Mining Project Economics Database
Headline economics for 548 mining projects across 276 companies, pulled straight from NI 43-101, JORC and S-K 1300 technical reports and corporate disclosures. Ranked by after-tax NPV and linked to each company. Sort any column, or browse by commodity.
Find the best mining projects. Be the first to know about new mining results, and how they compare to other projects.
| # | Project / Company | Study | ||||||
|---|---|---|---|---|---|---|---|---|
| 1 | Serra Sul Complex (S11CD) Vale S.A. (VALE) | Iron ore | Feasibility Dec 2023 | $44.51B | — | — | — | — |
| 2 | Serra Norte Vale S.A. (VALE) | Iron Ore | Feasibility Dec 2021 | $26.21B | — | — | — | — |
| 3 | Serra Norte Complex Vale S.A. (VALE) | Iron Ore | Resource Estimate Dec 2025 | $19.55B | — | $8.06B | — | 44.2 US$/ton of product |
| 4 | TOML and NORI Properties, Clarion-Clipperton Zone The Metals Company Inc. (TMC) | Nickel | PEA Aug 2025 | $18.08B | 35.6% | $8.85B | 23 yrs | — |
| 5 | Salobo Operations Vale S.A. (VALE) | Copper / Gold | Resource Estimate Dec 2025 | $16.61B | — | $3.92B | — | — |
| 6 | Waterberg Project Platinum Group Metals Ltd. (PTM.TO) | Platinum Group Metals (PGM) - Pt, Pd, Rh, Au | Feasibility Aug 2024 | ZAR 11.56B | 14.2% | ZAR 18.86B | 52 yrs | — |
| 7 | Hycroft Mine (PEA base case - additional metrics) Hycroft Mining Holding Corporation (HYMC) | Gold & Silver | PEA May 2026 | $10.00B | 30.1% | — | — | — |
| 8 | Nevada North Lithium Project (NNLP) Surge Battery Metals Inc. (NILI.V) | Lithium | Pre-Feasibility 2026 | $9.81B | 23.6% | $2.77B | 42 yrs | — |
| 9 | Surge Battery Metals NNLP Lithium Project (adjacent comparable) Peloton Minerals Corp. (PMC.CN) | Lithium | Pre-Feasibility Oct 2026 | $9.81B | 23.6% | $2.77B | 42 yrs | 4,719 USD/t LCE |
| 10 | Vicuña District Lundin Mining Corporation (LUN.TO) | Copper, Gold, Silver | PEA Feb 2026 | $9.50B | 14.8% | $7.10B | 70 yrs | 0.5 USD/lb |
| 11 | KSM Project Seabridge Gold Inc. (SEA.TO) | Gold | Pre-Feasibility 2022 | $7.90B | 16.1% | $6.40B | 33 yrs | 601 USD/oz Au (all-in total costs, net of by-products) |
| 12 | Hat Project Doubleview Gold Corp. (DBG.V) | Copper | PEA Apr 2026 | C$6.73B | 23% | C$3.60B | 25 yrs | — |
| 13 | Thacker Pass (Lithium Americas) — comparable Peloton Minerals Corp. (PMC.CN) | Lithium | Feasibility Dec 2024 | $5.90B | 19.8% | $2.93B | 85 yrs | 6,238 USD/t LCE |
| 14 | Jansen Potash Project (Stage 1) BHP Group (BHP) | Potash | Pre-Feasibility Jun 2022 | $5.50B | 15.2% | — | — | — |
| 15 | Jansen BHP Group (BHP) | Potash | Feasibility Jun 2022 | $5.50B | 15.2% | — | — | 61 USD/tonne KCl |
| 16 | Oko West G2 Goldfields Inc. (GTWO.TO) | Gold | Feasibility Apr 2025 | $5.18B | — | $972M | 12 yrs | 1,123 USD/oz |
| 17 | Donlin Gold Project NOVAGOLD Resources Inc. (NG.TO) | Gold | Pre-Feasibility Nov 2025 | $5.06B | 10.3% | $9.23B | 27 yrs | — |
| 18 | Graphite Creek Project Graphite One Inc. (GPH.V) | Graphite | Feasibility Mar 2025 | $5.03B | 26.8% | $4.87B | — | — |
| 19 | Graphite Creek Mine & Secondary Treatment Plant Graphite One Inc. (GPH.V) | Graphite | Feasibility | $5.00B | 27% | $5.00B | 20 yrs | — |
| 20 | Franklin Project Standard Lithium Ltd. (SLI.V) | Lithium (Lithium Carbonate) | PEA Sep 2026 | $5.00B | 24% | — | 20 yrs | 4,226 USD/t |
| 21 | Warintza Solaris Resources Inc. (SLS.TO) | Copper | Pre-Feasibility Nov 2025 | $4.60B | 26% | $3.68B | 22 yrs | 1.1 USD/lb |
| 22 | Berg Copper Project Surge Copper Corp. (SURG.V) | Copper | Pre-Feasibility Jun 2026 | C$4.59B | 23.8% | C$4.68B | 27.7 yrs | — |
| 23 | Simfer Iron Ore Project (Simandou South, Blocks 3 & 4) Rio Tinto (RIO) | Iron Ore | Feasibility Dec 2023 | $4.40B | — | $4.60B | — | — |
| 24 | Hycroft Property Hycroft Mining Holding Corporation (HYMC) | Gold, Silver | PEA Mar 2023 | $4.30B | 16.9% | $2.40B | 51 yrs | — |
| 25 | Kingking St Augustine Gold & Copper Ltd. (SAU.TO) | Copper-Gold | Pre-Feasibility Jul 2025 | $4.18B | 34.2% | $2.37B | 38 yrs | — |
| 26 | Oko-Ghanie G2 Goldfields Inc. (GTWO.TO) | Gold | PEA | $4.14B | — | $664M | 14 yrs | 1,191 USD/oz |
| 27 | Lake Superior Lithium Project Avalon Advanced Materials Inc. (AVL.TO) | Lithium | PEA Sep 2024 | C$4.12B | 47.5% | C$1.21B | 30 yrs | 13,029 CAD/t LHM |
| 28 | Lake Superior Lithium Project (LSLi) Avalon Advanced Materials Inc. (AVL.TO) | Lithium Hydroxide | PEA Sep 2024 | C$4.10B | 48% | C$1.30B | 30 yrs | — |
| 29 | Casino Project Western Copper and Gold Corporation (WRN.TO) | Copper, Gold, Molybdenum, Silver | Feasibility Aug 2022 | C$4.06B | 18.1% | — | — | — |
| 30 | Angel Island (formerly Clayton Valley Lithium Project) Century Lithium Corp. (LCE.V) | Lithium | Feasibility Feb 2026 | $4.01B | 27.4% | $997M | 60 yrs | 4,389 USD/t Li2CO3 |
| 31 | Clayton Valley Lithium Project Century Lithium Corp. (LCE.V) | Lithium | Feasibility Jan 2026 | $4.01B | 27.4% | — | 40 yrs | — |
| 32 | Omai Gold Project (Wenot Open Pit & Gilt Underground) Omai Gold Mines Corp. (OMG.V) | Gold | PEA Aug 2026 | $4.00B | 24% | $1.43B | 18 yrs | 1,608 USD/oz |
| 33 | Clearwater Project E3 Lithium Ltd. (ETL.V) | Lithium | Pre-Feasibility Jun 2024 | $3.72B | 24.6% | $2.46B | 50 yrs | 6,200 USD/tonne LHM |
| 34 | Buenavista del Cobre (BVC) Southern Copper Corporation (SCCO) | Copper | Pre-Feasibility Dec 2021 | $3.70B | — | $5.30B | 30 yrs | — |
| 35 | Boumadine Polymetallic Project Aya Gold & Silver Inc. (AYA.TO) | Gold | PEA Sep 2026 | $3.50B | 93% | $463M | 14 yrs | 1,300 USD/oz AuEq (LOM; $1,105/oz Y1-Y5) |
| 36 | Valley Snowline Gold Corp. (SGD.TO) | Gold | PEA Aug 2025 | C$3.37B | 25% | C$1.69B | 20 yrs | 844 USD/oz |
| 37 | Rogue Project Snowline Gold Corp. (SGD.TO) | Gold | PEA Aug 2025 | C$3.37B | 25% | C$1.69B | 20 yrs | 844 USD/oz |
| 38 | Horne 5 Gold Project Falco Resources Ltd. (FPC.V) | Gold | Feasibility Jul 2026 | C$3.35B | 28.2% | C$1.75B | — | 782 USD/oz |
| 39 | Troilus Gold - Copper Project Troilus Mining Corp. (TLG.TO) | Gold | Feasibility Sep 2026 | $3.21B | 22% | $1.43B | 26 yrs | 1,340 USD/oz |
| 40 | Valentine Gold Mine Equinox Gold Corp. (EQX.TO) | Gold | Feasibility Mar 2026 | $3.11B | — | $507M | — | — |
| 41 | Valentine Gold Mine (Phase 1 + Phase 2) Orla Mining Ltd. (OLA.TO) | Gold | Pre-Feasibility Mar 2026 | $3.10B | — | $436M | 12 yrs | 1,665 USD/oz |
| 42 | Kami (Rose Central) Iron Ore Altius Minerals Corporation (ALS.TO) | Iron Ore | PEA Sep 2011 | $3.07B | 40.2% | $989M | 15.3 yrs | — |
| 43 | Diablillos AbraSilver Resource Corp. (ABRA.TO) | Silver | Feasibility Jun 2026 | $3.00B | 41.9% | $722M | 25 yrs | 20 USD/oz AgEq |
| 44 | Green Bay Copper-Gold Project - Ming Deposit (4.6Mtpa Upscaled Case) FireFly Metals Ltd. (FFM.TO) | Copper | PEA Aug 2026 | A$3.00B | 39% | — | 22 yrs | — |
| 45 | Los Azules Copper Project McEwen Mining Inc. (MUX.TO) | Copper | Feasibility Sep 2025 | $2.94B | 19.8% | $3.17B | 21 yrs | 2.1 USD/lb Cu |
| 46 | Shaakichiuwaanaan (Corvette) PMET Resources Inc. (PMET.TO) | Lithium | PEA Aug 2024 | C$2.90B | 34% | C$640M | 24 yrs | 593 USD/t |
| 47 | White Gold Project (Spot Case) White Gold Corp. (WGO.V) | Gold | PEA Aug 2026 | C$2.90B | 56% | C$1.00B | — | — |
| 48 | Viken District Metals Corp. (DMX.V) | Uranium, Vanadium | PEA Jun 2026 | $2.88B | 45.9% | $876M | 14 yrs | -118 USD/lb U3O8 |
| 49 | Arizaro Project Lithium Chile Inc. (LITH.V) | Lithium | Pre-Feasibility Jul 2024 | $2.83B | 36.3% | $1.05B | 20 yrs | 7,165 USD/t LCE |
| 50 | Crawford Nickel Sulphide Project Canada Nickel Company Inc. (CNC.V) | Nickel | Feasibility 2025 | $2.80B | 17.6% | $2.00B | 41 yrs | 1.5 USD/lb |
| 51 | Converse Project Roxmore Resources Ltd. (RM.TO) | Gold | PEA May 2026 | $2.75B | 42.8% | $829M | 14.5 yrs | 1,769 USD/oz Au |
| 52 | Aurora Cu-Mo-Ag Project DLP Resources Inc. (DLP.V) | Copper | PEA Oct 2026 | $2.70B | 18.5% | — | 19 yrs | — |
| 53 | Soto Norte Project Aris Mining Corporation (ARIS.TO) | Gold | Pre-Feasibility Sep 2025 | $2.68B | 35.4% | $625M | 22 yrs | 534 USD/oz |
| 54 | Tanbreez (Alternative PEA metrics - different discount) Critical Metals Corp. (CRML) | Rare Earth Elements | PEA Mar 2025 | $2.68B | 180% | $300M | — | — |
| 55 | Los Azules Copper Project – NI 43-101 Including Inferred (175 ktpa Cu) McEwen Mining Inc. (MUX.TO) | Copper | PEA May 2023 | $2.66B | 21.2% | $2.46B | 27 yrs | 1.6 USD/lb Cu |
| 56 | Carangas New Pacific Metals Corp. (NUAG.TO) | Silver | PEA Jul 2026 | $2.65B | 35.9% | $645M | 19 yrs | 18.3 USD/oz AgEq |
| 57 | La Colorada Skarn Pan American Silver Corp. (PAAS) | Silver | Production Mar 2026 | $2.60B | 17% | $1.90B | 37 yrs | -22.7 USD/oz |
| 58 | La Colorada Skarn Project (Expanded La Colorada Mine) Pan American Silver Corp. (PAAS) | Silver | PEA Mar 2026 | $2.60B | 17% | $1.90B | 37 yrs | -22.7 USD/oz payable silver |
| 59 | Magnolia Field Bromine Albemarle Corporation (ALB) | Bromine | Production Feb 2026 | $2.56B | — | — | — | — |
| 60 | Oko Gold Project G2 Goldfields Inc. (GTWO.TO) | Gold | PEA Dec 2025 | $2.56B | 39% | $664M | 14 yrs | 1,191 USD/oz |
| 61 | Copper World (Extension Case) Hudbay Minerals Inc. (HBM.TO) | Copper | Pre-Feasibility Oct 2026 | $2.51B | 18.8% | $2.07B | 37 yrs | 2.4 USD/lb Cu (LOM sustaining cash cost); LOM cash cost $1.94/lb |
| 62 | Tower Gold Project STLLR Gold Inc. (STLR.TO) | Gold | PEA Jun 2025 | C$2.50B | 24% | C$1.87B | 19 yrs | 1,537 USD/oz |
| 63 | Lawyers-Ranch Thesis Gold Inc. (TAU.V) | Gold | Pre-Feasibility Dec 2025 | C$2.37B | 54.4% | C$736M | 15 yrs | 1,185 USD/oz AuEq |
| 64 | Elk Creek Project NioCorp Developments Ltd. (NB) | Niobium, Scandium, Titanium | Feasibility 2022 | $2.35B | 27.6% | $1.14B | 38 yrs | — |
| 65 | Red Rock Converter Rock Tech Lithium Inc. (RCK.V) | Lithium | — Aug 2026 | C$2.30B | 22% | C$1.30B | — | 6,111 CAD/t LHM |
| 66 | Boardwalk LithiumBank Resources Corp. (LBNK.V) | Lithium | PEA Feb 2025 | $2.30B | — | — | 20 yrs | 4,588 USD/t |
| 67 | Spanish Mountain Gold Project - Spot Case (US$3,300/oz gold) Spanish Mountain Gold Ltd. (SPA.V) | Gold | PEA Jul 2025 | C$2.30B | 32% | — | 24.5 yrs | — |
| 68 | Los Azules Copper Project (Phase 1 Base Case 175 ktpa Cu) McEwen Mining Inc. (MUX.TO) | Copper | PEA May 2023 | $2.23B | 21.5% | $2.45B | 17 yrs | 1.5 USD/lb Cu |
| 69 | Pebble Project Northern Dynasty Minerals Ltd. (NDM.TO) | Copper | PEA 2023 | $2.23B | 16.2% | $3.12B | 20 yrs | — |
| 70 | Čoka Rakita (at $3,500/oz Au sensitivity) DPM Metals Corp. (DPM.TO) | Gold | Feasibility Jan 2026 | $2.21B | 67.8% | $448M | 10 yrs | — |
| 71 | Coffee Gold Project Fuerte Metals Corp. (FMT.V) | Gold | PEA Mar 2026 | $2.20B | 43.5% | $998M | 13 yrs | 1,386 USD/oz |
| 72 | Green Bay Copper-Gold Project - Ming Deposit (1.8Mtpa Case) FireFly Metals Ltd. (FFM.TO) | Copper | PEA Aug 2026 | A$2.20B | 41% | A$514M | 32 yrs | — |
| 73 | Uatnan Mining Project (Lac Guéret graphite deposit) Nouveau Monde Graphite Inc. (NOU.TO) | Graphite (natural flake, Cg) | PEA Jan 2023 | C$2.17B | 25.9% | C$1.42B | 24 yrs | — |
| 74 | Spanish Mountain Gold Project Spanish Mountain Gold Ltd. (SPA.V) | Gold | PEA Sep 2026 | $2.16B | 35.2% | $1.05B | 25.8 yrs | 1,450 USD/oz Au |
| 75 | Green Bay Ming Mine Copper-Gold Project FireFly Metals Ltd. (FFM.TO) | Copper | PEA Sep 2026 | C$2.13B | 41% | C$560M | 33 yrs | — |
| 76 | Springpole Gold Project First Mining Gold Corp. (FF.TO) | Gold | Pre-Feasibility Dec 2025 | $2.10B | 40.8% | $1.10B | 9.4 yrs | 938 USD/oz |
| 77 | Tanbreez Critical Metals Corp. (CRML) | Rare Earth Elements (REE), Zirconium (Zr), Niobium (Nb), Tantalum (Ta), Hafnium (Hf), Gallium (Ga) | PEA Mar 2025 | $2.07B | 180% | $300M | 25 yrs | — |
| 78 | Baptiste Nickel Project FPX Nickel Corp. (FPX.V) | Nickel | Pre-Feasibility Sep 2023 | $2.01B | 18.6% | $2.18B | 29 yrs | 4.2 USD/lb Ni |
| 79 | Altar Project Aldebaran Resources Inc. (ALDE.V) | Copper | PEA Sep 2025 | $2.01B | 20.5% | $1.59B | — | 2.6 USD/lb Cu |
| 80 | Çöpler Project (Initial Assessment MII Case) SSR Mining Inc. (SSRM) | Gold | PEA Sep 2022 | $2.00B | — | $218M | 22 yrs | 924 USD/oz gold |
| 81 | Yellowhead Project Taseko Mines Limited (TGB) | Copper | Feasibility Jul 2025 | C$2.00B | — | C$2.00B | 25 yrs | — |
| 82 | HyProMag USA - Three Plant Target Mkango Resources Ltd. (MKA.V) | Rare Earths (NdFeB magnets) | — | $2.00B | — | — | — | — |
| 83 | La Caridad Southern Copper Corporation (SCCO) | Copper | Resource Estimate Dec 2024 | $2.00B | — | $4.50B | 58 yrs | — |
| 84 | Gunnison Project Gunnison Copper Corp. (GCU.TO) | Copper | PEA Mar 2026 | $1.96B | 22.5% | $1.56B | 21 yrs | 2.1 USD/lb Cu |
| 85 | Ontario Operations Vale S.A. (VALE) | Nickel / Copper | Feasibility Dec 2025 | $1.95B | — | — | 21 yrs | — |
| 86 | Çöpler Project (Initial Assessment MI Case) SSR Mining Inc. (SSRM) | Gold | PEA Sep 2022 | $1.87B | — | — | 22 yrs | 921 USD/oz gold |
| 87 | Luanga PGM + Au + Ni Project (Alternate Case - Vertical Integration / Smelter) Bravo Mining Corp. (BRVO.V) | PGM (Palladium, Platinum, Rhodium), Gold, Nickel | PEA Aug 2025 | $1.86B | 49% | $182M | 17 yrs | — |
| 88 | White Gold Project White Gold Corp. (WGO.V) | Gold | PEA Aug 2026 | C$1.86B | 40.7% | C$1.00B | 9.4 yrs | 1,482 USD/oz |
| 89 | Toroparu Project Aris Mining Corporation (ARIS.TO) | Gold | PEA Oct 2025 | $1.80B | 25.2% | $820M | 21.3 yrs | 1,300 USD/oz |
| 90 | Panuco Silver & Gold Project Vizsla Silver Corp. (VZLA.TO) | Silver | Feasibility Nov 2025 | $1.80B | 111% | $239M | 9.4 yrs | 10.6 USD/oz AgEq |
| 91 | Panuco Vizsla Royalties Corp. (VROY.V) | Silver | Feasibility Nov 2025 | $1.80B | 111.1% | $239M | 9.4 yrs | 10.6 USD/oz payable AgEq |
| 92 | Metates (2016 PFS comparison) Chesapeake Gold Corp. (CKG.V) | Gold & Silver | Pre-Feasibility Apr 2016 | $1.80B | — | $3.50B | 27 yrs | — |
| 93 | Cuajone Operations Southern Copper Corporation (SCCO) | Copper | Feasibility Feb 2025 | $1.79B | — | — | 50.4 yrs | — |
| 94 | Çöpler District Master Plan 2021 (Çöpler, Çakmaktepe, Ardich, Bayramdere deposits) SSR Mining Inc. (SSRM) | Gold | Feasibility Sep 2022 | $1.73B | — | — | 21 yrs | 966 USD/oz gold |
| 95 | Crater Lake Scandium Project Scandium Canada Ltd. (SCD.V) | Scandium (Sc2O3) / Rare Earth Elements | PEA Jul 2022 | C$1.72B | 32.8% | C$871M | 25 yrs | — |
| 96 | Ikkari Rupert Resources Ltd. (RUP.TO) | Gold | Pre-Feasibility Feb 2025 | $1.70B | 38% | $575M | 20 yrs | 918 USD/oz |
| 97 | South West Arkansas (SWA) Project Standard Lithium Ltd. (SLI.V) | Lithium (Lithium Carbonate) | Feasibility Oct 2025 | $1.70B | 20% | $1.45B | 20 yrs | 4,516 USD/t |
| 98 | Ikkari (Rupert Resources) Aurion Resources Ltd. (AU.V) | Gold | Pre-Feasibility Feb 2025 | $1.68B | 38% | $575M | — | — |
| 99 | Carina Project Aclara Resources Inc. (ARA.TO) | Heavy Rare Earths (MREC) | Feasibility Apr 2026 | $1.66B | 26.9% | $781M | 18 yrs | — |
| 100 | Magnolia Field Bromine (Albemarle) Albemarle Corporation (ALB) | Bromine | Feasibility Feb 2026 | $1.64B | — | — | — | — |
| 101 | Magnolia Field Bromine Brine Operations Albemarle Corporation (ALB) | Bromine | Production Dec 2025 | $1.64B | — | — | — | — |
| 102 | Bankan Gold Project Robex Resources Inc. (RBX.V) | Gold | Feasibility Jun 2025 | $1.64B | 46% | $463M | 12.2 yrs | 1,057 USD/oz |
| 103 | Mont Sorcier Cerrado Gold Inc. (CERT.V) | Iron (DRI concentrate) | PEA Jul 2022 | $1.61B | 43% | $456M | 21 yrs | 28.2 USD/t |
| 104 | Shaakichiuwaanaan Project (CV5 Pegmatite) PMET Resources Inc. (PMET.TO) | Lithium | Feasibility Nov 2025 | C$1.59B | 18.1% | C$1.50B | — | 799.8 CAD/t conc |
| 105 | Wheeler River - Phoenix Denison Mines Corp. (DML.TO) | Uranium (U3O8) | Feasibility Jun 2023 | C$1.57B | 73% | C$600M | 10 yrs | 18.4 USD/lb U3O8 |
| 106 | Alto Paraná Titanium Project – Stretch Case Uranium Energy Corp. (UEC) | Titanium (high titania slag) with high purity pig iron (HPPI) | PEA Nov 2023 | $1.55B | 25% | $918M | 23 yrs | — |
| 107 | Target Gold Mine Harmony Gold Mining Company (HMY) | Gold | Feasibility Oct 2024 | ZAR 1.52B | — | — | 5 yrs | — |
| 108 | Volcan Gold Project Tiernan Gold Corp. (TNGD.V) | Gold-Copper | PEA Jul 2025 | $1.51B | 28.7% | $1.02B | 13.6 yrs | 1,094 USD/oz Au |
| 109 | El Dorado–Monserrat (EDM) Fredonia Mining Inc. (FRED.V) | Gold | PEA Aug 2026 | $1.50B | 65% | $346M | 17 yrs | 1,720 USD/oz Au |
| 110 | Shaakichiuwaanaan (CV5 Lithium Only) PMET Resources Inc. (PMET.TO) | Lithium | Feasibility Oct 2025 | C$1.50B | — | — | — | — |
| 111 | Carina Module Aclara Resources Inc. (ARA.TO) | Rare Earth Elements (Heavy REE) | PEA Sep 2024 | $1.48B | 26.5% | $593M | 22 yrs | — |
| 112 | CarLang A Nickel Project EV Nickel Inc. (EVNI.V) | Nickel | PEA Jun 2025 | C$1.48B | 14% | C$3.32B | 20 yrs | 7 CAD/lb Ni-Eq |
| 113 | Shaw Dome Project - CarLang A Deposit EV Nickel Inc. (EVNI.V) | Nickel | PEA 2025 | $1.48B | — | — | 20 yrs | — |
| 114 | Santo Tomás Oroco Resource Corp. (OCO.V) | Copper | PEA Aug 2024 | $1.48B | 22.2% | $1.10B | 22.6 yrs | 2 USD/lb Cu |
| 115 | Salares Norte Gold Fields Limited (GFI) | Gold | Pre-Feasibility Mar 2025 | $1.47B | — | — | 11 yrs | — |
| 116 | Kwyjibo Project (Josette Zone) Consolidated Lithium Metals Inc. (CLM.V) | Rare Earth Elements (TREO) | PEA Aug 2026 | C$1.40B | 35.4% | C$881M | 10 yrs | — |
| 117 | Higginsville Expansion (HXP) Westgold Resources Limited (WGX.TO) | Gold | Feasibility | A$1.40B | 43% | A$145M | — | — |
| 118 | Higginsville Hub Expansion (HXP) Westgold Resources Limited (WGX.TO) | Gold | Pre-Feasibility Mar 2026 | A$1.40B | 43% | A$145M | — | — |
| 119 | Kindersley Lithium Project (KLP) - Phase 1 CAD Grounded Lithium Corp. (GRD.V) | Lithium | PEA Jun 2023 | C$1.35B | — | — | — | — |
| 120 | Patterson Lake South (PLS) Project Paladin Energy Ltd. (PDN.TO) | Uranium | Feasibility Jan 2023 | $1.32B | 28.2% | $1.23B | 10 yrs | 15.2 USD/lb U3O8 |
| 121 | Tilden Property (Tilden Mine) Cleveland-Cliffs Inc. (CLF) | Iron Ore (hematite-dominant, fluxed pellets) | Feasibility Feb 2022 | $1.32B | — | — | 25 yrs | — |
| 122 | Tilden Property Cleveland-Cliffs Inc. (CLF) | Iron Ore (Pellets) | Production Feb 2022 | $1.32B | — | — | 25 yrs | 66 USD/WLT Pellet (operating cost) |
| 123 | Lola Graphite Project Falcon Energy Materials Inc. (FLCN.V) | Graphite | PEA 2025 | $1.32B | 43.1% | $291M | 25 yrs | 680 USD/t NFG concentrate |
| 124 | Darling Range (Huntly and Willowdale Bauxite Mines) Alcoa Corporation (AA) | Bauxite | Feasibility Feb 2022 | $1.32B | — | — | 7 yrs | — |
| 125 | Nechalacho Rare Earth Project Avalon Advanced Materials Inc. (AVL.TO) | Rare Earths | Feasibility 2013 | C$1.30B | 19.6% | C$1.60B | — | — |
| 126 | Camino Rojo Equinox Gold Corp. (EQX.TO) | Gold | Resource Estimate Mar 2026 | $1.30B | 30% | $608M | 17 yrs | 1,304 USD/oz |
| 127 | Camino Rojo Underground (PEA) Equinox Gold Corp. (EQX.TO) | Gold | PEA Mar 2026 | $1.30B | 30% | $608M | 17 yrs | 1,304 USD/oz |
| 128 | PLS Project (Patterson Lake South, Triple R Deposit) Paladin Energy Ltd. (PDN.TO) | Uranium (U3O8) | Feasibility Jan 2023 | $1.30B | 28.2% | $1.23B | 10 yrs | 11.7 USD/lb U3O8 |
| 129 | Rio Grande Project NOA Lithium Brines Inc. (NOAL.V) | Lithium | PEA Oct 2025 | $1.28B | 22.6% | $706M | 30 yrs | — |
| 130 | South West Arkansas Project Standard Lithium Ltd. (SLI.V) | Lithium | Feasibility Oct 2025 | $1.27B | 18.2% | $1.45B | 20 yrs | 5,923.8 USD/t LCE |
| 131 | Nechalacho Rare Earth Elements Project Avalon Advanced Materials Inc. (AVL.TO) | Rare Earth Elements | Feasibility May 2013 | $1.26B | 19.6% | $1.45B | 20 yrs | — |
| 132 | Goldfields - Upper Case Fortune Bay Corp. (FOR.V) | Gold | PEA Oct 2025 | C$1.25B | 74% | — | — | — |
| 133 | Luanga PGM + Au + Ni Project Bravo Mining Corp. (BRVO.V) | PGM (Palladium, Platinum, Rhodium), Gold, Nickel | PEA Aug 2025 | $1.25B | 49% | $496M | 17 yrs | — |
| 134 | Copper World (Base Case) Hudbay Minerals Inc. (HBM.TO) | Copper | Feasibility Oct 2026 | $1.24B | 16.8% | $2.07B | 15 yrs | 2.2 USD/lb Cu (sustaining cash cost); cash cost $1.65/lb |
| 135 | Porcupine Complex Discovery Silver Corp. (DSV.TO) | Gold | PEA Jan 2025 | $1.20B | — | — | 22 yrs | 1,504 USD/oz |
| 136 | Patterson Lake South (PLS) / Triple R Paladin Energy Ltd. (PDN.TO) | Uranium (U3O8), with gold by-product | Feasibility Jan 2023 | C$1.20B | 27% | C$1.16B | — | — |
| 137 | Nechalacho Project (Basal Zone) Avalon Advanced Materials Inc. (AVL.TO) | Rare Earths | Feasibility 2013 | C$1.20B | 20% | C$1.60B | — | — |
| 138 | Costa Fuego (Productora + Cortadera) Hot Chili Limited (HCH.V) | Copper | Pre-Feasibility Mar 2025 | $1.20B | 19% | $1.27B | 20 yrs | — |
| 139 | Ontario Operations (Sudbury) Vale S.A. (VALE) | Nickel, Copper | Resource Estimate Dec 2021 | $1.18B | — | — | — | — |
| 140 | Colomac Gold Project STLLR Gold Inc. (STLR.TO) | Gold | PEA Jun 2023 | C$1.17B | 34.6% | C$654M | 11 yrs | 828 USD/oz |
| 141 | Malmbjerg Molybdenum Project Greenland Resources Inc. (MOLY.TO) | Molybdenum | Feasibility Apr 2022 | $1.17B | 22.4% | $820M | — | 12.4 USD/t ore milled |
| 142 | Kuska Wealth Minerals Ltd. (WML.V) | Lithium | PEA Jan 2024 | $1.15B | 28% | — | 20 yrs | — |
| 143 | Battery Materials Plant (BMP) – Morocco Falcon Energy Materials Inc. (FLCN.V) | Graphite (CSPG anode material) | PEA 2025 | $1.15B | 82% | $106M | 25 yrs | 3,193 USD/t CSPG |
| 144 | Metates Chesapeake Gold Corp. (CKG.V) | Gold-Silver | PEA Jan 2023 | $1.14B | 35% | $359M | 31 yrs | 749 US$/oz Au |
| 145 | Panuco Ag-Au-Pb-Zn Project Vizsla Silver Corp. (VZLA.TO) | Silver | PEA Sep 2024 | $1.14B | 85.7% | $224M | — | — |
| 146 | Mt Todd Gold Project Vista Gold Corp. (VGZ) | Gold | Feasibility Mar 2024 | $1.13B | 20.4% | $1.03B | 16 yrs | — |
| 147 | Perron Gold Project Amex Exploration Inc. (AMX.V) | Gold | Feasibility Apr 2026 | C$1.13B | 114.6% | C$194M | 5 yrs | 910 USD/oz |
| 148 | Copper World Arizona Sonoran Copper Company (ASCU.TO) | Copper | Pre-Feasibility | $1.10B | 19% | $1.30B | 20 yrs | — |
| 149 | Hemlo Gold Mine Hemlo Mining Corp. (HMMC.V) | Gold | Feasibility Oct 2025 | $1.09B | — | — | 14 yrs | 1,545 USD/oz |
| 150 | Koné Gold Project Montage Gold Corp. (MAU.TO) | Gold | Feasibility Feb 2024 | $1.09B | 31% | $712M | 16 yrs | 998 USD/oz |
| 151 | Mabilo RTG Mining Inc. (RTG.TO) | Copper & Gold | Feasibility Mar 2016 | $1.08B | — | $25M | 7 yrs | — |
| 152 | Moonlight-Superior Copper Project US Copper Corp. (USCU.V) | Copper | PEA Jan 2025 | $1.07B | 23% | $956M | — | 2.5 USD/lb Cu Produced |
| 153 | Marathon Copper-Palladium Project Generation Mining Limited (GENM.TO) | Copper-Palladium | Feasibility Mar 2025 | C$1.07B | 28% | C$992M | 13 yrs | 781 USD/PdEq oz |
| 154 | North Island Copper and Gold Project NorthIsle Copper and Gold Inc. (NCX.V) | Copper (Gold, Molybdenum by-products) | PEA May 2022 | C$1.06B | 19% | — | 22 yrs | — |
| 155 | Casa Berardi Orezone Gold Corporation (ORE.TO) | Gold | PEA Sep 2026 | $1.05B | — | — | 14 yrs | 1,877 USD/oz |
| 156 | Bralorne Gold Project Talisker Resources Ltd. (TSK.TO) | Gold | PEA Sep 2026 | C$1.05B | 31.3% | C$416M | 17.6 yrs | 1,914 USD/oz |
| 157 | Yandera Copper Project Freeport Resources Inc. (FRI.V) | Copper | Pre-Feasibility Nov 2017 | $1.04B | 23.5% | $930M | 20 yrs | — |
| 158 | Magnolia Field Bromine Reserves Albemarle Corporation (ALB) | Bromine | Resource Estimate Feb 2025 | $1.04B | — | — | — | — |
| 159 | Ying Ag-Pb-Zn-Au Property Silvercorp Metals Inc. (SVM.TO) | Silver | Feasibility Dec 2025 | $1.03B | — | — | — | — |
| 160 | James Bay Niobium - Open Pit Scenario NioBay Metals Inc. (NBY.V) | Niobium (Nb₂O₅) | PEA | C$1.01B | 27.5% | — | 30 yrs | — |
| 161 | La Mina GoldMining Inc. (GOLD.TO) | Gold-Copper | PEA Apr 2026 | $1.00B | 32.2% | $523M | 11.2 yrs | 1,045 USD/oz Au |
| 162 | Wicheeda Rare Earth Element Project Defense Metals Corp. (DEFN.V) | Rare Earth Elements (Nd, Pr, TREO) | Pre-Feasibility Apr 2025 | $1.00B | 18.6% | $1.40B | — | — |
| 163 | Roughrider Project Uranium Energy Corp. (UEC) | Uranium (U3O8) | PEA Nov 2024 | $1.00B | 42% | $545M | 9 yrs | 20.5 USD/lb U3O8 |
| 164 | Kindersley Lithium Project (KLP) Grounded Lithium Corp. (GRD.V) | Lithium | PEA Jun 2023 | $1.00B | 48.5% | $335M | — | — |
| 165 | Wicheeda Rare Earth Project Defense Metals Corp. (DEFN.V) | Rare Earth Elements (NdPr, Tb, Dy) | Pre-Feasibility Feb 2025 | $992M | 18.9% | $1.44B | 15 yrs | — |
| 166 | Cabaçal Meridian Mining UK Societas (MNO.TO) | Gold-Copper | Pre-Feasibility Mar 2025 | $984M | 61.2% | $248M | 10.6 yrs | 742.3 USD/oz AuEq |
| 167 | Huasco Water - Stage 2 (Desalinated Water Supply to Huasco Valley) Hot Chili Limited (HCH.V) | Water | Pre-Feasibility | $977M | 19% | $1.40B | — | — |
| 168 | Midwest (Midwest Main) Denison Mines Corp. (DML.TO) | Uranium (U3O8) | PEA Aug 2025 | C$965M | 82.7% | C$254M | — | 25.8 USD/lb U3O8 |
| 169 | Wicheeda Rare Earths Project Defense Metals Corp. (DEFN.V) | Rare Earth Elements (REE) | Pre-Feasibility Feb 2025 | $957M | 18.6% | $1.44B | 15 yrs | — |
| 170 | Dos Amigos (Domeyko Sulfuros) Tintina Mines Limited (TTS.V) | Copper (Gold by-product) | PEA Feb 2026 | $943M | 20% | $1.30B | 25 yrs | — |
| 171 | Gabbs Project P2 Gold Inc. (PGLD.V) | Gold-Copper | PEA Oct 2025 | $943M | 33.8% | $383M | 14.2 yrs | 1,284 USD/oz Au |
| 172 | Gramalote Project B2Gold Corp. (BTO.TO) | Gold | Feasibility Jul 2025 | $941M | 22.4% | $740M | 13 yrs | 985 USD/oz |
| 173 | PAK Lithium Project Frontier Lithium Inc. (FL.V) | Lithium | Feasibility 2025 | C$932M | 17.9% | C$943M | 31 yrs | 624 CAD/tonne of concentrate sold |
| 174 | Florence Copper Taseko Mines Limited (TGB) | Copper | Feasibility Mar 2023 | $930M | 47% | — | 22 yrs | 1.1 USD/lb |
| 175 | La Caridad (LC) Southern Copper Corporation (SCCO) | Copper | Pre-Feasibility Feb 2022 | $927M | — | $737M | — | — |
| 176 | Great Atlantic Salt Project (Atlas Salt Inc.) Vulcan Minerals Inc. (VUL.V) | Salt | Feasibility Sep 2025 | C$920M | 21.3% | C$589M | 24 yrs | — |
| 177 | Goldfields - Intermediate Case Fortune Bay Corp. (FOR.V) | Gold | PEA Oct 2025 | C$916M | 59% | — | — | — |
| 178 | Fondaway Canyon Getchell Gold Corp. (GTCH.CN) | Gold | PEA Jun 2026 | $905M | 53.1% | $265M | 10.1 yrs | — |
| 179 | James Bay Niobium - Open Pit & Underground Scenario NioBay Metals Inc. (NBY.V) | Niobium (Nb₂O₅) | PEA | C$865M | 27% | — | 23 yrs | — |
| 180 | Wheeler River - Gryphon Denison Mines Corp. (DML.TO) | Uranium (U3O8) | Pre-Feasibility Jun 2023 | C$864M | 37.6% | C$737M | 6.5 yrs | 25.5 USD/lb U3O8 |
| 181 | James Bay Niobium Project (OP+UG) NioBay Metals Inc. (NBY.V) | Niobium (Nb) | PEA Oct 2020 | C$856M | 27% | C$482M | 23 yrs | 20.5 USD/kg Nb |
| 182 | Schaft Creek Copper Fox Metals Inc. (CUU.V) | Copper | PEA Sep 2021 | $842M | 12.9% | $2.65B | 21 yrs | 1.2 USD/lb |
| 183 | CC&V SSR Mining Inc. (SSRM) | Gold | Feasibility Nov 2025 | $824M | — | — | 12 yrs | 2,135 USD/oz |
| 184 | South Railroad Equinox Gold Corp. (EQX.TO) | Gold | Feasibility Feb 2026 | $783M | 48% | $395M | 10 yrs | 1,505 USD/oz Au |
| 185 | Čoka Rakita (Feasibility Study) DPM Metals Corp. (DPM.TO) | Gold | Feasibility Jan 2026 | $782M | 36% | $448M | 10 yrs | 644 USD/oz payable gold |
| 186 | Musselwhite Mine Equinox Gold Corp. (EQX.TO) | Gold | Feasibility Dec 2024 | $782M | — | — | 7 yrs | — |
| 187 | DeLamar Project Integra Resources Corp. (ITR.V) | Gold | Feasibility Feb 2026 | $774M | 46% | $389M | 10 yrs | 1,480 USD/oz AuEq |
| 188 | Manono Lithium Tailings Project Tantalex Lithium Resources Corp. (TTX.CN) | Lithium | PEA Oct 2023 | $765M | 87% | $147M | 6 yrs | — |
| 189 | La Cigarra Kootenay Silver Inc. (KTN.V) | Silver | PEA Jun 2026 | $763M | 41% | $332M | 14 yrs | 18.7 USD/oz |
| 190 | Falco Horne 5 Project Falco Resources Ltd. (FPC.V) | Gold (polymetallic deposit with silver, copper, zinc) | Feasibility Mar 2021 | $761M | 18.9% | $844M | 15 yrs | 587 USD/oz |
| 191 | Koné Gold Project (KGP) Montage Gold Corp. (MAU.TO) | Gold | Feasibility Feb 2022 | $746M | 34.8% | $544M | — | 933 USD/oz |
| 192 | Zuun Mod Molybdenum-Copper Project Erdene Resource Development Corp. (ERD.TO) | Molybdenum | PEA Oct 2026 | $745M | 16.1% | $687M | 34 yrs | 13.9 USD/lb Mo |
| 193 | Silver Sand New Pacific Metals Corp. (NUAG.TO) | Silver | Pre-Feasibility Jun 2024 | $740M | 37% | $358M | 13 yrs | 10.7 USD/oz Ag |
| 194 | Silver Sand Silvercorp Metals Inc. (SVM.TO) | Silver | Pre-Feasibility 2024 | $740M | 37% | $358M | 13 yrs | 11 USD/oz |
| 195 | James Bay Niobium Project (UG) NioBay Metals Inc. (NBY.V) | Niobium (Nb) | PEA Oct 2020 | C$733M | 21.6% | C$579M | 23 yrs | 21.4 USD/kg Nb |
| 196 | New Amalga Gold Project Grande Portage Resources Ltd. (GPG.V) | Gold | PEA Feb 2026 | $721M | 56% | $255M | 7 yrs | 1,408 USD/oz Au |
| 197 | Tiros Project Resouro Strategic Metals Inc. (RSM.V) | Titanium & Rare Earths | PEA Jul 2026 | $715M | 44.2% | $191M | 20 yrs | — |
| 198 | Tiros Rare Earths and Titanium Project Resouro Strategic Metals Inc. (RSM.V) | Rare Earths & Titanium | PEA Jul 2026 | $715M | 44.2% | $160M | 20 yrs | 219 US$/t ROM |
| 199 | Adanac Molybdenum Project (Ruby Creek Molybdenum Deposit) EraNova Metals Corp. (NOVA.V) | Molybdenum | PEA Aug 2026 | C$715M | 23.5% | C$953M | 24 yrs | 19.8 CAD/lb |
| 200 | Adanac Molybdenum Project (Ruby Creek) EraNova Metals Corp. (NOVA.V) | Molybdenum | PEA 2026 | C$714M | 23.5% | C$953M | 24 yrs | 19.8 CAD/lb Mo |
| 201 | Copper Creek Faraday Copper Corp. (FDY.TO) | Copper | PEA May 2023 | $713M | 15.6% | $798M | 32 yrs | 1.9 USD/lb |
| 202 | Marimaca Oxide Deposit (MOD) Marimaca Copper Corp. (MARI.TO) | Copper | Feasibility Aug 2025 | $709M | 31% | $587M | 13 yrs | 2 USD/lb Cu |
| 203 | Fenelon Gold Project Wallbridge Mining Company Limited (WM.TO) | Gold | PEA Mar 2025 | C$706M | 21% | C$579M | 16 yrs | 1,046 USD/oz |
| 204 | Ying Ag-Pb-Zn Property Silvercorp Metals Inc. (SVM.TO) | Silver | Feasibility Jun 2024 | $699M | — | — | — | — |
| 205 | Lemhi Gold Project Freeman Gold Corp. (FMAN.V) | Gold | Feasibility Jun 2026 | $696M | 34.4% | $330M | 15 yrs | — |
| 206 | Tia Maria Copper Project Southern Copper Corporation (SCCO) | Copper | Feasibility Mar 2022 | $676M | 16.6% | $1.75B | 20 yrs | — |
| 207 | Volta Grande Belo Sun Mining Corp. (BSX.TO) | Gold | Feasibility May 2015 | $665M | 26% | $298M | 17.2 yrs | 779 USD/oz |
| 208 | Enchi Gold Project - Spot Price Case Newcore Gold Ltd. (NCAU.V) | Gold | Pre-Feasibility Jun 2026 | $647M | 45% | $351M | 9.3 yrs | — |
| 209 | Campo Morado Mine Luca Mining Corp. (LUCA.V) | Zinc | PEA Mar 2018 | $645M | — | — | — | — |
| 210 | Bomboré Phase II Expansion Orezone Gold Corporation (ORE.TO) | Gold | Feasibility Nov 2023 | $636M | — | $168M | — | — |
| 211 | Bomboré Orezone Gold Corporation (ORE.TO) | Gold | Feasibility Nov 2023 | $636M | — | $58M | — | 2,200 USD/oz |
| 212 | Bomboré Star Royalties Ltd. (STRR.V) | Silver | Feasibility Nov 2023 | $636M | — | — | 11 yrs | — |
| 213 | Douta Gold Project Thor Explorations Ltd. (THX.V) | Gold | Pre-Feasibility Jan 2026 | $633M | 61% | $254M | 12.6 yrs | 1,890 USD/oz |
| 214 | Waihi District - Alternative Case OceanaGold Corporation (OGC.TO) | Gold | Pre-Feasibility Dec 2024 | $621M | 24% | — | — | — |
| 215 | El Brocal Compania de Minas Buenaventura S.A.A. (BVN) | Copper, Silver, Lead, Zinc | Resource Estimate Dec 2024 | $619M | — | — | 17 yrs | — |
| 216 | Northshore Property Cleveland-Cliffs Inc. (CLF) | Iron Ore (Magnetite Taconite Pellets) | Feasibility Feb 2022 | $619M | — | — | 48 yrs | — |
| 217 | La Loutre Graphite Project Lomiko Metals Inc. (LMR.V) | Graphite | Pre-Feasibility May 2026 | C$617M | 24.7% | C$505M | 28 yrs | 514 US$/t conc. |
| 218 | Johnson Tract Project Dolly Varden Silver Corp. (DV.V) | Gold (Au-Ag-Cu-Zn-Pb polymetallic) | PEA May 2025 | $615M | 60% | $214M | 7 yrs | 860 USD/oz AuEq sold |
| 219 | Mineral Point Open Pit (Ruby Hill) i-80 Gold Corp. (IAU.TO) | Gold | PEA Mar 2025 | $614M | 12% | — | 17 yrs | 1,400 USD/oz |
| 220 | Goldfields Project (Box & Athona) Fortune Bay Corp. (FOR.V) | Gold | PEA Oct 2025 | C$610M | 44% | C$301M | 14 yrs | 1,330 USD/oz |
| 221 | Scottie Gold Mine (Toll Milling Scenario) Scottie Resources Corp. (SCOT.V) | Gold | PEA Oct 2025 | C$606M | 135.2% | — | — | — |
| 222 | Castelo de Sonhos TriStar Gold Inc. (TSG.V) | Gold | Pre-Feasibility May 2025 | $603M | 40% | $296M | 11 yrs | 1,111 USD/oz |
| 223 | Florida Canyon Mine Integra Resources Corp. (ITR.V) | Gold | Feasibility Jul 2026 | $601M | — | — | 8 yrs | 2,331 USD/oz |
| 224 | Molo Modular Phase 2 NextSource Materials Inc. (NEXT.TO) | Graphite | PEA Jan 2022 | $593M | 31.4% | $156M | 26 yrs | — |
| 225 | United Taconite Property (Thunderbird Mine - TBN & TBS; Fairlane Facility) Cleveland-Cliffs Inc. (CLF) | Iron Ore (magnetite/taconite pellets) | Feasibility Feb 2022 | $591M | — | — | 51 yrs | — |
| 226 | United Taconite Property (Thunderbird Mine North and South / Fairlane Facility) Cleveland-Cliffs Inc. (CLF) | Iron Ore (magnetite / taconite pellets) | Production Dec 2021 | $591M | — | — | 51 yrs | — |
| 227 | Duparquet Gold Project First Mining Gold Corp. (FF.TO) | Gold | PEA Oct 2023 | C$588M | 18% | C$706M | 11 yrs | 976 USD/oz |
| 228 | El Domo Silvercorp Metals Inc. (SVM.TO) | Copper-Gold | Feasibility 2026 | $571M | 46% | $284M | 11.5 yrs | — |
| 229 | Cerro Las Minitas (CLM) - +15% Case Southern Silver Exploration Corp. (SSV.V) | Silver (Ag-Cu-Pb-Zn) | PEA Aug 2022 | $561M | 24.4% | — | — | — |
| 230 | Lucky Friday Mine Hecla Mining Company (HL) | Silver | Feasibility Feb 2022 | $554M | — | — | 17 yrs | — |
| 231 | Eau Claire Gold Project Fury Gold Mines Limited (FURY.TO) | Gold | Pre-Feasibility Jun 2026 | C$554M | 41% | C$217M | 11 yrs | 1,140 USD/oz |
| 232 | Eau Claire Project (Eau Claire & Percival) Fury Gold Mines Limited (FURY.TO) | Gold | PEA Sep 2025 | C$554M | 41% | C$217M | 11 yrs | 1,140 USD/oz |
| 233 | North Island Copper and Gold Project (Hushamu & Red Dog) NorthIsle Copper and Gold Inc. (NCX.V) | Copper, Gold, Molybdenum, Pyrite | PEA Oct 2017 | C$550M | 14.3% | C$1.34B | — | — |
| 234 | Hugo North Extension (HNE) Lift 2 Entrée Resources Ltd. (ETG.TO) | Copper-Gold-Silver | PEA Oct 2021 | $541M | — | — | 22 yrs | 0.9 USD/lb payable Cu |
| 235 | Quinchía Gold Project Tiger Gold Corp. (TIGR.V) | Gold | PEA Sep 2025 | $534M | 21.3% | $480M | — | 1,340 USD/oz |
| 236 | O'Brien Gold Project Globex Mining Enterprises Inc. (GMX.TO) | Gold | PEA Aug 2025 | C$532M | 47.6% | C$175M | 11 yrs | 1,058.5 USD/oz |
| 237 | São Jorge GoldMining Inc. (GOLD.TO) | Gold | PEA Jun 2026 | $532M | 42% | $202M | 10.6 yrs | — |
| 238 | Condor Gold Project Silvercorp Metals Inc. (SVM.TO) | Gold | PEA Jan 2026 | $522M | 29% | $292M | 13 yrs | 1,359 USD/EqOz-Payable |
| 239 | Kilbourne Graphite Project Titan Mining Corp. (TI.TO) | Graphite | PEA | $513M | 37% | $156M | 13 yrs | — |
| 240 | Opemiska XXIX Metal Corp. (XXIX.V) | Copper | PEA Oct 2025 | C$505M | 27% | — | 17 yrs | — |
| 241 | Cerro Las Minitas Southern Silver Exploration Corp. (SSV.V) | Silver | PEA Jun 2024 | $501M | 21.2% | $388M | 17.1 yrs | 13.2 USD/oz AgEq |
| 242 | Carangas Silvercorp Metals Inc. (SVM.TO) | Silver | PEA 2024 | $501M | 26% | $324M | 16 yrs | 8 USD/oz |
| 243 | Kandiolé Gold Project Roscan Gold Corporation (ROS.V) | Gold | PEA Feb 2026 | $498M | 43% | $219M | 13 yrs | 1,568 USD/oz |
| 244 | Enchi Gold Project Newcore Gold Ltd. (NCAU.V) | Gold | Pre-Feasibility Aug 2026 | $496M | 37% | $351M | 9.3 yrs | 2,290 USD/oz |
| 245 | Chvaletice Manganese Project Euro Manganese Inc. (EMN.V) | Manganese | PEA Jun 2026 | $492M | 13.8% | $825M | 26 yrs | — |
| 246 | Battery Hill Electric Royalties Ltd. (ELEC.V) | Manganese | PEA May 2022 | $486M | 25% | — | 47 yrs | — |
| 247 | Beartrack-Arnett Gold Project Revival Gold Inc. (RVG.V) | Gold | Pre-Feasibility Aug 2023 | $484M | — | — | — | — |
| 248 | Minera Valle Central (MVC) – Cauquenes Phase Two Expansion Amerigo Resources Ltd. (ARG.TO) | Copper | PEA Dec 2016 | $480M | — | $30M | 21 yrs | — |
| 249 | El Arco Project Southern Copper Corporation (SCCO) | Copper | Pre-Feasibility Mar 2022 | $475M | 12.1% | — | 35 yrs | — |
| 250 | Borralha Tungsten Project Allied Critical Metals Corp. (ACM.CN) | Tungsten (WO₃) | PEA Apr 2026 | C$473M | 48.8% | C$124M | 11 yrs | 303 USD/mtu |
| 251 | Project Dynamo Aclara Resources Inc. (ARA.TO) | Rare Earth Oxides (NdPr, Dy, Tb) | PEA Apr 2026 | $470M | 25.2% | $277M | — | — |
| 252 | Project Dynamo (Louisiana Separation Project) Aclara Resources Inc. (ARA.TO) | Rare Earths (NdPr, Dy, Tb separation) | Scoping Study Sep 2026 | $470M | 25.2% | $277M | — | — |
| 253 | Porvenir (Nicaragua) Mineros S.A. (MSA.TO) | Gold/Polymetallic (Au, Ag, Zn, Cu) | Pre-Feasibility Mar 2026 | $460M | 37.9% | $207M | 10 yrs | 1,295 USD/oz AuEq |
| 254 | Shovelnose Westhaven Gold Corp. (WHN.V) | Gold | PEA Apr 2025 | C$454M | 43.2% | C$185M | 11.1 yrs | 836 USD/oz AuEq |
| 255 | Camino Rojo Orla Mining Ltd. (OLA.TO) | Gold | Feasibility Jan 2021 | $452M | 62% | $134M | 10.4 yrs | 543 USD/oz Au |
| 256 | Buckreef Gold Project TRX Gold Corporation (TRX.TO) | Gold | PEA May 2025 | $442M | — | $89M | 17.6 yrs | 1,206 USD/oz |
| 257 | UAE Battery Anode Facility (BAF) NextSource Materials Inc. (NEXT.TO) | Graphite (Anode Materials) | Pre-Feasibility Oct 2025 | $442M | 24.2% | $291M | — | — |
| 258 | Nueva Recuperada Silver Project (Tangana + Plata) Silver X Mining Corp. (AGX.V) | Silver | PEA Sep 2025 | $440M | 69% | $82M | 14 yrs | 15.8 USD/oz AgEq |
| 259 | Tonopah West Project Blackrock Silver Corp. (BRC.V) | Silver | PEA May 2026 | $437M | 28% | $190M | 11.2 yrs | 17.4 USD/oz AgEq payable |
| 260 | Karowe Diamond Mine (KDM) Lucara Diamond Corp. (LUC.TO) | Diamonds | Feasibility Sep 2025 | $432M | — | $779M | — | — |
| 261 | Ana Paula Project Heliostar Metals Ltd. (HSTR.V) | Gold | PEA Nov 2025 | $426M | 28.1% | $300M | 9 yrs | 1,011 USD/oz |
| 262 | Cerro del Gallo Project Heliostar Metals Ltd. (HSTR.V) | Gold | Pre-Feasibility Dec 2025 | $424M | 33.1% | $195M | 15 yrs | 1,390 USD/GEO |
| 263 | Copperstone Project Minera Alamos Inc. (MAI.V) | Gold | Pre-Feasibility Sep 2026 | $421M | 111% | $57M | 6.3 yrs | 1,338 USD/oz |
| 264 | Alto Paraná Titanium Project Uranium Energy Corp. (UEC) | Titanium (ilmenite / high titania slag) | PEA Nov 2023 | $419M | 21% | $338M | 24 yrs | — |
| 265 | Wind Mountain Bravada Gold Corporation (BVA.V) | Gold | PEA Aug 2026 | $415M | 60% | $98M | 11.2 yrs | 1,653 USD/oz |
| 266 | Los Ricos North GoGold Resources Inc. (GGD.TO) | Silver (with Gold and base metals) | PEA May 2023 | $413M | — | — | — | — |
| 267 | Sorby Hills Vox Royalty Corp. (VOXR.TO) | Silver & Lead | Feasibility Jun 2024 | A$411M | 37% | A$264M | 8.5 yrs | — |
| 268 | Samapleu Project Sama Resources Inc. (SME.V) | Nickel, Copper, Iron | PEA Jun 2020 | $391M | 27.2% | $282M | 20 yrs | — |
| 269 | Cadillac Project (PEA reference on timeline) Cartier Resources Inc. (ECR.V) | Gold | PEA undefined 2022 | C$388M | 21% | — | — | — |
| 270 | Condestable Mine (Condestable & Raúl) Rio2 Limited (RIO.TO) | Copper | Feasibility Apr 2024 | $386M | — | — | 13.2 yrs | — |
| 271 | Toquepala Southern Copper Corporation (SCCO) | Copper | Feasibility Feb 2025 | $374M | — | — | 41.2 yrs | — |
| 272 | Molo Graphite Expansion NextSource Materials Inc. (NEXT.TO) | Graphite | Feasibility Jan 2024 | $370M | 29% | $187M | — | 714.3 USD/t concentrate |
| 273 | Alacran Project Cordoba Minerals Corp. (CDB.V) | Copper, Gold, Silver | Feasibility Dec 2023 | $360M | 23.8% | $420M | 14.2 yrs | 1.5 USD/lb Cu |
| 274 | Casa Berardi Mine Hecla Mining Company (HL) | Gold | Feasibility Feb 2024 | $356M | — | — | 14 yrs | — |
| 275 | Los Ricos South GoGold Resources Inc. (GGD.TO) | Silver | Feasibility Jan 2025 | $355M | 28% | $227M | 15 yrs | 12.3 USD/oz AgEq |
| 276 | Cerro Las Minitas (CLM) Southern Silver Exploration Corp. (SSV.V) | Silver | PEA Aug 2022 | $349M | 17.9% | $341M | 15 yrs | 13.3 USD/oz AgEq |
| 277 | Molo Graphite Mine NextSource Materials Inc. (NEXT.TO) | Graphite | Feasibility Mar 2025 | $348M | 17.5% | $291M | 34 yrs | — |
| 278 | Asanko Gold Mine Galiano Gold Inc. (GAU.TO) | Gold | Feasibility Mar 2023 | $343M | — | $58M | 8.5 yrs | 1,143 USD/oz |
| 279 | Raleigh Lake Project (Zone 1) ILC Critical Minerals Corp. (ILC.V) | Lithium | PEA Dec 2023 | C$343M | 44.3% | C$112M | 9 yrs | 993 CAD/t SC6 |
| 280 | Raleigh Lake ILC Critical Minerals Corp. (ILC.V) | Lithium, Rubidium | PEA Dec 2023 | C$342M | 44.3% | C$112M | 9 yrs | 993 CAD/t SC6 |
| 281 | Goliath Gold Complex NexGold Mining Corp. (NEXG.V) | Gold | Pre-Feasibility Mar 2023 | C$336M | 25.4% | C$335M | 13 yrs | 1,072 USD/oz |
| 282 | Carmacks Cascadia Minerals Ltd. (CAM.V) | Copper-Gold | PEA Nov 2022 | C$330M | 38% | C$220M | 9 yrs | — |
| 283 | La Negra Mine Silverco Mining Inc. (SICO.V) | Silver | PEA Sep 2026 | $329M | 131% | $21M | 8.2 yrs | 24.9 USD/oz AgEq |
| 284 | Goldboro Gold Project NexGold Mining Corp. (NEXG.V) | Gold | Feasibility Jan 2022 | C$328M | 25.5% | C$271M | 10.9 yrs | 849 USD/oz |
| 285 | Zancudo⚑ Denarius Metals Corp. (DMET) | Au, Ag | PEA Mar 2026 | $324M | 558.5% | $11M | 11 yrs | 2,482 USD/oz |
| 286 | Madsen⚑ Star Royalties Ltd. (STRR.V) | Gold | Pre-Feasibility 2025 | C$315M | 255% | C$44M | 6 yrs | 1,681 USD/oz |
| 287 | Cusi Mine - Upside Case Silverco Mining Inc. (SICO.V) | Silver | PEA Apr 2026 | $312M | 186.9% | — | — | — |
| 288 | Hugo North Extension Lift 2 (2021 PEA) Entrée Resources Ltd. (ETG.TO) | Copper, Gold, Silver | PEA Oct 2021 | $306M | — | — | — | — |
| 289 | Entrée/Oyu Tolgoi JV Property (Hugo North Extension Lift 2) Entrée Resources Ltd. (ETG.TO) | Copper, Gold, Silver | PEA Oct 2021 | $306M | — | — | 22 yrs | 0.9 USD/lb payable Cu |
| 290 | Mercur Gold Project Revival Gold Inc. (RVG.V) | Gold | PEA May 2025 | $295M | — | $208M | — | 1,385 USD/oz |
| 291 | Eagle Mountain Gold Project Mako Mining Corp. (MKO.V) | Gold | PEA Mar 2024 | $292M | 57% | — | 15 yrs | 829 USD/oz |
| 292 | Galaxy Gold Mine Golconda Gold Ltd. (GG.V) | Gold | Production | $288M | — | — | 20 yrs | — |
| 293 | Goldfields Fortune Bay Corp. (FOR.V) | Gold | PEA Nov 2022 | C$285M | 35.2% | C$234M | 8.3 yrs | 889 USD/oz Au |
| 294 | Grey Fox McEwen Mining Inc. (MUX.TO) | Gold | Pre-Feasibility Mar 2026 | $282M | 24.8% | $177M | — | — |
| 295 | Minera Valle Central (MVC) - Cauquenes Expansion Project Amerigo Resources Ltd. (ARG.TO) | Copper | Feasibility Jan 2014 | $279M | — | $140M | — | — |
| 296 | Samapleu and Grata Deposits Sama Resources Inc. (SME.V) | Nickel, Copper | PEA May 2024 | $277M | 21.9% | $338M | 16.1 yrs | 4.1 USD/lb [Cu+Ni] payable |
| 297 | Cove Underground i-80 Gold Corp. (IAU.TO) | Gold | PEA Mar 2025 | $271M | 30% | — | — | — |
| 298 | Hibbing Taconite (HibTac) Cleveland-Cliffs Inc. (CLF) | Iron ore (taconite pellets) | Resource Estimate Dec 2021 | $269M | — | — | 5 yrs | — |
| 299 | Hibbing Taconite Property (HibTac) Cleveland-Cliffs Inc. (CLF) | Iron Ore (taconite pellets) | Production Feb 2022 | $269M | — | — | 5 yrs | — |
| 300 | Mexican Hat Gold Project GMV Minerals Inc. (GMV.V) | Gold | PEA Sep 2025 | $268M | 50.2% | $90M | 10 yrs | 1,545 USD/oz |
| 301 | Samapleu-Grata Sama Resources Inc. (SME.V) | Nickel, Copper, PGE | PEA Mar 2024 | $257M | 22.3% | $338M | 16.1 yrs | 4 USD/lb Ni and Cu |
| 302 | Churchrock-Crownpoint (Churchrock/Crownpoint) Laramide Resources Ltd. (LAM.TO) | Uranium (U3O8) | PEA Jan 2024 | $249M | 56% | $48M | 31 yrs | 34.8 USD/lb |
| 303 | Woxna Graphite Project (Kringel deposit) Leading Edge Materials Corp. (LEM.V) | Graphite | PEA 2021 | $248M | 37.4% | $121M | — | — |
| 304 | Lost Creek Ur-Energy Inc. (URE.TO) | Uranium | Production Mar 2026 | $244M | 65.7% | — | 13 yrs | 40.2 USD/lb |
| 305 | La Colorada Mine Heliostar Metals Ltd. (HSTR.V) | Gold | Production 2026 | $243M | 168.4% | $45M | 6 yrs | — |
| 306 | Altan Tsagaan Ovoo Project (ATO) Steppe Gold Ltd. (STGO.TO) | Gold | Feasibility Aug 2022 | $242M | — | $129M | 14 yrs | — |
| 307 | Churchrock–Crownpoint (Crownpoint-Churchrock) Laramide Resources Ltd. (LAM.TO) | Uranium | PEA Jan 2024 | $239M | 56% | $48M | 32 yrs | 34.8 USD/lb |
| 308 | Matawinie Graphite Mine Nouveau Monde Graphite Inc. (NOU.TO) | Graphite | Feasibility Nov 2025 | C$238M | 15.8% | C$421M | 25 yrs | — |
| 309 | Carmacks (Base Case) Cascadia Minerals Ltd. (CAM.V) | Copper-Gold | PEA Nov 2022 | C$231M | 29% | — | 9 yrs | — |
| 310 | Copperstone Star Royalties Ltd. (STRR.V) | Gold | PEA 2025 | $227M | 170.9% | $36M | 6 yrs | 1,259 USD/oz |
| 311 | Johnson Tract Project Contango ORE Inc. (CTGO) | Gold (polymetallic: Au, Zn, Cu, Ag, Pb) | PEA May 2025 | $225M | 30.2% | $214M | 12 yrs | — |
| 312 | Cerro Caliche Gold Project Sonoro Gold Corp. (SGO.V) | Gold | PEA Apr 2026 | $224M | 50% | $83M | 10 yrs | 1,902 USD/oz |
| 313 | Juruti Bauxite Mine Alcoa Corporation (AA) | Bauxite | Feasibility Feb 2022 | $224M | — | — | 11 yrs | — |
| 314 | Scottie Gold Mine (Blueberry Contact Zone) Scottie Resources Corp. (SCOT.V) | Gold | PEA Oct 2025 | C$216M | 60.3% | C$129M | 7 yrs | — |
| 315 | Back Forty Gold Resource Corporation (GORO) | Gold | PEA Oct 2023 | $214M | 25.7% | $325M | 9 yrs | 920 USD/oz |
| 316 | Estrades Galway Metals Inc. (GWM.V) | Polymetallic (Cu, Pb, Zn, Au, Ag) | PEA Feb 2026 | C$212M | 33% | C$117M | 8 yrs | 1,987 USD/oz AuEq paid |
| 317 | Doby George Western Exploration Inc. (WEX.V) | Gold | PEA May 2025 | $211M | 62.2% | $115M | 4.2 yrs | 1,197 USD/oz |
| 318 | Fenix Gold Rio2 Limited (RIO.TO) | Gold | Feasibility Oct 2023 | $210M | 28.5% | $117M | 17 yrs | 1,237.1 USD/oz |
| 319 | Zancudo⚑ Star Royalties Ltd. (STRR.V) | Gold | PEA Dec 2025 | $206M | 287% | $15M | 10.3 yrs | 1,059 USD/oz |
| 320 | Metals and Alloys Aclara Resources Inc. (ARA.TO) | Rare Earth Metals and Alloys (NdPr, FeDy, Tb, NdFeB) | Pre-Feasibility Apr 2026 | $203M | 25% | $149M | — | — |
| 321 | Sandman Borealis Mining Company Ltd. (BOGO.V) | Gold | PEA 2026 | $203M | 105% | $36M | 9 yrs | 1,823 USD/oz |
| 322 | Aclara Metals (Metals and Alloys Project) Aclara Resources Inc. (ARA.TO) | Rare Earth Metals and Alloys (NdPr, FeDy, Tb, NdFeB) | Scoping Study Sep 2026 | $203M | 25% | $149M | — | — |
| 323 | Metals and Alloys Project (Aclara Metals) Aclara Resources Inc. (ARA.TO) | Rare Earth Metals & Alloys | PEA | $203M | 25% | $149M | — | — |
| 324 | Romero Project Goldquest Mining Corp. (GQC.V) | Gold | Pre-Feasibility Sep 2016 | $203M | 28.2% | $159M | 8 yrs | 595 USD/oz Au |
| 325 | Nyanzaga Gold Project Perseus Mining Limited (PRU.TO) | Gold | Feasibility Feb 2026 | $202M | 19% | $483M | 16 yrs | 1,650 USD/oz |
| 326 | Crocodile River Mine (CRM) Eastern Platinum Limited (ELR.TO) | PGM (Platinum Group Metals) | Feasibility 2022 | $202M | 118% | $68M | 22 yrs | 1,502 USD/oz 4E |
| 327 | Mantoverde Pyrite Augmentation Capstone Copper Corp. (CS.TO) | Copper | — | $200M | — | $45M | — | — |
| 328 | Velvet-Wood & Slick Rock (Combined PEA) Anfield Energy Inc. (AEC.V) | Uranium & Vanadium | PEA May 2023 | $197M | 33% | $112M | 15 yrs | — |
| 329 | Crean Hill Project Magna Mining Inc. (NICU.V) | Nickel, Copper, PGM | PEA Jul 2024 | C$194M | 129% | — | — | — |
| 330 | Zonia World Copper Ltd. (WCU.V) | Copper | PEA Mar 2018 | $192M | 29% | — | 8.6 yrs | — |
| 331 | San Gabriel Project Compania de Minas Buenaventura S.A.A. (BVN) | Gold | Feasibility Apr 2025 | $191M | 21.8% | $177M | 14.2 yrs | 1,568 US$/oz Au |
| 332 | Coosa Graphite Project Westwater Resources Inc. (WWR) | Graphite | PEA Dec 2023 | $190M | 24.2% | $152M | 22 yrs | — |
| 333 | Oyu Tolgoi – Hugo North Extension (HNE) Lift 1 Entrée Resources Ltd. (ETG.TO) | Copper-Gold | Feasibility May 2021 | $185M | — | $55M | 17 yrs | 1.3 USD/lb payable copper |
| 334 | Summit Mine Golconda Gold Ltd. (GG.V) | Silver/Gold | PEA Feb 2026 | $182M | — | — | 7 yrs | — |
| 335 | Summit Gold and Silver Mine Golconda Gold Ltd. (GG.V) | Gold, Silver | PEA Sep 2014 | $177M | — | — | 6 yrs | — |
| 336 | Nueva Recuperada / Tangana Project Silver X Mining Corp. (AGX.V) | Silver | PEA Apr 2023 | $175M | 39% | — | — | 26.9 USD/oz Ag Eq |
| 337 | Fox Complex Expansion (IA Mine Plan) McEwen Mining Inc. (MUX.TO) | Gold | PEA Dec 2021 | $175M | — | $438M | 12.3 yrs | 1,223.5 USD/oz |
| 338 | Scotia Mine (EDM Resources) Fancamp Exploration Ltd. (FNC.V) | Zinc | Pre-Feasibility 2021 | C$174M | 69% | C$31M | 14 yrs | — |
| 339 | Caribou Complex / Murray Brook Deposit Puma Exploration Inc. (PUMA.V) | Copper | PEA 2025 | C$171M | 36% | — | — | — |
| 340 | Bayan Khundii Gold Project (BK & Dark Horse Mane) Erdene Resource Development Corp. (ERD.TO) | Gold | Feasibility Aug 2023 | $170M | 35.3% | $100M | 8.5 yrs | — |
| 341 | Murray Brook Project Canadian Copper Inc. (CCI.CN) | Copper, Zinc, Lead, Silver | PEA Jul 2025 | C$169M | 35.4% | C$64M | 13.2 yrs | 3.2 USD/lb CuEq |
| 342 | Copperwood Highland Copper Company Inc. (HI.V) | Copper | Feasibility 2023 | $168M | 18% | $391M | 11 yrs | 2 USD/lb |
| 343 | Tahuehueto Luca Mining Corp. (LUCA.V) | Gold-Silver-Lead-Zinc-Copper | Pre-Feasibility Apr 2022 | $161M | 65.5% | — | 10.9 yrs | — |
| 344 | Thunder Bay North Project (Current & Escape Deposits) Clean Air Metals Inc. (AIR.V) | PGE-Ni-Cu (Platinum, Palladium, Nickel, Copper) | PEA Nov 2025 | C$158M | 32% | C$90M | 11 yrs | — |
| 345 | Tantahuatay Compania de Minas Buenaventura S.A.A. (BVN) | Gold | Resource Estimate Dec 2021 | $157M | — | — | 6 yrs | — |
| 346 | Mesteña Grande Uranium Project enCore Energy Corp. (EU.V) | Uranium | PEA Feb 2025 | $154M | — | $108M | — | 25.5 USD/lb U3O8 |
| 347 | Boroo Steppe Gold Ltd. (STGO.TO) | Gold | Feasibility Feb 2024 | $152M | — | — | 8 yrs | — |
| 348 | Cerro de Oro Project Minera Alamos Inc. (MAI.V) | Gold | PEA Jan 2023 | $151M | — | $28M | 8.2 yrs | 873 USD/oz |
| 349 | Van Dyke Copper Project Copper Fox Metals Inc. (CUU.V) | Copper | Resource Estimate Jan 2020 | $150M | 27.9% | $291M | 11 yrs | 1.1 USD/lb |
| 350 | Lagoa Salgada Cerrado Gold Inc. (CERT.V) | Zinc (VMS - Zn, Cu, Pb, Sn, Au, Ag) | Feasibility Jul 2023 | $147M | 39% | — | — | 0.8 USD/lb ZnEq |
| 351 | Nickel Shäw Ni-Cu-PGM Project Nickel Creek Platinum Corp. (NCP.V) | Nickel, Copper, PGM (Platinum, Palladium) | Pre-Feasibility Oct 2023 | C$143M | 5.8% | C$1.69B | 19.1 yrs | — |
| 352 | Gas Hills Project enCore Energy Corp. (EU.V) | Uranium | PEA Feb 2025 | $142M | 50.2% | $55M | 11 yrs | — |
| 353 | River Valley Palladium Project New Age Metals Inc. (NAM.V) | Palladium | PEA 2023 | $140M | 11% | $269M | 16 yrs | — |
| 354 | River Valley Project New Age Metals Inc. (NAM.V) | Palladium (Pd), Platinum (Pt), Gold (Au) | PEA Jun 2023 | C$140M | 11.3% | C$269M | 16 yrs | 1,518 USD/oz PdEq |
| 355 | South Deep Gold Mine Gold Fields Limited (GFI) | Gold | Feasibility Mar 2025 | $139M | — | — | 85 yrs | — |
| 356 | Waihi District OceanaGold Corporation (OGC.TO) | Gold | Pre-Feasibility Dec 2024 | $138M | 9.2% | $556M | 15 yrs | 994 USD/oz |
| 357 | Fox Complex Expansion Case (Stock West, Grey Fox, Fuller) McEwen Mining Inc. (MUX.TO) | Gold | PEA Dec 2021 | $137M | 21% | — | 9.3 yrs | 1,246 USD/oz |
| 358 | Puna Operations (Chinchillas) SSR Mining Inc. (SSRM) | Silver (with lead and zinc) | Feasibility Feb 2024 | $136M | — | — | 2.5 yrs | 15.9 USD/oz Ag |
| 359 | Puna Operations (Chinchillas and Pirquitas) SSR Mining Inc. (SSRM.TO) | Silver | Production Dec 2023 | $136M | — | — | 2.5 yrs | 15.9 USD/oz Ag |
| 360 | Puna Operations (Chinchillas & Pirquitas) SSR Mining Inc. (SSRM.TO) | Silver | Feasibility Dec 2023 | $136M | — | — | 2.5 yrs | 15.9 USD/oz Ag |
| 361 | Empire Mine ExGen Resources Inc. (EXG.V) | Copper, Gold, Silver | Pre-Feasibility Sep 2024 | $132M | 40.2% | — | 8 yrs | — |
| 362 | Otjikoto Mine – Antelope Deposit B2Gold Corp. (BTO.TO) | Gold | PEA Feb 2025 | $131M | 35% | $129M | 5 yrs | 1,095 USD/oz |
| 363 | Entrée/Oyu Tolgoi Joint Venture Project – Hugo North Extension Lift 1 Entrée Resources Ltd. (ETG.TO) | Copper-Gold | Feasibility Oct 2021 | $131M | — | — | — | 1.3 USD/lb payable Cu |
| 364 | Archimedes Underground (Ruby Hill) i-80 Gold Corp. (IAU.TO) | Gold | PEA Mar 2025 | $127M | 23% | $49M | 10 yrs | 1,893 USD/oz |
| 365 | Black Butte Copper Project Sandfire Resources America Inc. (SFR.V) | Copper | Pre-Feasibility Jul 2026 | $126M | 13.3% | $474M | 12 yrs | 3 USD/lb |
| 366 | Fox Complex Expansion (IA Mine Plan Excluding Inferred Mineral Resources) McEwen Mining Inc. (MUX.TO) | Gold | PEA Dec 2021 | $126M | — | $359M | 9.1 yrs | 1,223.6 USD/oz |
| 367 | Kindersley Lithium Project Grounded Lithium Corp. (GRD.V) | Lithium | Pre-Feasibility Oct 2026 | C$125M | 10.8% | C$603M | — | 8,581 C$/tonne LCE (unit OPEX) |
| 368 | Pegmont Vendetta Mining Corp. (VTT.V) | Lead-Zinc-Silver | PEA Jul 2018 | A$124M | 24% | A$170M | — | 0.7 A$/lb payable lead |
| 369 | Rozino Velocity Minerals Ltd. (VLC.V) | Gold | Pre-Feasibility Dec 2021 | $123M | 27.4% | $87M | 7 yrs | 755 USD/oz |
| 370 | Huasco Water Asset Hot Chili Limited (HCH.V) | Water | Pre-Feasibility May 2026 | $122M | 19% | $151M | — | — |
| 371 | Tuvatu Gold Project Lion One Metals Limited (LIO.V) | Gold | PEA Apr 2022 | $122M | 50.9% | $67M | 5 yrs | — |
| 372 | Darling Range (Willowdale) Bauxite Mine Alcoa Corporation (AA) | Bauxite | Feasibility Feb 2024 | $122M | — | — | 9 yrs | — |
| 373 | Puquios Camino Minerals Corporation (COR.V) | Copper | Pre-Feasibility 2025 | $118M | 23.4% | $142M | 14.2 yrs | 1.7 USD/lb Cu |
| 374 | Granite Creek Underground i-80 Gold Corp. (IAU.TO) | Gold | Feasibility Sep 2026 | $118M | — | — | 8.5 yrs | 1,915 USD/oz |
| 375 | Caber Complex (Caber, Caber Nord, PD1) Nuvau Minerals Corp. (NMC.V) | Zinc (ZnEq) | PEA Jul 2023 | $116M | 20% | $172M | — | — |
| 376 | Caber Complex Nuvau Minerals Corp. (NMC.V) | Copper-Zinc (base metals) | PEA Jul 2023 | C$116M | 20% | — | 9.5 yrs | 1.3 USD/lb Cu |
| 377 | Don David Gold Mine (Arista Mine) Gold Resource Corporation (GORO) | Gold, Silver, Copper, Lead, Zinc | Feasibility Dec 2021 | $114M | — | $75M | 6 yrs | 88 USD/t |
| 378 | Tonopah Gold Project Viva Gold Corp. (VAU.V) | Gold | PEA Aug 2025 | $112M | 17.6% | $220M | 7 yrs | 1,269 USD/oz |
| 379 | Minera Don Nicolas Cerrado Gold Inc. (CERT.V) | Gold | PEA Sep 2024 | $111M | — | $0M | 5 yrs | 1,146 USD/oz |
| 380 | Bunker Hill Mine - PEA Summary Bunker Hill Mining Corp. (BNKR.V) | Lead, Silver, Zinc | PEA Jan 2022 | $108M | 35.2% | — | — | — |
| 381 | Beartrack-Arnett Heap Leach Project Revival Gold Inc. (RVG.V) | Gold | Pre-Feasibility Jun 2023 | $105M | 24.3% | $109M | 8.1 yrs | 1,235 USD/oz |
| 382 | Dyke #5 – Sirmac Property⚑ Vision Lithium Inc. (VLI.V) | Lithium (spodumene) | PEA Jan 2023 | C$105M | 483.7% | C$3M | 4 yrs | — |
| 383 | Cusi Mine Silverco Mining Inc. (SICO.V) | Silver | PEA Apr 2026 | $104M | 94.8% | $19M | 9 yrs | 26.8 USD/oz AgEq |
| 384 | Soledad Mountain Andean Precious Metals Corp. (APM.TO) | Gold | Feasibility Jan 2024 | $102M | — | — | 5 yrs | — |
| 385 | Fox Complex Expansion Case Excluding Inferred Mineral Resources McEwen Mining Inc. (MUX.TO) | Gold | PEA Dec 2021 | $100M | 31.4% | — | 6.1 yrs | 1,238 USD/oz |
| 386 | Black Butte Copper Project - Johnny Lee Deposit Sandfire Resources America Inc. (SFR.V) | Copper | Pre-Feasibility Dec 2025 | $99M | 11.3% | $474M | 8 yrs | 2.8 USD/lb |
| 387 | Seabee Gold Operation SSR Mining Inc. (SSRM) | Gold | Production Feb 2024 | $95M | — | — | 4.2 yrs | 2,231 USD/oz |
| 388 | Seabee Gold Operation (Santoy Mine & Porky West) SSR Mining Inc. (SSRM) | Gold | Feasibility Feb 2024 | $95M | — | — | 4.2 yrs | — |
| 389 | Seabee Gold Operation (Santoy Mine and Porky West) SSR Mining Inc. (SSRM) | Gold | Production Feb 2024 | $95M | — | — | 4.2 yrs | — |
| 390 | La Plata VMS Project Atico Mining Corporation (ATY.V) | Copper-Gold-Zinc-Silver | Feasibility Aug 2024 | $93M | 25% | $91M | 8.1 yrs | 1.7 USD/lb Cu Eq. |
| 391 | Velardeña Project⚑ Golden Minerals Company (AUMN) | Silver-Gold-Lead-Zinc (polymetallic) | PEA Aug 2023 | $88M | 860.7% | $7M | 10.5 yrs | — |
| 392 | San Jose de Gracia Mine DynaResource Inc. (DYNR) | Gold | Feasibility Mar 2025 | $84M | — | — | 7 yrs | 1,720 USD/oz AuEq |
| 393 | Cebolleta Uranium Project Premier American Uranium Inc. (PUR.V) | Uranium (U3O8) | PEA May 2025 | $84M | 17.7% | $113M | 13 yrs | — |
| 394 | Shirley Basin Ur-Energy Inc. (URE.TO) | Uranium | Production Mar 2026 | $83M | 69% | — | 9 yrs | 50 USD/lb |
| 395 | Empire State Mines (ESM) - Underground Titan Mining Corp. (TI.TO) | Zinc | PEA Jan 2025 | $83M | — | $27M | 9 yrs | — |
| 396 | Empire State Mines Titan Mining Corp. (TI.TO) | Zinc | PEA 2021 | $81M | — | $11M | 7 yrs | — |
| 397 | Cuiú Cuiú - Stage 1 Gold-in-Oxide Heap Leach Cabral Gold Inc. (CBR.V) | Gold | Pre-Feasibility Jul 2025 | $74M | 78% | $38M | 6.2 yrs | 1,210 USD/oz |
| 398 | Cuiú Cuiú Gold District Cabral Gold Inc. (CBR.V) | Gold | Pre-Feasibility Jul 2025 | $74M | 77.8% | $38M | 6.2 yrs | 1,209.9 USD/oz Au |
| 399 | Minorca Property (Minorca Mine) Cleveland-Cliffs Inc. (CLF) | Iron Ore (Magnetite / Iron Ore Pellets) | Feasibility Feb 2022 | $70M | — | $210M | 14 yrs | — |
| 400 | La Fortuna Minera Alamos Inc. (MAI.V) | Gold | PEA Jul 2018 | $70M | 93% | $27M | 5 yrs | 440 USD/oz |
| 401 | Okanjande Graphite Project Northern Graphite Corporation (NGC.V) | Graphite | PEA Jan 2022 | $65M | 62% | $15M | 10 yrs | 775.2 USD/t concentrate |
| 402 | Oxide Tailings Project Avino Silver & Gold Mines Ltd. (ASM.TO) | Silver | Pre-Feasibility Feb 2024 | $61M | 26% | $49M | 9 yrs | — |
| 403 | Senegal Mali Shear Zone (SMSZ) Project Desert Gold Ventures Inc. (DAU.V) | Gold | PEA Jan 2026 | $61M | 57% | $20M | 10 yrs | 1,137 USD/oz |
| 404 | Taguas Project (Cerro Taguas Oxides) Orvana Minerals Corp. (ORV.TO) | Gold | PEA Dec 2021 | $57M | 20.2% | $141M | 9.2 yrs | — |
| 405 | Mato Bula Deposit East Africa Metals Inc. (EAM.V) | Gold, Copper, Silver | PEA May 2016 | $57M | 28.4% | $54M | 8 yrs | — |
| 406 | El Bagre Gold Mining Complex (Cordero Mine) Soma Gold Corp. (SOMA.V) | Gold | PEA Jan 2023 | C$56M | — | — | 3.2 yrs | 1,418 C$/oz |
| 407 | Darling Range Bauxite Operations (Huntly & Willowdale) Alcoa Corporation (AA) | Bauxite | Feasibility Dec 2025 | $55M | — | — | 9 yrs | — |
| 408 | El Pilar Southern Copper Corporation (SCCO) | Copper | Feasibility Feb 2022 | $54M | 9.9% | $365M | 16 yrs | 1.8 USD/lb Cu |
| 409 | Sissingué Gold Project Perseus Mining Limited (PRU.TO) | Gold | Feasibility May 2015 | $53M | 27% | $106M | 5.3 yrs | 632 USD/oz |
| 410 | Velardeña Project – MI Scenario⚑ Golden Minerals Company (AUMN) | Silver-Gold-Lead-Zinc (polymetallic) | PEA Aug 2023 | $52M | 1,266.8% | $5M | 4.5 yrs | — |
| 411 | Alta Mesa Uranium Project enCore Energy Corp. (EU.V) | Uranium | Production Feb 2025 | $52M | — | $26M | — | 27.4 USD/lb U3O8 |
| 412 | Foxtrot Project Search Minerals Inc. (SMY.V) | Rare Earth Elements (REE) | PEA Apr 2016 | C$48M | 17% | C$152M | 14 yrs | — |
| 413 | Velardeña Project (MI Plan) Golden Minerals Company (AUMN) | Silver-Gold-Lead-Zinc (polymetallic) | PEA Mar 2022 | $48M | 101% | $18M | 4 yrs | — |
| 414 | Tahuehueto Mine Empress Royalty Corp. (EMPR.V) | Silver | Production Sep 2026 | $44M | — | $5M | — | — |
| 415 | Lone Mountain Minaurum Silver Inc. (MGG.V) | Zinc | PEA Jun 2019 | $43M | 35% | — | — | — |
| 416 | Auld Creek (Reefton Project) Rua Gold Inc. (RUA.V) | Gold & Antimony | PEA Jun 2026 | $42M | 17% | $133M | 5.5 yrs | 1,850 USD/oz |
| 417 | Auld Creek (Reefton Goldfield) Rua Gold Inc. (RUA.V) | Gold, Antimony | PEA Jun 2026 | $42M | 17% | $133M | 5.5 yrs | 1,835 USD/oz |
| 418 | Auld Creek Gold-Antimony Project Rua Gold Inc. (RUA.V) | Gold, Antimony | PEA Jun 2026 | $42M | 17% | $226M | — | 1,835 USD/oz |
| 419 | Tambomayo Compania de Minas Buenaventura S.A.A. (BVN) | Gold & Silver | Pre-Feasibility May 2022 | $41M | — | $17M | 3 yrs | — |
| 420 | PL Gold Mine (PL Mine) Minnova Corp. (MCI.V) | Gold | Feasibility 2017 | $37M | 53% | — | 5 yrs | — |
| 421 | PL Gold Mine Minnova Corp. (MCI.V) | Gold | Feasibility Nov 2017 | C$37M | 53% | C$35M | 5 yrs | 942 USD/oz |
| 422 | San Agustin Mine⚑ Heliostar Metals Ltd. (HSTR.V) | Gold | Production 2026 | $35M | 548% | $40M | 1.2 yrs | 2,150 USD/oz Au |
| 423 | Uchucchacua Compania de Minas Buenaventura S.A.A. (BVN) | Silver | Feasibility May 2022 | $35M | — | — | 5 yrs | — |
| 424 | Kinsley Mountain Gold Project CopAur Minerals Inc. (CPAU.V) | Gold | PEA Jul 2026 | $35M | 19.7% | $82M | 4 yrs | 1,861 USD/oz |
| 425 | Igor Project (Callanquitas Mine) PPX Mining Corp. (PPX.V) | Gold-Silver | Pre-Feasibility Jan 2022 | $30M | 59% | $7M | — | — |
| 426 | Sierra Antapite Mine Empress Royalty Corp. (EMPR.V) | Gold | Production Sep 2026 | $28M | — | $10M | — | — |
| 427 | Montauban Gold-Silver Project ESGold Corp. (ESAU.CN) | Gold-Silver | PEA May 2025 | C$24M | 60.3% | C$19M | 4 yrs | — |
| 428 | SMSZ Project Desert Gold Ventures Inc. (DAU.V) | Gold | PEA Aug 2025 | $24M | 34% | $4M | — | 1,352 USD/oz |
| 429 | Eagle Mine Talon Metals Corp. (TLO.TO) | Nickel, Copper | Production Jun 2026 | $19M | — | — | — | 8.1 USD/lb |
| 430 | Galaxy Mine Empress Royalty Corp. (EMPR.V) | Gold | Production Sep 2026 | $15M | — | $5M | — | — |
| 431 | Terakimti Oxide Deposit, Harvest Project East Africa Metals Inc. (EAM.V) | Gold | PEA Oct 2015 | $13M | 30.1% | $17M | 4 yrs | — |
| 432 | Da Tambuk East Africa Metals Inc. (EAM.V) | Gold | PEA Apr 2018 | $13M | 28.6% | $34M | — | — |
| 433 | San Agustin Mine (PEA case from Technical Report Highlights) Heliostar Metals Ltd. (HSTR.V) | Gold | Feasibility Nov 2024 | $12M | 156% | $40M | — | 1,990 USD/GEO |
| 434 | Manica Mine Empress Royalty Corp. (EMPR.V) | Gold | Production Sep 2026 | $7M | — | $3M | — | — |
| 435 | East Kemptville Tin Project Avalon Advanced Materials Inc. (AVL.TO) | Tin | PEA Jun 2018 | C$6M | 10.6% | C$32M | 19 yrs | — |
| 436 | Coimolache Mine Compania de Minas Buenaventura S.A.A. (BVN) | Gold, Silver | Feasibility Feb 2024 | $5M | — | — | 5 yrs | — |
| 437 | Crawford Canada Nickel Company Inc. (CNC.V) | Nickel | Feasibility 2025 | $3M | 17.6% | $2.00B | 41 yrs | 1.5 USD/lb |
| 438 | Gowganda (Kilborn 1987 Feasibility Study) Nord Precious Metals Mining Inc. (NTH.V) | Silver | Feasibility 1987 | C$2M | 49.3% | C$5M | 7 yrs | — |
| 439 | Kay Mine Project Arizona Metals Corp. (AMC.TO) | Copper-Gold-Zinc | PEA Apr 2026 | $-6M | 4.9% | $609M | 10 yrs | 138.5 USD/t milled |
| 440 | Orcopampa Compania de Minas Buenaventura S.A.A. (BVN) | Gold | Feasibility May 2022 | $-30M | — | — | 3 yrs | 1,242 USD/oz Au |
| 441 | Imeq (Hydro Project) Amaroq Minerals Ltd. (AMRQ.V) | Energy | Pre-Feasibility 2025 | — | — | C$10M | — | — |
| 442 | Oyu Tolgoi Rio Tinto (RIO) | Copper | Feasibility Dec 2022 | — | — | $7.36B | — | — |
| 443 | Highland Valley Copper (HVC) Mine Life Extension Teck Resources Limited (TECK) | Copper | — | — | — | C$2.10B | — | — |
| 444 | Mupani Mine Impala Platinum Holdings (IMPUY) | PGM (6E) | — Mar 2026 | — | — | $386M | — | — |
| 445 | 11C Shaft Impala Platinum Holdings (IMPUY) | PGM (6E) | — Mar 2026 | — | — | ZAR 221M | — | — |
| 446 | Zimplats Smelter Impala Platinum Holdings (IMPUY) | PGM | — | — | — | $544M | — | — |
| 447 | Zimplats Solar Plant Impala Platinum Holdings (IMPUY) | PGM (6E) | — Mar 2026 | — | — | $91M | — | — |
| 448 | Impala Refineries Final Metals Facility Impala Platinum Holdings (IMPUY) | PGM | — | — | — | ZAR 899M | — | — |
| 449 | Vicuña District (Josemaria & Filo del Sol) Lundin Mining Corporation (LUN.TO) | Copper | PEA Feb 2026 | — | 14.8% | $7.10B | 70 yrs | 0.5 USD/lb Cu |
| 450 | Kemess Centerra Gold Inc. (CG.TO) | Gold, Copper | PEA Jul 2026 | — | — | $771M | 15 yrs | 971 USD/oz |
| 451 | Rare Element Resources Demonstration Plant (Wyoming) Rare Element Resources Ltd. (REEMF) | NdPr Oxide, Heavy REE (HREE) concentrate | — | — | — | $66M | — | — |
| 452 | HyProMag GmbH (Germany) Mkango Resources Ltd. (MKA.V) | Rare Earth Magnets (Recycling) | — | — | — | €6M | — | — |
| 453 | Songwe Hill Rare Earths Project Mkango Resources Ltd. (MKA.V) | Rare Earth Elements | Feasibility Apr 2026 | — | — | $5M | — | — |
| 454 | Dewey Burdock Project enCore Energy Corp. (EU.V) | Uranium | S-K 1300 Technical Report Summary | — | — | $264M | — | — |
| 455 | Mantoverde Capstone Copper Corp. (CS.TO) | Copper | Production Jul 2024 | — | — | $176M | — | — |
| 456 | Santo Domingo Capstone Copper Corp. (CS.TO) | Copper | Feasibility Jul 2024 | — | 24% | — | — | — |
| 457 | Placentia Bay Oil Refinery Altius Minerals Corporation (ALS.TO) | Oil / Refined Petroleum Products | Feasibility Dec 2006 | — | 15% | $4.60B | — | — |
| 458 | Bayan Khundii Erdene Resource Development Corp. (ERD.TO) | Gold | Feasibility 2023 | — | — | $115M | 6 yrs | — |
| 459 | Springer Blue Moon Metals Inc. (MOON.V) | Tungsten | — | — | — | $50M | — | — |
| 460 | Johnson Camp Mine Gunnison Copper Corp. (GCU.TO) | Copper | — | — | — | $143M | — | — |
| 461 | Cotabambas Panoro Minerals Ltd. (PML.V) | Copper-Gold (Cu/Au) | — | — | — | $600M | — | — |
| 462 | Florália High Purity Iron Max Resource Corp. (MAX.V) | Iron | — | — | — | $10M | — | — |
| 463 | Morocco CSPG Anode Plant (Jorf Lasfar) Falcon Energy Materials Inc. (FLCN.V) | CSPG (Coated Spheronized Purified Graphite) | PEA Oct 2025 | — | — | $86M | — | 3,168 USD/t |
| 464 | Okanjande Northern Graphite Corporation (NGC.V) | Graphite | — May 2026 | — | — | $35M | — | — |
| 465 | Bissett Creek Northern Graphite Corporation (NGC.V) | Graphite | Feasibility | — | — | $115M | — | — |
| 466 | Yanbu BAM Plant (KSA JV) Northern Graphite Corporation (NGC.V) | Graphite (Battery Anode Material) | — | — | — | $200M | — | — |
| 467 | France BAM Plant Northern Graphite Corporation (NGC.V) | Graphite (Battery Anode Material) | — | — | — | €159M | — | — |
| 468 | Tulkubash Silvercorp Metals Inc. (SVM.TO) | Gold | Feasibility Jul 2026 | — | — | $166M | 3.5 yrs | — |
| 469 | PPX Mining Igor 4 Silver Crown Royalties Inc. (SCRI.V) | Silver (byproduct of gold/silver polymetallic) | — | — | 50% | $3M | — | — |
| 470 | EDM Resources Scotia Mine Silver Crown Royalties Inc. (SCRI.V) | Silver | — | — | 25% | C$1M | — | — |
| 471 | BacTech Environmental Ecuador Plant Silver Crown Royalties Inc. (SCRI.V) | Silver (reprocessing tailings) | — | — | 21% | C$1M | — | — |
| 472 | Limousine Butte NevGold Corp. (NAU.V) | Antimony-Gold | Resource Estimate Jul 2026 | — | — | $50M | — | — |
| 473 | Paca Apuradita Silver Elephant Mining Corp. (ELEF.TO) | Silver | — | — | — | $0M | — | — |
| 474 | Electra Cobalt Sulfate Refinery Electra Battery Materials Corporation (ELBM.V) | Cobalt (as cobalt sulfate) | Feasibility Jul 2026 | — | — | $73M | — | — |
| 475 | Turnagain Giga Metals Corp. (GIGA.V) | Nickel, Cobalt | Pre-Feasibility Oct 2023 | — | — | $2.00B | 30 yrs | — |
| 476 | Turnagain Ni-Co Project Giga Metals Corp. (GIGA.V) | Nickel/Cobalt | Pre-Feasibility Oct 2023 | — | — | $2.00B | 30 yrs | — |
| 477 | Greenstone Mine Equinox Gold Corp. (EQX.TO) | Gold | Feasibility Mar 2026 | — | — | $80M | 14 yrs | — |
| 478 | Oko West G Mining Ventures Corp. (GMIN.TO) | Gold | Feasibility Apr 2025 | — | — | $973M | 10 yrs | — |
| 479 | Northparkes Triple Flag Precious Metals Corp. (TFPM.TO) | Gold | Production Mar 2022 | — | — | $84M | — | — |
| 480 | Blackwater Mine Artemis Gold Inc. (ARTG.V) | Gold | Production | — | — | C$1.44B | — | — |
| 481 | Edikan Gold Mine (Esuajah South) Perseus Mining Limited (PRU.TO) | Gold | Feasibility Jan 2021 | — | — | $38M | — | — |
| 482 | Eskay Creek Skeena Gold & Silver Ltd. (SKE.TO) | Gold & Silver | Feasibility Nov 2023 | — | — | $659M | — | 687 US$/oz AuEq |
| 483 | Bomboré (Existing Phase I) Orezone Gold Corporation (ORE.TO) | Gold | Production Nov 2023 | — | — | $169M | — | — |
| 484 | Livengood Gold Project International Tower Hill Mines Ltd. (ITH.TO) | Gold | Pre-Feasibility 2023 | — | — | $1.93B | 21 yrs | 1,171 USD/oz |
| 485 | San Antonio Project Heliostar Metals Ltd. (HSTR.V) | Gold | PEA Nov 2024 | — | — | $131M | 14 yrs | 1,063 $/oz |
| 486 | Senegal Pilot Plant Dynacor Group Inc. (DNG.TO) | Gold | — | — | — | $25M | — | — |
| 487 | Imwelo Development Project Lake Victoria Gold Ltd. (LVG.V) | Gold | Pre-Feasibility | — | — | $15M | — | 1,500 USD/oz |
| 488 | Vila Nova Tailings Operation JZR Gold Inc. (JZR.V) | Gold | PEA | — | — | $7M | — | — |
| 489 | Cauchari-Olaroz Lithium Argentina Corp. (LAR.TO) | Lithium | Feasibility Jan 2026 | — | — | $979M | 35 yrs | — |
| 490 | Kwyjibo Project Consolidated Lithium Metals Inc. (CLM.V) | Rare Earth Elements | PEA Oct 2026 | — | — | C$889M | — | — |
| 491 | Kindersley Lithium Project – Phase 1 Grounded Lithium Corp. (GRD.V) | Lithium | PEA Jun 2023 | — | — | C$447M | 20 yrs | 5,199 CAD/tonne LHM |
| 492 | Bunker Hill 2.0 Expansion Project Bunker Hill Mining Corp. (BNKR.V) | Zinc (with Silver and Lead) | PEA | — | — | $60M | 13 yrs | 0.6 USD/lb Zn Payable |
| 493 | Grasberg minerals district Freeport-McMoRan (FCX) | Copper | Feasibility Dec 2022 | — | — | $14.50B | — | — |
| 494 | Zimplats Smelter & SO2 Abatement Impala Platinum Holdings (IMPUY) | PGM (6E) | — Mar 2026 | — | — | $544M | — | — |
| 495 | Impala Refineries New Final Metals Facility Impala Platinum Holdings (IMPUY) | PGM (6E) | — Mar 2026 | — | — | ZAR 899M | — | — |
| 496 | HyProMag GmbH Mkango Resources Ltd. (MKA.V) | NdFeB magnets / Rare earth magnet recycling | — | — | — | €6M | — | — |
| 497 | Mantoverde Optimized (MV-O) Capstone Copper Corp. (CS.TO) | Copper | Feasibility Oct 2024 | — | — | $176M | — | — |
| 498 | Fenix Project - Phase 1 (Gold) McEwen Mining Inc. (MUX.TO) | Gold | Feasibility Feb 2021 | — | — | $42M | 6 yrs | 1,045 USD/oz Au |
| 499 | Placentia Bay Oil Refinery (NLRC) Altius Minerals Corporation (ALS.TO) | Oil Refinery (refined petroleum products) | Feasibility Dec 2006 | — | 15% | $4.60B | — | — |
| 500 | Mabilo Stage 1 DSO RTG Mining Inc. (RTG.TO) | Copper, Gold | Feasibility 2024 | — | — | $25M | — | — |
| 501 | Mabilo Stage 2 RTG Mining Inc. (RTG.TO) | Copper, Gold, Iron | Feasibility 2016 | — | — | $164M | — | — |
| 502 | Miller Copper-Gold Property (Cam Copper Mine - Zone 2 Surgical Mining) Northstar Gold Corp. (NSG.CN) | Copper | PEA Jul 2025 | — | — | $2M | 2.6 yrs | — |
| 503 | Jorf Lasfar CSPG Anode Plant (Morocco) Falcon Energy Materials Inc. (FLCN.V) | CSPG (Coated Spheronized Purified Graphite) | PEA Oct 2025 | — | — | $86M | — | 3,168 USD/t CSPG |
| 504 | Pilar Gold (PGDM) Silver Crown Royalties Inc. (SCRI.V) | Silver (byproduct of gold) | — | — | 19% | $2M | — | — |
| 505 | Gold Mountain Mining (Elk Gold) Silver Crown Royalties Inc. (SCRI.V) | Silver (byproduct) | — | — | 15% | C$3M | — | — |
| 506 | Consolidated (Mineros S.A.) Mineros S.A. (MSA.TO) | Gold | Production 2026 | — | — | $114M | — | 2,420 USD/oz Au |
| 507 | Golden Chest Mine Idaho Strategic Resources, Inc. (IDR) | Gold | Feasibility Dec 2025 | — | — | $31M | 6 yrs | — |
| 508 | Khoemacau Royal Gold, Inc. (RGLD) | Silver | — | — | — | $900M | — | — |
| 509 | Chamé target Jaguar Mining Inc. (JAG.TO) | Gold | — | — | — | $43M | — | — |
| 510 | South Carlin Complex (South Railroad) Equinox Gold Corp. (EQX.TO) | Gold | Feasibility Feb 2026 | — | — | $395M | — | — |
| 511 | Sugar Zone Vox Royalty Corp. (VOXR.TO) | Gold | Production | — | — | $55M | — | — |
| 512 | Goulamina (Mali) - Reference/Comparable Lithium Africa Inc. (LAF.V) | Lithium | Production 2024 | — | 98% | $310M | — | 312 USD/t SC |
| 513 | Blackwater Mine - Phase 1A Expansion Artemis Gold Inc. (ARTG.V) | Gold | — 2026 | — | — | C$110M | — | — |
| 514 | Blackwater Mine - EP2 Expansion Artemis Gold Inc. (ARTG.V) | Gold | — Dec 2025 | — | — | C$1.44B | — | — |
| 515 | Springer Tungsten Blue Moon Metals Inc. (MOON.V) | Tungsten | PEA Dec 2013 | — | — | $50M | — | 350 USD/MTU |
| 516 | TITI Silver Crown Royalties Inc. (SCRI.V) | Silver | Production | — | 21% | $8M | — | — |
| 517 | Valentine Orla Mining Ltd. (OLA.TO) | Gold | Feasibility | — | — | $414M | 11 yrs | — |
| 518 | Elk Gold (Gold Mountain Mining) Silver Crown Royalties Inc. (SCRI.V) | Silver | Production May 2023 | — | — | C$3M | — | — |
| 519 | BAC (BacTech Environmental) Silver Crown Royalties Inc. (SCRI.V) | Silver | Production Nov 2024 | — | — | C$1M | — | — |
| 520 | Keliber Lithium Refinery (Kokkola) Sibanye Stillwater Limited (SBSW) | Lithium | Pre-Feasibility Apr 2023 | — | — | €276M | — | — |
| 521 | Joel Mine Harmony Gold Mining Company (HMY) | Gold | Production Jul 2022 | — | — | ZAR 726M | 8 yrs | — |
| 522 | KCGM Northern Star Resources (NST.AX) | Gold | Production Sep 2026 | — | — | A$1.75B | — | — |
| 523 | Ravenswood Gold Mine Triple Flag Precious Metals Corp. (TFPM.TO) | Gold | Production | — | — | $440M | — | — |
| 524 | Springer (Springer Mill & Tungsten Mine) Blue Moon Metals Inc. (MOON.V) | Tungsten | PEA Dec 2013 | — | — | $50M | — | — |
| 525 | Electra Cobalt Sulfate Refinery (Temiskaming, Ontario) Electra Battery Materials Corporation (ELBM.V) | Cobalt (cobalt sulfate) | Production Aug 2026 | — | — | $73M | — | — |
| 526 | Carlin Complex Iconic Minerals Ltd. (ICM.V) | Gold | Resource Estimate Mar 2025 | — | — | $2.43B | 20 yrs | — |
| 527 | NevGold Corp. (NAU.V) | Antimony & Gold | Resource Estimate Jul 2026 | — | — | $50M | — | — |
| 528 | Limousine Butte (Limo Butte) NevGold Corp. (NAU.V) | Antimony & Gold | Resource Estimate Jul 2026 | — | — | $50M | — | — |
| 529 | Limousine Butte Commercial Mining Operation (Scenario B / Project Golden Bullet) NevGold Corp. (NAU.V) | Antimony & Gold | Resource Estimate Jul 2026 | — | — | $250M | — | — |
| 530 | Katanning Gold Project OceanaGold Corporation (OGC.TO) | Gold | Pre-Feasibility Aug 2026 | — | — | $251M | 10 yrs | — |
| 531 | AurMac Project (exploration program) Orogen Royalties Inc. (OGN.V) | Gold | Resource Estimate May 2026 | — | — | $15M | — | — |
| 532 | Stibnite Gold Project (Perpetua Resources) - regional context Legacy Gold Mines Inc. (LEGY.V) | Gold | Production | — | — | $2.60B | 15 yrs | — |
| 533 | Electra Cobalt Sulfate Refinery (Electra Battery Materials Park) Electra Battery Materials Corporation (ELBM.V) | Cobalt (cobalt sulfate) | Production Sep 2026 | — | — | $73M | — | — |
| 534 | Grasberg Natural Gas Power Plant Freeport-McMoRan (FCX) | Copper | — | — | — | $1.00B | — | — |
| 535 | Consolidated (Americas Gold and Silver) – 2026 Guidance Americas Gold and Silver Corporation (USA.TO) | Silver | Production 2026 | — | — | $100M | — | 32.5 USD/oz Ag |
| 536 | Blackwater (Expanded Phase 2 - EP2) Artemis Gold Inc. (ARTG.V) | Gold | Production Dec 2025 | — | — | C$1.44B | — | — |
| 537 | Simfer Iron Ore Project Rio Tinto (RIO) | Iron ore | Feasibility Dec 2023 | — | — | $4.60B | — | — |
| 538 | Magnolia Field Bromine (Albemarle, Working Interest) Albemarle Corporation (ALB) | Bromine | Feasibility Feb 2024 | — | — | $1.40B | — | — |
| 539 | Consolidated (Company-wide) Americas Gold and Silver Corporation (USA.TO) | Silver | Production 2026 | — | — | $90M | — | 32.5 USD/oz |
| 540 | Oyu Tolgoi Project (Oyut & Hugo North) Rio Tinto (RIO) | Copper | Feasibility Dec 2022 | — | — | $7.36B | — | — |
| 541 | Magnolia Field Bromine (South & West Fields) Albemarle Corporation (ALB) | Bromine (brine) | Resource Estimate Dec 2023 | — | — | $1.40B | — | — |
| 542 | Sandy K Silver Tailings Project Nord Precious Metals Mining Inc. (NTH.V) | Silver | Feasibility Apr 1987 | — | — | C$5M | 7 yrs | — |
| 543 | Electra Cobalt Sulfate Refinery (Ontario) Electra Battery Materials Corporation (ELBM.V) | Cobalt | — | — | — | $73M | — | — |
| 544 | Ashram Rare Earth & Fluorspar Project Mont Royal Resources Ltd. (MRZL.V) | Rare earth elements | PEA 2012 | — | — | C$1.20B | 30 yrs | — |
| 545 | Middletown Works Energy Optimization Project Cleveland-Cliffs Inc. (CLF) | Steel | — | — | — | $500M | — | — |
| 546 | Butler Works GOES Expansion Cleveland-Cliffs Inc. (CLF) | Grain Oriented Electrical Steel | — | — | — | $200M | — | — |
| 547 | Turnagain Nickel-Cobalt Project Giga Metals Corp. (GIGA.V) | Nickel | Pre-Feasibility Oct 2023 | — | — | $2.00B | 30 yrs | — |
| 548 | Highland Valley Copper Mine Life Extension (HVC MLE) Teck Resources Limited (TECK) | Copper | — | — | — | C$2.40B | — | — |
NPV and capital costs are in millions of the study's stated currency; IRR and NPV are after-tax base-case figures where disclosed (pre-tax used as a fallback). Figures are automatically extracted from company filings and presentations and reflect the most recent disclosure found — they may contain errors. Always verify against the original source document before making any investment decision.