Gold$2,045.30+0.52%
Silver$23.84-0.18%
Copper$3.85+1.23%
Platinum$912.40-0.33%
Iron Ore$118.50+2.14%
Nickel$16,892-0.89%
Revival Gold Inc. logo

Revival Gold Inc.

RVG.VSmall CapGold

Price History

Loading chart...

About Revival Gold Inc.

Revival Gold Inc. (RVG.V) is a gold mining company listed on the TSX Venture Exchange (TSXV). Our project database tracks 3 projects for Revival Gold Inc. with technical and economic data extracted from company filings. Its flagship Beartrack-Arnett Gold Project (Pre-Feasibility) carries an after-tax NPV of $484M.

Revival Gold is developing the Beartrack-Arnett gold project in Idaho's Lemhi Pass district, a historically productive region with significant gold endowment. The company has defined a substantial gold resource with potential for economic open-pit and underground production.

Primary Commodities

Gold

Project Economics

Mercur Gold Project

Gold· Utah, USA (Tooele & Utah Counties)· Development
PEA
May 2025
NPV (After-Tax) @ 5%$295M
Initial Capex$208M
AISC1,385 USD/oz
Mine TypeHeap leach (open-pit)

Beartrack-Arnett Gold Project

Gold· Lemhi County, Idaho, USA· Development
Pre-Feasibility
Aug 2023
NPV (After-Tax) @ 5%$484M
Mine TypeOpen-pit heap leach with potential underground

Beartrack-Arnett Heap Leach Project

Gold· Lemhi County, Idaho, USA· Development
Pre-Feasibility
Jun 2023
NPV (After-Tax) @ 5%$105M
NPV (Pre-Tax)$130M
IRR (After-Tax)24.3%
Initial Capex$109M
Payback3.4 yrs
AISC1,235 USD/oz
Mine Life8.1 yrs
Annual Production65,324 oz Au
Head Grade0.022 oz/t (0.74 g/T)
Recovery61.6%
Mine TypeOpen-pit
Strip Ratio2.4
Ownership100%
Contained Metal2,423 koz Au
Mineral Reserves
Proven & Probable: 39.9 million tons (36.2 million tonnes) at 0.022 oz/t (0.74 g/T) gold, containing 859,000 oz gold (as per mine plan contained gold 858,926 oz per Table 1-3)
Mineral Resources
Measured + Indicated: 95,014 kt (86,184 kT) at 0.026 oz/t (0.87 g/T) containing 2,423 koz Au; Inferred: 55,926 kt (50,728 kT) at 0.039 oz/t (1.34 g/T) containing 2,190 koz Au

Project figures are automatically extracted from company filings and presentations and reflect the most recent disclosure found. They may contain errors — always verify against the linked source document.

How the Economics Evolved

Beartrack-Arnett Gold Project

5 studies on record
Pre-Feasibility
Aug 2023
$484M
IRR 80% · Capex $109M
Feasibility
Aug 2023
$484M
IRR 80% · Capex $109M
Pre-Feasibility
Aug 2023
$484M
IRR 80% · Capex $109M
Pre-Feasibility
Aug 2023
$484M
Pre-Feasibility
Aug 2023
$484M
IRR 80% · Capex $109M

Mercur Gold Project

6 studies on record
PEA
May 2025
$741M
IRR 56% · Capex $208M
PEA
May 2025
$741M
IRR 56% · Capex $208M
PEA
May 2025
$741M
IRR 56% · Capex $208M
PEA
May 2025
$741M
IRR 56% · Capex $208M
PEA
May 2025
$295M(-60%)
Capex $208M
PEA
May 2025
$741M(+151%)
IRR 56% · Capex $208M

Economics as disclosed in each successive study. NPV shown in US$ where a currency conversion is available (at each study's own period rate), else in the study's stated currency. Verify against the source filings.

Free email updates

Find the best mining projects

Be the first to know about new mining results, and how they compare to other projects.

Financial Metrics

Loading financial data...

Frequently Asked Questions

What does Revival Gold Inc. mine?
Revival Gold Inc. is focused on Gold.
What is the economic value of Revival Gold Inc.'s Beartrack-Arnett Gold Project?
According to its Pre-Feasibility, Beartrack-Arnett Gold Project has an after-tax NPV of $484M.
What exchange is Revival Gold Inc. listed on?
Revival Gold Inc. trades under the ticker RVG.V on the TSX Venture Exchange (TSXV).
How many projects does Revival Gold Inc. have?
We track 3 projects with extracted technical and economic data for Revival Gold Inc.

Quick Facts

Ticker Symbol
RVG.V
Market Cap
Small Cap
Category
Gold
Commodities
Gold

This information is for educational purposes only and does not constitute investment advice. Always conduct your own research before making investment decisions.

◆ ◆ ◆