About First Mining Gold Corp.

First Mining Gold Corp. (FF.TO) is a gold mining company listed on the Toronto Stock Exchange (TSX). Our project database tracks 5 projects for First Mining Gold Corp. with technical and economic data extracted from company filings. Its flagship Springpole Gold Project (Pre-Feasibility) carries an after-tax NPV of $2.10B and an IRR of 40.8% over a 9.4-year mine life.

First Mining Gold owns the Springpole gold project in northwestern Ontario, one of Canada's largest undeveloped gold deposits with approximately 3.8 million ounces of gold in measured and indicated resources. The company is focused on advancing permitting and development toward commercial production.

Primary Commodities

Gold

Project Economics

Pickle Crow Gold Project

Gold· Ontario, Canada· Exploration
Resource Estimate
Ownership20%
Mineral Resources
Inferred: 1,890,400 tonnes at 4.10 g/t Au containing 246,100 oz Au (100% basis; 20% attributable shown)
Royalties / Streams
Free carried to decision to mine; JV with Bellavista Resources (80%)

Pickle Crow (20%)

Gold· Ontario, Canada· Exploration
Ownership20%
Mineral Resources
Inferred (100% basis): 1,890,400 t at 4.10 g/t Au for 246,100 oz Au (attributable to First Mining's 20% interest)

Pickle Crow (20% interest)

Gold· Ontario, Canada· Exploration
Resource Estimate
Ownership20%
Contained Metal246,100 oz Au
Mineral Resources
Inferred (First Mining 20% share): 1,890,400 t at 4.10 g/t Au totalling 246,100 oz Au

Springpole Gold Project

Gold· Ontario, Canada· Development
Pre-Feasibility
Dec 2025
NPV (After-Tax) @ 5%$2.10B
NPV (Pre-Tax)$3.20B
IRR (After-Tax)40.8%
Initial Capex$1.10B
Payback1.8 yrs
AISC938 USD/oz
Mine Life9.4 yrs
Annual Production281 koz Au
Head Grade0.94 g/t Au
Recovery86%
Mine TypeOpen-pit
Strip Ratio3.0:1
Ownership100%
Contained Metal4,800,000 oz Au
Mineral Reserves
Probable Reserves of 102 Mt at 0.94 g/t Au totalling 3.1 Moz Au, and 4.9 g/t Ag totalling 16.1 Moz Ag
Mineral Resources
M&I: 191 Mt at 0.78 g/t Au totalling 4.8 Moz Au, plus Ag resources; Inferred: 64 Mt at 0.38 g/t Au totalling 0.8 Moz Au, plus Ag resources

Duparquet Gold Project

Gold· Quebec, Canada· Development
PEA
Oct 2023
NPV (After-Tax) @ 5%$588M
NPV (Pre-Tax)$1.07B
IRR (After-Tax)18%
Initial Capex$706M
Payback4.8 yrs
AISC976 USD/oz
Mine Life11 yrs
Annual Production233 koz Au
Head Grade1.51 g/t Au
Recovery89.5%
Mine TypeOpen-pit & Underground
Strip Ratio5.4:1
Ownership100%
Contained Metal3,440,600 oz Au
Mineral Resources
Indicated: 69,206,300 t at 1.55 g/t Au totalling 3,440,600 oz Au; Inferred: 50,822,000 t at 1.62 g/t Au totalling 2,640,500 oz Au

Project figures are automatically extracted from company filings and presentations and reflect the most recent disclosure found. They may contain errors — always verify against the linked source document.

Financial Metrics

Loading financial data...

Frequently Asked Questions

What does First Mining Gold Corp. mine?
First Mining Gold Corp. is focused on Gold.
What is the economic value of First Mining Gold Corp.'s Springpole Gold Project?
According to its Pre-Feasibility, Springpole Gold Project has an after-tax NPV of $2.10B and an IRR of 40.8%.
What exchange is First Mining Gold Corp. listed on?
First Mining Gold Corp. trades under the ticker FF.TO on the Toronto Stock Exchange (TSX).
How many projects does First Mining Gold Corp. have?
We track 5 projects with extracted technical and economic data for First Mining Gold Corp.

Quick Facts

Ticker Symbol
FF.TO
Market Cap
Small Cap
Category
Gold
Commodities
Gold

This information is for educational purposes only and does not constitute investment advice. Always conduct your own research before making investment decisions.

◆ ◆ ◆