feasibility 2025 | C$315M | 255% | C$44M | 6 yrs | 1,681 USD/oz |
| 300 | Cusi Mine - Upside Case Silverco Mining Inc. (SICO.V) | Silver | PEA Apr 2026 | $312M | 186.9% | — | — | — |
| 301 | Entrée/Oyu Tolgoi Joint Venture Project – Hugo North Extension Lift 2 Entrée Resources Ltd. (ETG.TO) | Copper | PEA Oct 2021 | $306M | — | $1.82B | — | — |
| 302 | Hugo North Extension Lift 2 (2021 PEA) Entrée Resources Ltd. (ETG.TO) | Copper, Gold, Silver | PEA Oct 2021 | $306M | — | — | — | — |
| 303 | Oyu Tolgoi / Hugo North Extension (HNE) Lift 2 Entrée Resources Ltd. (ETG.TO) | Copper-Gold | PEA Oct 2021 | $306M | — | — | 22 yrs | 0.9 USD/lb payable Cu |
| 304 | Entrée/Oyu Tolgoi JV Property (Hugo North Extension Lift 2) Entrée Resources Ltd. (ETG.TO) | Copper, Gold, Silver | PEA Oct 2021 | $306M | — | — | 22 yrs | 0.9 USD/lb payable Cu |
| 305 | Eagle Mountain Gold Project Mako Mining Corp. (MKO.V) | Gold | PEA Mar 2024 | $292M | 57% | — | 15 yrs | 829 USD/oz |
| 306 | Goldfields Fortune Bay Corp. (FOR.V) | Gold | PEA Nov 2022 | C$285M | 35.2% | C$234M | 8.3 yrs | 889 USD/oz Au |
| 307 | Grey Fox McEwen Mining Inc. (MUX.TO) | Gold | Pre-Feasibility Mar 2026 | $282M | 24.8% | $177M | — | — |
| 308 | Minera Valle Central (MVC) - Cauquenes Expansion Project Amerigo Resources Ltd. (ARG.TO) | Copper | Feasibility Jan 2014 | $279M | — | $140M | — | — |
| 309 | Samapleu and Grata Deposits Sama Resources Inc. (SME.V) | Nickel, Copper | PEA May 2024 | $277M | 21.9% | $338M | 16.1 yrs | 4.1 USD/lb [Cu+Ni] payable |
| 310 | Cove Underground i-80 Gold Corp. (IAU.TO) | Gold | PEA Mar 2025 | $271M | 30% | — | — | — |
| 311 | Hibbing Taconite (HibTac) Cleveland-Cliffs Inc. (CLF) | Iron ore (taconite pellets) | Resource Estimate Dec 2021 | $269M | — | — | 5 yrs | — |
| 312 | Mexican Hat Gold Project GMV Minerals Inc. (GMV.V) | Gold | PEA Sep 2025 | $268M | 50.2% | $90M | 10 yrs | 1,545 USD/oz |
| 313 | Samapleu-Grata Sama Resources Inc. (SME.V) | Nickel, Copper, PGE | PEA Mar 2024 | $257M | 22.3% | $338M | 16.1 yrs | 4 USD/lb Ni and Cu |
| 314 | Churchrock-Crownpoint Laramide Resources Ltd. (LAM.TO) | Uranium (U3O8) | PEA Jan 2024 | $249M | 56% | $48M | 31 yrs | 34.8 USD/lb |
| 315 | Churchrock-Crownpoint (Churchrock/Crownpoint) Laramide Resources Ltd. (LAM.TO) | Uranium (U3O8) | PEA Jan 2024 | $249M | 56% | $48M | 31 yrs | 34.8 USD/lb |
| 316 | Woxna Graphite (Kringel Deposit) Leading Edge Materials Corp. (LEM.V) | Graphite | PEA 2021 | $248M | 37.4% | $121M | — | — |
| 317 | Woxna Graphite Project (Kringel deposit) Leading Edge Materials Corp. (LEM.V) | Graphite | PEA 2021 | $248M | 37.4% | $121M | — | — |
| 318 | Lost Creek Ur-Energy Inc. (URE.TO) | Uranium | Production Mar 2026 | $244M | 65.7% | — | 13 yrs | 40.2 USD/lb |
| 319 | La Colorada Mine Heliostar Metals Ltd. (HSTR.V) | Gold | Production 2026 | $243M | 168.4% | $45M | 6 yrs | — |
| 320 | Altan Tsagaan Ovoo Project (ATO) Steppe Gold Ltd. (STGO.TO) | Gold | Feasibility Aug 2022 | $242M | — | $129M | 14 yrs | — |
| 321 | Churchrock–Crownpoint (Crownpoint-Churchrock) Laramide Resources Ltd. (LAM.TO) | Uranium | PEA Jan 2024 | $239M | 56% | $48M | 32 yrs | 34.8 USD/lb |
| 322 | Matawinie Graphite Mine Nouveau Monde Graphite Inc. (NOU.TO) | Graphite | Feasibility Nov 2025 | C$238M | 15.8% | C$421M | 25 yrs | — |
| 323 | Carmacks (Base Case) Cascadia Minerals Ltd. (CAM.V) | Copper-Gold | PEA Nov 2022 | C$231M | 29% | — | 9 yrs | — |
| 324 | Copperstone Star Royalties Ltd. (STRR.V) | Gold | PEA 2025 | $227M | 170.9% | $36M | 6 yrs | 1,259 USD/oz |
| 325 | Tarkwa Gold Mine Gold Fields Limited (GFI) | Gold | Resource Estimate Mar 2026 | $226M | — | — | 17 yrs | — |
| 326 | Johnson Tract Project Contango ORE Inc. (CTGO) | Gold (Polymetallic - Gold, Zinc, Copper, Silver, Lead) | PEA May 2025 | $225M | 30.2% | $214M | 12 yrs | — |
| 327 | Cerro Caliche Gold Project Sonoro Gold Corp. (SGO.V) | Gold | PEA Mar 2026 | $224M | 50% | $83M | 10 yrs | 1,902 USD/oz |
| 328 | Juruti Bauxite Mine Alcoa Corporation (AA) | Bauxite | Resource Estimate Dec 2021 | $224M | — | — | 11 yrs | — |
| 329 | St Ives Gold Mine Gold Fields Limited (GFI) | Gold | Production Mar 2025 | $221M | — | — | 9 yrs | — |
| 330 | Scottie Gold Mine (DSO Mine Plan) Scottie Resources Corp. (SCOT.V) | Gold | PEA Oct 2025 | C$216M | 60.3% | C$129M | 7 yrs | — |
| 331 | Scottie Gold Mine (Blueberry Contact Zone & Scottie Mine) Scottie Resources Corp. (SCOT.V) | Gold | PEA Oct 2025 | C$216M | 60.3% | C$129M | 7 yrs | — |
| 332 | Scottie Gold Mine - DSO (Blueberry + Scottie Mine) Scottie Resources Corp. (SCOT.V) | Gold | PEA Oct 2025 | C$216M | 60.3% | C$129M | 7 yrs | — |
| 333 | Back Forty Gold Resource Corporation (GORO) | Gold | PEA Oct 2023 | $214M | 25.7% | $325M | 9 yrs | 920 USD/oz |
| 334 | Estrades Galway Metals Inc. (GWM.V) | Polymetallic (Cu, Pb, Zn, Au, Ag) | PEA Feb 2026 | C$212M | 33% | C$117M | 8 yrs | 1,987 USD/oz AuEq paid |
| 335 | Doby George Western Exploration Inc. (WEX.V) | Gold | PEA May 2025 | $211M | 62.2% | $115M | 4.2 yrs | 1,197 USD/oz |
| 336 | Fenix Gold Rio2 Limited (RIO.TO) | Gold | Feasibility Oct 2023 | $210M | 28.5% | $117M | 17 yrs | 1,237.1 USD/oz |
| 337 | Zancudo⚑ Star Royalties Ltd. (STRR.V) | Gold | PEA Dec 2025 | $206M | 287% | $15M | 10.3 yrs | 1,059 USD/oz |
| 338 | Sandman Borealis Mining Company Ltd. (BOGO.V) | Gold | PEA 2026 | $203M | 104.9% | $36M | 9 yrs | 1,823 USD/oz |
| 339 | Metals and Alloys Aclara Resources Inc. (ARA.TO) | Rare Earth Metals and Alloys (NdPr, FeDy, Tb, NdFeB) | Pre-Feasibility Apr 2026 | $203M | 25% | $149M | — | — |
| 340 | Aclara Metals (Metals and Alloys) Aclara Resources Inc. (ARA.TO) | Rare Earth Metals and Alloys | Scoping Study | $203M | 25% | $149M | — | — |
| 341 | Romero Goldquest Mining Corp. (GQC.V) | Gold-Copper | Pre-Feasibility Nov 2016 | $203M | 28% | $158M | 8 yrs | 595 USD/oz |
| 342 | Aclara Metals Aclara Resources Inc. (ARA.TO) | Rare Earth Metals (NdPr, Dy, Tb, NdFeB) | Pre-Feasibility | $203M | 25% | $149M | — | — |
| 343 | Nyanzaga Gold Mine Perseus Mining Limited (PRU.TO) | Gold | Feasibility Jun 2025 | $202M | 19% | $523M | 16 yrs | 1,621 USD/oz |
| 344 | Crocodile River Mine (CRM) Eastern Platinum Limited (ELR.TO) | PGM (Platinum Group Metals) | Feasibility 2022 | $202M | 118% | $68M | 22 yrs | 1,502 USD/oz 4E |
| 345 | Crocodile River Mine Eastern Platinum Limited (ELR.TO) | PGM (Platinum Group Metals) and Chrome | Feasibility 2022 | $202M | 118% | $68M | 22 yrs | 1,502 USD/oz 4E |
| 346 | Georgia Lake Mine Rock Tech Lithium Inc. (RCK.V) | Lithium | Feasibility Aug 2026 | C$200M | 36% | C$249M | — | — |
| 347 | Mantoverde Pyrite Augmentation Capstone Copper Corp. (CS.TO) | Copper | — | $200M | — | $45M | — | — |
| 348 | Velvet-Wood & Slick Rock (Combined PEA) Anfield Energy Inc. (AEC.V) | Uranium & Vanadium | PEA May 2023 | $197M | 33% | $112M | 15 yrs | — |
| 349 | Crean Hill Project Magna Mining Inc. (NICU.V) | Nickel, Copper, PGM | PEA Jul 2024 | C$194M | 129% | — | — | — |
| 350 | Zonia World Copper Ltd. (WCU.V) | Copper | PEA Mar 2018 | $192M | 29% | — | 8.6 yrs | — |
| 351 | San Gabriel Project Compania de Minas Buenaventura S.A.A. (BVN) | Gold | Feasibility Apr 2025 | $191M | 21.8% | $177M | 14.2 yrs | 1,568 US$/oz Au |
| 352 | Coosa Project (Coosa Graphite) Westwater Resources Inc. (WWR) | Graphite | PEA Dec 2023 | $190M | 24.2% | $152M | 22 yrs | — |
| 353 | Coosa Graphite Project Westwater Resources Inc. (WWR) | Graphite | PEA Sep 2023 | $190M | 24.2% | $152M | 22 yrs | — |
| 354 | Hugo North Extension (HNE) Lift 1 Entrée Resources Ltd. (ETG.TO) | Copper-Gold-Silver | Feasibility May 2021 | $185M | — | — | 17 yrs | 1.3 USD/lb payable Cu |
| 355 | Oyu Tolgoi – Hugo North Extension (HNE) Lift 1 Entrée Resources Ltd. (ETG.TO) | Copper-Gold | Feasibility May 2021 | $185M | — | $55M | 17 yrs | 1.3 USD/lb payable copper |
| 356 | Summit Mine Golconda Gold Ltd. (GG.V) | Silver/Gold | PEA Feb 2026 | $182M | — | — | 7 yrs | — |
| 357 | Nueva Recuperada / Tangana Project Silver X Mining Corp. (AGX.V) | Silver | PEA Apr 2023 | $175M | 39% | — | — | 26.9 USD/oz Ag Eq |
| 358 | Scotia Mine (EDM Resources) Fancamp Exploration Ltd. (FNC.V) | Zinc | Pre-Feasibility 2021 | C$174M | 69% | C$31M | 14 yrs | — |
| 359 | Caribou Complex / Murray Brook Deposit Puma Exploration Inc. (PUMA.V) | Copper | PEA 2025 | C$171M | 36% | — | — | — |
| 360 | Bayan Khundii Gold Project (BK Gold Deposit & Dark Horse Mane Gold Deposit) Erdene Resource Development Corp. (ERD.TO) | Gold | Feasibility Aug 2023 | $170M | 35.3% | $100M | 6.5 yrs | — |
| 361 | Bayan Khundii Gold Project (BK & Dark Horse Mane) Erdene Resource Development Corp. (ERD.TO) | Gold | Feasibility Aug 2023 | $170M | 35.3% | $100M | 8.5 yrs | — |
| 362 | Murray Brook + Caribou Processing Complex (Combined Strategy)⚑ Canadian Copper Inc. (CCI.CN) | Copper-Zinc-Lead-Silver | PEA Jun 2025 | C$169M | 41% | C$64M | 13.2 yrs | 3.1 USD/lb CuEq |
| 363 | Murray Brook Project Canadian Copper Inc. (CCI.CN) | Copper, Zinc, Lead, Silver | PEA Jul 2025 | C$169M | 35.4% | C$64M | 13.2 yrs | 3.2 USD/lb CuEq |
| 364 | Bathurst Complex (Murray Brook + Caribou) Canadian Copper Inc. (CCI.CN) | Copper-Zinc-Lead-Silver | PEA Jun 2025 | C$169M | 36% | C$64M | 13.2 yrs | 3.1 USD/lb CuEq |
| 365 | Murray Brook Caribou Complex (Bathurst Copper-Zinc Project)⚑ Canadian Copper Inc. (CCI.CN) | Copper, Zinc, Lead, Silver, Gold | PEA Jun 2025 | C$169M | 41% | C$64M | 13.2 yrs | 3.1 USD/lb CuEq |
| 366 | Murray Brook + Caribou Complex (Combined Strategy)⚑ Canadian Copper Inc. (CCI.CN) | Copper-Zinc-Lead-Silver-Gold | PEA Jun 2025 | C$169M | 36% | C$64M | 13.2 yrs | 3.1 USD/lb CuEq |
| 367 | Copperwood Highland Copper Company Inc. (HI.V) | Copper | Feasibility 2023 | $168M | 18% | $391M | 11 yrs | 2 USD/lb |
| 368 | Tahuehueto Luca Mining Corp. (LUCA.V) | Gold-Silver-Lead-Zinc-Copper | Pre-Feasibility Apr 2022 | $161M | 65.5% | — | 10.9 yrs | — |
| 369 | Thunder Bay North Project Clean Air Metals Inc. (AIR.V) | Platinum Group Elements (PGE), Nickel, Copper | PEA Nov 2025 | C$158M | 32% | C$90M | 11 yrs | — |
| 370 | Thunder Bay North Project (Current & Escape Deposits) Clean Air Metals Inc. (AIR.V) | PGE-Ni-Cu (Platinum, Palladium, Nickel, Copper) | PEA Nov 2025 | C$158M | 32% | C$90M | 11 yrs | — |
| 371 | Tantahuatay Compania de Minas Buenaventura S.A.A. (BVN) | Gold | Resource Estimate Dec 2021 | $157M | — | — | 6 yrs | — |
| 372 | Granite Creek Underground i-80 Gold Corp. (IAU.TO) | Gold | PEA Mar 2025 | $155M | 84% | — | 8 yrs | 1,597 USD/oz |
| 373 | Mesteña Grande Uranium Project enCore Energy Corp. (EU.V) | Uranium | PEA Dec 2024 | $154M | — | $108M | — | 25.5 USD/lb U3O8 |
| 374 | Boroo Steppe Gold Ltd. (STGO.TO) | Gold | Feasibility Feb 2024 | $152M | — | — | 8 yrs | — |
| 375 | Van Dyke Copper Project Copper Fox Metals Inc. (CUU.V) | Copper | Resource Estimate Jan 2020 | $150M | 27.9% | $291M | 11 yrs | 1.1 USD/lb |
| 376 | Lagoa Salgada Cerrado Gold Inc. (CERT.V) | Zinc (VMS - Zn, Cu, Pb, Sn, Au, Ag) | Feasibility Jul 2023 | $147M | 39% | — | — | 0.8 USD/lb ZnEq |
| 377 | Nickel Shäw Ni-Cu-PGM Project Nickel Creek Platinum Corp. (NCP.V) | Nickel, Copper, PGM (Platinum, Palladium) | Pre-Feasibility Oct 2023 | C$143M | 5.8% | C$1.69B | 19.1 yrs | — |
| 378 | Gas Hills Project enCore Energy Corp. (EU.V) | Uranium | PEA Feb 2025 | $142M | 50.2% | $55M | 11 yrs | — |
| 379 | River Valley Palladium Project New Age Metals Inc. (NAM.V) | Palladium | PEA 2023 | $140M | 11% | $269M | 16 yrs | — |
| 380 | River Valley Project New Age Metals Inc. (NAM.V) | Palladium (Pd), Platinum (Pt), Gold (Au) | PEA Jun 2023 | C$140M | 11.3% | C$269M | 16 yrs | 1,518 USD/oz PdEq |
| 381 | South Deep Gold Mine Gold Fields Limited (GFI) | Gold | Production Mar 2025 | $139M | — | — | 85 yrs | — |
| 382 | Waihi District OceanaGold Corporation (OGC.TO) | Gold | Pre-Feasibility Dec 2024 | $138M | 9.2% | $556M | 15 yrs | 994 USD/oz |
| 383 | Puna Operations (Chinchillas & Pirquitas) SSR Mining Inc. (SSRM) | Silver (lead, zinc by-products) | Feasibility Dec 2023 | $136M | — | — | 2.5 yrs | 15.9 USD/oz Ag |
| 384 | Dewey Burdock Project⚑ enCore Energy Corp. (EU.V) | Uranium | Resource Estimate Oct 2024 | $134M | 33% | $264M | — | — |
| 385 | Empire Mine ExGen Resources Inc. (EXG.V) | Copper, Gold, Silver | Pre-Feasibility Sep 2024 | $132M | 40.2% | — | 8 yrs | — |
| 386 | Hugo North Extension Lift 1 Entrée Resources Ltd. (ETG.TO) | Copper, Gold, Silver | Feasibility Oct 2021 | $131M | — | — | — | 1.3 USD/lb payable copper |
| 387 | Otjikoto Mine - Antelope Deposit B2Gold Corp. (BTO.TO) | Gold | PEA Feb 2025 | $131M | 35% | $129M | 5 yrs | 1,095 USD/oz |
| 388 | Antelope Deposit B2Gold Corp. (BTO.TO) | Gold | PEA Feb 2025 | $131M | 35% | $129M | 5 yrs | 1,095 USD/oz |
| 389 | Entrée/Oyu Tolgoi JV Property (Hugo North Extension Lift 1) Entrée Resources Ltd. (ETG.TO) | Copper, Gold, Silver | Feasibility May 2021 | $131M | — | — | 17 yrs | 1.3 USD/lb payable Cu |
| 390 | Entrée/Oyu Tolgoi Joint Venture Project – Hugo North Extension Lift 1 Entrée Resources Ltd. (ETG.TO) | Copper-Gold | Feasibility Oct 2021 | $131M | — | — | — | 1.3 USD/lb payable Cu |
| 391 | Antelope Deposit (Otjikoto) B2Gold Corp. (BTO.TO) | Gold | PEA 2025 | $131M | 35% | $129M | 5 yrs | 1,095 USD/oz |
| 392 | Archimedes Underground i-80 Gold Corp. (IAU.TO) | Gold | PEA Mar 2025 | $127M | 23% | $49M | 10 yrs | 1,893 USD/oz |
| 393 | Black Butte Copper Project Sandfire Resources America Inc. (SFR.V) | Copper | Pre-Feasibility Jul 2026 | $126M | 13.3% | $474M | 12 yrs | 3 USD/lb |
| 394 | Pegmont Lead-Zinc Project Vendetta Mining Corp. (VTT.V) | Lead-Zinc | PEA 2019 | A$124M | 24% | A$170M | 10 yrs | 0.7 AUD/lb payable Lead |
| 395 | Pegmont Vendetta Mining Corp. (VTT.V) | Lead-Zinc-Silver | PEA Jul 2018 | A$124M | 24% | A$170M | — | 0.7 A$/lb payable lead |
| 396 | Rozino Velocity Minerals Ltd. (VLC.V) | Gold | Pre-Feasibility Dec 2021 | $123M | 27.4% | $87M | 7 yrs | 755 USD/oz |
| 397 | Costa Fuego - Huasco Water (Stage 1) Hot Chili Limited (HCH.V) | Water | Pre-Feasibility | $122M | 19% | $151M | — | — |
| 398 | Huasco Water Asset Hot Chili Limited (HCH.V) | Water | Pre-Feasibility May 2026 | $122M | 19% | $151M | — | — |
| 399 | Darling Range Alcoa Corporation (AA) | Bauxite | Feasibility Feb 2024 | $122M | — | — | 9 yrs | — |
| 400 | Puquios Camino Minerals Corporation (COR.V) | Copper | Pre-Feasibility 2025 | $118M | 23.4% | $142M | 14.2 yrs | 1.7 USD/lb Cu |
| 401 | Caber Complex (Caber, Caber Nord, PD1) Nuvau Minerals Corp. (NMC.V) | Zinc (ZnEq) | PEA Jul 2023 | $116M | 20% | $172M | — | — |
| 402 | Caber Complex Nuvau Minerals Corp. (NMC.V) | Copper-Zinc (base metals) | PEA Jul 2023 | C$116M | 20% | — | 9.5 yrs | 1.3 USD/lb Cu |
| 403 | Don David Gold Mine (Arista Mine) Gold Resource Corporation (GORO) | Gold, Silver, Copper, Lead, Zinc | Feasibility Dec 2021 | $114M | — | $75M | 6 yrs | 88 USD/t |
| 404 | Don David Gold Mine (Arista Mine & Alta Gracia Mine) Gold Resource Corporation (GORO) | Gold, Silver, Base Metals (Copper, Lead, Zinc) | Feasibility Dec 2021 | $114M | — | $75M | 6 yrs | — |
| 405 | Minera Don Nicolas Cerrado Gold Inc. (CERT.V) | Gold | PEA Sep 2024 | $111M | — | $0M | 5 yrs | 1,146 USD/oz |
| 406 | Bunker Hill Mine - PEA Summary Bunker Hill Mining Corp. (BNKR.V) | Lead, Silver, Zinc | PEA Jan 2022 | $108M | 35.2% | — | — | — |
| 407 | Beartrack-Arnett Heap Leach Project Revival Gold Inc. (RVG.V) | Gold | Pre-Feasibility Jun 2023 | $105M | 24.3% | $109M | 8.1 yrs | 1,235 USD/oz |
| 408 | Dyke #5 – Sirmac Property⚑ Vision Lithium Inc. (VLI.V) | Lithium (spodumene) | PEA Jan 2023 | C$105M | 483.7% | C$3M | 4 yrs | — |
| 409 | Cusi Mine Silverco Mining Inc. (SICO.V) | Silver | PEA Apr 2026 | $104M | 94.8% | $19M | 9 yrs | 26.8 USD/oz AgEq |
| 410 | Soledad Mountain Andean Precious Metals Corp. (APM.TO) | Gold | Feasibility Jan 2024 | $102M | — | — | 5 yrs | — |
| 411 | Johnny Lee Deposit - Black Butte Copper Project Sandfire Resources America Inc. (SFR.V) | Copper | Pre-Feasibility Dec 2025 | $99M | 11.3% | $474M | 8 yrs | 2.8 USD/lb |
| 412 | Black Butte Copper Project - Johnny Lee Deposit Sandfire Resources America Inc. (SFR.V) | Copper | Pre-Feasibility Dec 2025 | $99M | 11.3% | $474M | 8 yrs | 2.8 USD/lb |
| 413 | Seabee Gold Operation SSR Mining Inc. (SSRM) | Gold | Feasibility Dec 2023 | $95M | — | — | 4.2 yrs | 2,231 USD/oz |
| 414 | La Plata Project Atico Mining Corporation (ATY.V) | Copper, Gold, Zinc, Silver | Feasibility Aug 2024 | $93M | 25% | $91M | 8.1 yrs | 1.7 USD/lbs Cu Eq |
| 415 | Velardeña Project⚑ Golden Minerals Company (AUMN) | Silver | PEA Aug 2023 | $88M | 860.7% | $7M | 10.5 yrs | — |
| 416 | San Jose de Gracia Mine DynaResource Inc. (DYNR) | Gold | Feasibility Mar 2025 | $84M | — | — | 7 yrs | 1,720 USD/oz AuEq |
| 417 | Cebolleta Premier American Uranium Inc. (PUR.V) | Uranium | PEA May 2025 | $84M | 17.7% | $113M | 13 yrs | — |
| 418 | Empire State Mines (ESM) #4 Mine - Underground Titan Mining Corp. (TI.TO) | Zinc | PEA Jan 2025 | $83M | — | — | 9 yrs | — |
| 419 | Shirley Basin Ur-Energy Inc. (URE.TO) | Uranium | Production Mar 2026 | $83M | 69% | — | 9 yrs | 50 USD/lb |
| 420 | Empire State Mines (ESM) - Underground Titan Mining Corp. (TI.TO) | Zinc | PEA Jan 2025 | $83M | — | $27M | 9 yrs | — |
| 421 | Empire State Mines Titan Mining Corp. (TI.TO) | Zinc | PEA 2021 | $81M | — | $11M | 7 yrs | — |
| 422 | Cuiú Cuiú Gold Project Cabral Gold Inc. (CBR.V) | Gold | Pre-Feasibility Jul 2025 | $74M | 77.8% | $38M | 6.2 yrs | 1,209.9 USD/oz Au |
| 423 | Cuiú Cuiú Gold District Cabral Gold Inc. (CBR.V) | Gold | Pre-Feasibility Jul 2025 | $74M | 77.8% | $38M | 6.2 yrs | 1,209.9 USD/oz Au |
| 424 | Minorca Property Cleveland-Cliffs Inc. (CLF) | Iron (magnetite/taconite) | Feasibility Feb 2022 | $70M | — | — | 14 yrs | 85.5 USD/WLT pellet |
| 425 | La Fortuna Minera Alamos Inc. (MAI.V) | Gold | PEA Jul 2018 | $70M | 93% | $27M | 5 yrs | 440 USD/oz |
| 426 | Oxide Tailings Project Avino Silver & Gold Mines Ltd. (ASM.TO) | Silver | Pre-Feasibility Feb 2024 | $61M | 26% | $49M | 9 yrs | — |
| 427 | Avino Oxide Tailings Project Avino Silver & Gold Mines Ltd. (ASM.TO) | Silver (with Gold and Copper by-products) | Pre-Feasibility Feb 2024 | $61M | 26% | $49M | 9 yrs | — |
| 428 | Senegal Mali Shear Zone (SMSZ) Project Desert Gold Ventures Inc. (DAU.V) | Gold | PEA Jan 2026 | $61M | 57% | $20M | 10 yrs | 1,137 USD/oz |
| 429 | Mato Bula Deposit East Africa Metals Inc. (EAM.V) | Gold, Copper, Silver | PEA May 2016 | $57M | 28.4% | $54M | 8 yrs | — |
| 430 | El Bagre Gold Mining Complex (Cordero Mine) Soma Gold Corp. (SOMA.V) | Gold | PEA Jan 2023 | C$56M | — | — | 3.2 yrs | 1,418 C$/oz |
| 431 | Darling Range Bauxite Operations (Huntly & Willowdale) Alcoa Corporation (AA) | Bauxite | Feasibility Dec 2024 | $55M | — | — | 9 yrs | — |
| 432 | El Pilar Southern Copper Corporation (SCCO) | Copper | Feasibility Feb 2022 | $54M | 9.9% | $365M | 16 yrs | 1.8 USD/lb Cu |
| 433 | Sissingué Gold Project Perseus Mining Limited (PRU.TO) | Gold | Feasibility May 2015 | $53M | 27% | $106M | 5.3 yrs | 632 USD/oz |
| 434 | Alta Mesa Uranium Project enCore Energy Corp. (EU.V) | Uranium (U3O8) | Production Dec 2024 | $52M | — | $26M | — | 27.4 USD/lb |
| 435 | South Mountain Project Thunder Mountain Gold Inc. (THM.V) | Silver, Zinc, Gold, Copper | Feasibility Dec 2023 | $50M | 25% | $50M | 10 yrs | — |
| 436 | Foxtrot Project Search Minerals Inc. (SMY.V) | Rare Earth Elements (REE) | PEA Apr 2016 | C$48M | 17% | C$152M | 14 yrs | — |
| 437 | Wind Mountain Bravada Gold Corporation (BVA.V) | Gold/Silver | PEA Dec 2022 | $46M | 38% | $46M | — | 1,175 USD/oz |
| 438 | Tahuehueto Empress Royalty Corp. (EMPR.V) | Silver | Production Jul 2026 | $44M | — | $5M | — | — |
| 439 | Lone Mountain Minaurum Silver Inc. (MGG.V) | Zinc - Lead - Silver - Gold CRD | PEA Jun 2019 | $43M | 35% | — | — | — |
| 440 | Auld Creek (Reefton Goldfield) Rua Gold Inc. (RUA.V) | Gold, Antimony | PEA Jun 2026 | $42M | 17% | $133M | 5.5 yrs | 1,835 USD/oz |
| 441 | Auld Creek Gold-Antimony Project Rua Gold Inc. (RUA.V) | Gold, Antimony | PEA Jun 2026 | $42M | 17% | $226M | — | 1,835 USD/oz |
| 442 | Tambomayo Compania de Minas Buenaventura S.A.A. (BVN) | Gold & Silver | Pre-Feasibility May 2022 | $41M | — | $17M | 3 yrs | — |
| 443 | PL Gold Mine Minnova Corp. (MCI.V) | Gold | Feasibility Nov 2017 | C$37M | 53% | C$35M | 5 yrs | 942 USD/oz |
| 444 | PL Gold Mine (PL Mine) Minnova Corp. (MCI.V) | Gold | Feasibility 2017 | $37M | 53% | — | 5 yrs | — |
| 445 | San Agustin Mine⚑ Heliostar Metals Ltd. (HSTR.V) | Gold | Production 2026 | $35M | 548% | $40M | 1.2 yrs | 2,150 USD/oz Au |
| 446 | Uchucchacua Compania de Minas Buenaventura S.A.A. (BVN) | Silver | Feasibility May 2022 | $35M | — | — | 5 yrs | — |
| 447 | Kinsley Mountain Gold Project CopAur Minerals Inc. (CPAU.V) | Gold | PEA Jul 2026 | $35M | 19.7% | $82M | 4 yrs | 1,861 USD/oz |
| 448 | Igor Project (Callanquitas Mine) PPX Mining Corp. (PPX.V) | Gold-Silver | Pre-Feasibility Jan 2022 | $30M | 59% | $7M | — | — |
| 449 | Sierra Antapite Empress Royalty Corp. (EMPR.V) | Gold | Production Jul 2026 | $28M | — | $10M | — | — |
| 450 | Montauban Gold-Silver Project ESGold Corp. (ESAU.CN) | Gold-Silver | PEA May 2025 | C$24M | 60.3% | C$19M | 4 yrs | — |
| 451 | SMSZ Project Desert Gold Ventures Inc. (DAU.V) | Gold | PEA Aug 2025 | $24M | 34% | $4M | — | 1,352 USD/oz |
| 452 | Eagle Mine Talon Metals Corp. (TLO.TO) | Nickel, Copper | Production Jun 2026 | $19M | — | — | — | 8.1 USD/lb |
| 453 | Galaxy Empress Royalty Corp. (EMPR.V) | Gold | Production Jul 2026 | $15M | — | $5M | — | — |
| 454 | Terakimti Oxide Deposit, Harvest Project East Africa Metals Inc. (EAM.V) | Gold | PEA Oct 2015 | $13M | 30.1% | $17M | 4 yrs | — |
| 455 | Da Tambuk East Africa Metals Inc. (EAM.V) | Gold | PEA Apr 2018 | $13M | 28.6% | $34M | — | — |
| 456 | San Agustin Mine (PEA case from Technical Report Highlights) Heliostar Metals Ltd. (HSTR.V) | Gold | Feasibility Nov 2024 | $12M | 156% | $40M | — | 1,990 USD/GEO |
| 457 | Jansen Potash Project BHP Group (BHP) | Potash | Pre-Feasibility Jun 2026 | $11M | 18.3% | $9.00B | — | 90 USD/t KCl |
| 458 | Manica Empress Royalty Corp. (EMPR.V) | Gold | Production Jul 2026 | $7M | — | $3M | — | — |
| 459 | East Kemptville Tin Project Avalon Advanced Materials Inc. (AVL.TO) | Tin | PEA Jun 2018 | C$6M | 10.6% | C$32M | 19 yrs | — |
| 460 | Coimolache Mine Compania de Minas Buenaventura S.A.A. (BVN) | Gold, Silver | Feasibility Feb 2024 | $5M | — | — | 5 yrs | — |
| 461 | Crawford Canada Nickel Company Inc. (CNC.V) | Nickel | Feasibility 2025 | $3M | 17.6% | $2.00B | 41 yrs | 1.5 USD/lb |
| 462 | Gowganda (Kilborn 1987 Feasibility Study) Nord Precious Metals Mining Inc. (NTH.V) | Silver | Feasibility 1987 | C$2M | 49.3% | C$5M | 7 yrs | — |
| 463 | Gowganda Tailings (Kilborn FS) Nord Precious Metals Mining Inc. (NTH.V) | Silver | Feasibility 1987 | C$2M | 49.3% | C$5M | 7 yrs | — |
| 464 | Kay Mine Arizona Metals Corp. (AMC.TO) | Copper-Gold-Zinc | PEA Apr 2026 | $-6M | 4.9% | $609M | 10 yrs | 138.5 USD/t milled |
| 465 | Orcopampa Compania de Minas Buenaventura S.A.A. (BVN) | Gold | Feasibility May 2022 | $-30M | — | — | 3 yrs | 1,242 USD/oz Au |
| 466 | Grasberg minerals district Freeport-McMoRan (FCX) | Copper | Feasibility Dec 2022 | — | — | $14.50B | — | — |
| 467 | HyProMag GmbH Mkango Resources Ltd. (MKA.V) | NdFeB magnets / Rare earth magnet recycling | — | — | — | €6M | — | — |
| 468 | Impala Refineries New Final Metals Facility Impala Platinum Holdings (IMPUY) | PGM (6E) | — Mar 2026 | — | — | ZAR 899M | — | — |
| 469 | Zimplats Smelter & SO2 Abatement Impala Platinum Holdings (IMPUY) | PGM (6E) | — Mar 2026 | — | — | $544M | — | — |
| 470 | Golden Chest Mine Idaho Strategic Resources, Inc. (IDR) | Gold | Feasibility Dec 2025 | — | — | $31M | 6 yrs | — |
| 471 | Consolidated (Mineros S.A.) Mineros S.A. (MSA.TO) | Gold | Production 2026 | — | — | $114M | — | 2,420 USD/oz Au |
| 472 | Mabilo Stage 2 RTG Mining Inc. (RTG.TO) | Copper, Gold, Iron | Feasibility 2016 | — | — | $164M | — | — |
| 473 | Mabilo Stage 1 DSO RTG Mining Inc. (RTG.TO) | Copper, Gold | Feasibility 2024 | — | — | $25M | — | — |
| 474 | Placentia Bay Oil Refinery (NLRC) Altius Minerals Corporation (ALS.TO) | Oil Refinery (refined petroleum products) | Feasibility Dec 2006 | — | 15% | $4.60B | — | — |
| 475 | Fenix Project - Phase 1 (Gold) McEwen Mining Inc. (MUX.TO) | Gold | Feasibility Feb 2021 | — | — | $42M | 6 yrs | 1,045 USD/oz Au |
| 476 | Mantoverde Optimized (MV-O) Capstone Copper Corp. (CS.TO) | Copper | Feasibility Oct 2024 | — | — | $176M | — | — |
| 477 | Jorf Lasfar CSPG Anode Plant (Morocco) Falcon Energy Materials Inc. (FLCN.V) | CSPG (Coated Spheronized Purified Graphite) | PEA Oct 2025 | — | — | $86M | — | 3,168 USD/t CSPG |
| 478 | Gold Mountain Mining (Elk Gold) Silver Crown Royalties Inc. (SCRI.V) | Silver (byproduct) | — | — | 15% | C$3M | — | — |
| 479 | Pilar Gold (PGDM) Silver Crown Royalties Inc. (SCRI.V) | Silver (byproduct of gold) | — | — | 19% | $2M | — | — |
| 480 | Miller Copper-Gold Property (Cam Copper Mine - Zone 2 Surgical Mining) Northstar Gold Corp. (NSG.CN) | Copper | PEA Jul 2025 | — | — | $2M | 2.6 yrs | — |
| 481 | Cauchari-Olaroz Lithium Argentina Corp. (LAR.TO) | Lithium | Feasibility Jan 2026 | — | — | $979M | 35 yrs | — |
| 482 | Mon Gold Mine Sixty North Gold Mining Ltd. (SXTY.CN) | Gold | — Feb 2025 | — | — | C$4M | — | — |
| 483 | Kindersley Lithium Project – Phase 1 Grounded Lithium Corp. (GRD.V) | Lithium | PEA Jun 2023 | — | — | C$447M | 20 yrs | 5,199 CAD/tonne LHM |
| 484 | Bunker Hill 2.0 Expansion Project Bunker Hill Mining Corp. (BNKR.V) | Zinc (with Silver and Lead) | PEA | — | — | $60M | 13 yrs | 0.6 USD/lb Zn Payable |
| 485 | Magnolia Field Bromine Reserves Albemarle Corporation (ALB) | Bromine | Reserve Estimate Dec 2023 | — | — | $1.00B | — | — |
| 486 | Joel Mine Harmony Gold Mining Company (HMY) | Gold | Resource Estimate Jun 2022 | — | — | ZAR 726M | 8 yrs | — |
| 487 | Keliber Lithium Refinery (Kokkola) Sibanye Stillwater Limited (SBSW) | Lithium | Pre-Feasibility Apr 2023 | — | — | €276M | — | — |
| 488 | Valentine Orla Mining Ltd. (OLA.TO) | Gold | Feasibility | — | — | $414M | 11 yrs | — |
| 489 | TITI Silver Crown Royalties Inc. (SCRI.V) | Silver | Production | — | 21% | $8M | — | — |
| 490 | Elk Gold (Gold Mountain Mining) Silver Crown Royalties Inc. (SCRI.V) | Silver | Production May 2023 | — | — | C$3M | — | — |
| 491 | BAC (BacTech Environmental) Silver Crown Royalties Inc. (SCRI.V) | Silver | Production Nov 2024 | — | — | C$1M | — | — |
| 492 | Stibnite Gold Project (Perpetua Resources) - regional context Legacy Gold Mines Inc. (LEGY.V) | Gold | Production | — | — | $2.60B | 15 yrs | — |
| 493 | AurMac Project (exploration program) Orogen Royalties Inc. (OGN.V) | Gold | Resource Estimate May 2026 | — | — | $15M | — | — |
| 494 | Springer (Springer Mill & Tungsten Mine) Blue Moon Metals Inc. (MOON.V) | Tungsten | PEA Dec 2013 | — | — | $50M | — | — |
| 495 | Ravenswood Gold Mine Triple Flag Precious Metals Corp. (TFPM.TO) | Gold | Production | — | — | $440M | — | — |
| 496 | Katanning Gold Project OceanaGold Corporation (OGC.TO) | Gold | Feasibility Dec 2025 | — | — | $251M | 10 yrs | — |
| 497 | Limousine Butte Commercial Mining Operation (Scenario B / Project Golden Bullet) NevGold Corp. (NAU.V) | Antimony & Gold | Resource Estimate Jul 2026 | — | — | $250M | — | — |
| 498 | Limousine Butte (Limo Butte) NevGold Corp. (NAU.V) | Antimony & Gold | Resource Estimate Jul 2026 | — | — | $50M | — | — |
| 499 | NevGold Corp. (NAU.V) | Antimony & Gold | Resource Estimate Jul 2026 | — | — | $50M | — | — |
| 500 | Carlin Complex Iconic Minerals Ltd. (ICM.V) | Gold | Resource Estimate Mar 2025 | — | — | $2.43B | 20 yrs | — |
| 501 | Electra Cobalt Sulfate Refinery (Temiskaming, Ontario) Electra Battery Materials Corporation (ELBM.V) | Cobalt (cobalt sulfate) | Production Aug 2026 | — | — | $73M | — | — |
| 502 | Chamé target Jaguar Mining Inc. (JAG.TO) | Gold | — | — | — | $43M | — | — |
| 503 | South Carlin Complex (South Railroad) Equinox Gold Corp. (EQX.TO) | Gold | Feasibility Feb 2026 | — | — | $395M | — | — |
| 504 | Sugar Zone Vox Royalty Corp. (VOXR.TO) | Gold | Resource Estimate | — | — | $55M | — | — |
| 505 | Reliquias Mine Silver Mountain Resources Inc. (AGMR.V) | Silver | PEA Oct 2024 | — | — | C$4M | — | — |
| 506 | Khoemacau Royal Gold, Inc. (RGLD) | Silver | — | — | — | $900M | — | — |
| 507 | Springer Tungsten Blue Moon Metals Inc. (MOON.V) | Tungsten | PEA Dec 2013 | — | — | $50M | — | 350 USD/MTU |
| 508 | Blackwater Mine - EP2 Expansion Artemis Gold Inc. (ARTG.V) | Gold | — Dec 2025 | — | — | C$1.44B | — | — |
| 509 | Blackwater Mine - Phase 1A Expansion Artemis Gold Inc. (ARTG.V) | Gold | — 2026 | — | — | C$110M | — | — |
| 510 | Goulamina (Mali) - Reference/Comparable Lithium Africa Inc. (LAF.V) | Lithium | Production 2024 | — | 98% | $310M | — | 312 USD/t SC |
| 511 | La Negra Mine Silverco Mining Inc. (SICO.V) | Silver | — | — | — | $18M | — | — |
| 512 | Johnson Camp Mine Gunnison Copper Corp. (GCU.TO) | Copper | — | — | — | $143M | — | — |
| 513 | Springer Blue Moon Metals Inc. (MOON.V) | Tungsten | — | — | — | $50M | — | — |
| 514 | Bayan Khundii Erdene Resource Development Corp. (ERD.TO) | Gold | Feasibility 2023 | — | — | $115M | 6 yrs | — |
| 515 | Placentia Bay Oil Refinery Altius Minerals Corporation (ALS.TO) | Oil / Refined Petroleum Products | Feasibility Dec 2006 | — | 15% | $4.60B | — | — |
| 516 | Santo Domingo Capstone Copper Corp. (CS.TO) | Copper | Feasibility Jul 2024 | — | 24% | — | — | — |
| 517 | Mantoverde Capstone Copper Corp. (CS.TO) | Copper | Production Jul 2024 | — | — | $176M | — | — |
| 518 | Florália High Purity Iron Max Resource Corp. (MAX.V) | Iron | — | — | — | $10M | — | — |
| 519 | Kemess Centerra Gold Inc. (CG.TO) | Gold, Copper | PEA Jul 2026 | — | — | $771M | 15 yrs | 971 USD/oz |
| 520 | Songwe Hill Rare Earths Project Mkango Resources Ltd. (MKA.V) | Rare Earth Elements | Feasibility Apr 2026 | — | — | $5M | — | — |
| 521 | HyProMag GmbH (Germany) Mkango Resources Ltd. (MKA.V) | Rare Earth Magnets (Recycling) | — | — | — | €6M | — | — |
| 522 | Rare Element Resources Demonstration Plant (Wyoming) Rare Element Resources Ltd. (REEMF) | NdPr Oxide, Heavy REE (HREE) concentrate | — | — | — | $66M | — | — |
| 523 | Imeq (Hydro Project) Amaroq Minerals Ltd. (AMRQ.V) | Energy | Pre-Feasibility 2025 | — | — | C$10M | — | — |
| 524 | Mupani Mine Impala Platinum Holdings (IMPUY) | PGM (6E) | — Mar 2026 | — | — | $386M | — | — |
| 525 | 11C Shaft Impala Platinum Holdings (IMPUY) | PGM (6E) | — Mar 2026 | — | — | ZAR 221M | — | — |
| 526 | Highland Valley Copper (HVC) Mine Life Extension Teck Resources Limited (TECK) | Copper | — | — | — | C$2.10B | — | — |
| 527 | Vicuña District (Josemaria & Filo del Sol) Lundin Mining Corporation (LUN.TO) | Copper | PEA Feb 2026 | — | 14.8% | $7.10B | 70 yrs | 0.5 USD/lb Cu |
| 528 | Impala Refineries Final Metals Facility Impala Platinum Holdings (IMPUY) | PGM | — | — | — | ZAR 899M | — | — |
| 529 | Zimplats Solar Plant Impala Platinum Holdings (IMPUY) | PGM (6E) | — Mar 2026 | — | — | $91M | — | — |
| 530 | Zimplats Smelter Impala Platinum Holdings (IMPUY) | PGM | — | — | — | $544M | — | — |
| 531 | Oyu Tolgoi Rio Tinto (RIO) | Copper (with Gold and Silver | Feasibility Dec 2022 | — | — | $7.36B | — | — |
| 532 | Senegal Pilot Plant Dynacor Group Inc. (DNG.TO) | Gold | — | — | — | $25M | — | — |
| 533 | Eskay Creek Skeena Gold & Silver Ltd. (SKE.TO) | Gold & Silver | Feasibility Nov 2023 | — | — | $659M | — | 687 US$/oz AuEq |
| 534 | Cerro de Oro Project Minera Alamos Inc. (MAI.V) | Gold | PEA Jan 2023 | — | 111% | $28M | 8.2 yrs | 873 USD/oz |
| 535 | San Antonio Project Heliostar Metals Ltd. (HSTR.V) | Gold | PEA Nov 2024 | — | — | $131M | 14 yrs | 1,063 $/oz |
| 536 | Bomboré (Existing Phase I) Orezone Gold Corporation (ORE.TO) | Gold | Production Nov 2023 | — | — | $169M | — | — |
| 537 | Livengood Gold Project International Tower Hill Mines Ltd. (ITH.TO) | Gold | Pre-Feasibility 2023 | — | — | $1.93B | 21 yrs | 1,171 USD/oz |
| 538 | Tonopah Gold Project Viva Gold Corp. (VAU.V) | Gold | PEA Aug 2025 | — | 17.6% | $220M | 7 yrs | 1,269 USD/oz |
| 539 | Vila Nova Tailings Operation JZR Gold Inc. (JZR.V) | Gold | PEA | — | — | $7M | — | — |
| 540 | Isabella Pearl Mine Fortitude Gold Corp. (FTCO) | Gold | Resource Estimate Dec 2022 | — | — | $1M | — | 1,697 USD/oz |
| 541 | Imwelo Development Project Lake Victoria Gold Ltd. (LVG.V) | Gold | Pre-Feasibility | — | — | $15M | — | 1,500 USD/oz |
| 542 | PPX Mining Igor 4 Silver Crown Royalties Inc. (SCRI.V) | Silver (byproduct of gold/silver polymetallic) | — | — | 50% | $3M | — | — |
| 543 | BacTech Environmental Ecuador Plant Silver Crown Royalties Inc. (SCRI.V) | Silver (reprocessing tailings) | — | — | 21% | C$1M | — | — |
| 544 | EDM Resources Scotia Mine Silver Crown Royalties Inc. (SCRI.V) | Silver | — | — | 25% | C$1M | — | — |
| 545 | Morocco CSPG Anode Plant (Jorf Lasfar) Falcon Energy Materials Inc. (FLCN.V) | CSPG (Coated Spheronized Purified Graphite) | PEA Oct 2025 | — | — | $86M | — | 3,168 USD/t |
| 546 | France BAM Plant Northern Graphite Corporation (NGC.V) | Graphite (Battery Anode Material) | — | — | — | €159M | — | — |
| 547 | Yanbu BAM Plant (KSA JV) Northern Graphite Corporation (NGC.V) | Graphite (Battery Anode Material) | — | — | — | $200M | — | — |
| 548 | Bissett Creek Northern Graphite Corporation (NGC.V) | Graphite | Feasibility | — | — | $115M | — | — |
| 549 | Okanjande Northern Graphite Corporation (NGC.V) | Graphite | — May 2026 | — | — | $35M | — | — |
| 550 | Tulkubash Silvercorp Metals Inc. (SVM.TO) | Gold | Feasibility Jul 2026 | — | — | $166M | 3.5 yrs | — |
| 551 | Turnagain Ni-Co Project Giga Metals Corp. (GIGA.V) | Nickel/Cobalt | Pre-Feasibility Oct 2023 | — | — | $2.00B | 30 yrs | — |
| 552 | Turnagain Giga Metals Corp. (GIGA.V) | Nickel, Cobalt | Pre-Feasibility Oct 2023 | — | — | $2.00B | 30 yrs | — |
| 553 | Edikan Gold Mine (Esuajah South) Perseus Mining Limited (PRU.TO) | Gold | Feasibility Jan 2021 | — | — | $38M | — | — |
| 554 | Greenstone Mine Equinox Gold Corp. (EQX.TO) | Gold | Feasibility Mar 2026 | — | — | $80M | 14 yrs | — |
| 555 | Northparkes Triple Flag Precious Metals Corp. (TFPM.TO) | Gold | Production Mar 2022 | — | — | $84M | — | — |
| 556 | Oko West G Mining Ventures Corp. (GMIN.TO) | Gold | Feasibility Apr 2025 | — | — | $973M | 10 yrs | — |
| 557 | Paca Apuradita Silver Elephant Mining Corp. (ELEF.TO) | Silver | — | — | — | $0M | — | — |
| 558 | Electra Cobalt Sulfate Refinery Electra Battery Materials Corporation (ELBM.V) | Cobalt (as cobalt sulfate) | Feasibility Jul 2026 | — | — | $73M | — | — |
NPV and capital costs are in millions of the study's stated currency; IRR and NPV are after-tax base-case figures where disclosed (pre-tax used as a fallback). Figures are automatically extracted from company filings and presentations and reflect the most recent disclosure found — they may contain errors. Always verify against the original source document before making any investment decision.