Gold Mining Projects Ranked by NPV
After-tax NPV, IRR, initial capex, mine life and AISC for 181 gold projects across 102 companies, extracted from technical reports and ranked. Sort any column to compare gold developers and producers.
181 of 181 projects
| # | Project / Company | Study | ||||||
|---|---|---|---|---|---|---|---|---|
| 1 | Oko West G2 Goldfields Inc. (GTWO.TO) | Gold | Feasibility Apr 2025 | $5.18B | — | $972M | 12 yrs | 1,123 USD/oz |
| 2 | Donlin Gold NOVAGOLD Resources Inc. (NG.TO) | Gold | Pre-Feasibility Nov 2025 | $5.06B | 10.3% | $9.23B | 27 yrs | — |
| 3 | Oko-Ghanie G2 Goldfields Inc. (GTWO.TO) | Gold | PEA | $4.14B | — | $664M | 14 yrs | 1,191 USD/oz |
| 4 | Valley (Rogue Project) Snowline Gold Corp. (SGD.TO) | Gold | PEA Aug 2025 | C$3.37B | 25% | C$1.70B | 20 yrs | 844 USD/oz |
| 5 | Rogue Project (Valley deposit) Snowline Gold Corp. (SGD.TO) | Gold | PEA Jun 2025 | CDN 3.37B | 25% | CDN 1.69B | 20 yrs | 844 US$/oz |
| 6 | Valley Snowline Gold Corp. (SGD.TO) | Gold | PEA Aug 2025 | C$3.37B | 25% | C$1.69B | 20 yrs | 844 USD/oz |
| 7 | Rogue Project Snowline Gold Corp. (SGD.TO) | Gold | PEA Aug 2025 | C$3.37B | 25% | C$1.69B | 20 yrs | 844 USD/oz |
| 8 | Horne 5 Gold Project Falco Resources Ltd. (FPC.V) | Gold | Feasibility Jul 2026 | C$3.35B | 28.2% | C$1.75B | — | 782 USD/oz |
| 9 | Valentine Gold Mine Equinox Gold Corp. (EQX.TO) | Gold | Feasibility Mar 2026 | $3.11B | — | $507M | — | — |
| 10 | White Gold Project (Spot Case) White Gold Corp. (WGO.V) | Gold | PEA Aug 2026 | C$2.90B | 56% | C$1.00B | — | — |
| 11 | Converse Project Roxmore Resources Ltd. (RM.TO) | Gold | PEA May 2026 | $2.75B | 42.8% | $829M | 14.5 yrs | 1,769 USD/oz Au |
| 12 | Soto Norte Aris Mining Corporation (ARIS.TO) | Gold | Pre-Feasibility Sep 2025 | $2.68B | 35.4% | $625M | 22 yrs | 534 USD/oz |
| 13 | Oko Gold Project G2 Goldfields Inc. (GTWO.TO) | Gold | PEA Dec 2025 | $2.56B | 39% | $664M | 14 yrs | 1,191 USD/oz |
| 14 | Spanish Mountain Gold Project - Spot Case (US$3,300/oz gold) Spanish Mountain Gold Ltd. (SPA.V) | Gold | PEA Jul 2025 | C$2.30B | 32% | — | 24.5 yrs | — |
| 15 | Čoka Rakita (at $3,500/oz Au sensitivity) DPM Metals Corp. (DPM.TO) | Gold | Feasibility Jan 2026 | $2.21B | 67.8% | $448M | 10 yrs | — |
| 16 | Coffee Gold Project Fuerte Metals Corp. (FMT.V) | Gold | PEA Mar 2026 | $2.20B | 43.5% | — | 13 yrs | 1,386 USD/oz |
| 17 | Springpole Gold Project First Mining Gold Corp. (FF.TO) | Gold | Pre-Feasibility Dec 2025 | $2.10B | 40.8% | $1.10B | 9.4 yrs | 938 USD/oz |
| 18 | Çöpler District (Initial Assessment Case) SSR Mining Inc. (SSRM) | Gold | PEA Dec 2021 | $2.00B | — | $218M | 22 yrs | 924 USD/oz gold |
| 19 | White Gold Project White Gold Corp. (WGO.V) | Gold | PEA Aug 2026 | C$1.86B | 40.7% | C$1.00B | 9.4 yrs | 1,482 USD/oz |
| 20 | Toroparu Aris Mining Corporation (ARIS.TO) | Gold | PEA Oct 2025 | $1.80B | 25.2% | $820M | 21.3 yrs | 1,300 USD/oz |
| 21 | Çöpler District SSR Mining Inc. (SSRM) | Gold | Feasibility Dec 2021 | $1.73B | — | — | 21 yrs | 966 USD/oz |
| 22 | Çöpler District (Reserve Case) SSR Mining Inc. (SSRM) | Gold | Feasibility Dec 2021 | $1.73B | — | — | 21 yrs | 966 USD/oz gold |
| 23 | Ikkari Rupert Resources Ltd. (RUP.TO) | Gold | Pre-Feasibility Feb 2025 | $1.70B | 38% | $575M | 20 yrs | 918 USD/oz |
| 24 | Ikkari (Rupert Resources) Aurion Resources Ltd. (AU.V) | Gold | Pre-Feasibility Feb 2025 | $1.68B | 38% | $575M | — | — |
| 25 | Bankan Gold Project Robex Resources Inc. (RBX.V) | Gold | Feasibility Jun 2025 | $1.64B | 46% | $463M | 12.2 yrs | 1,057 USD/oz |
| 26 | Target Gold Mine Harmony Gold Mining Company (HMY) | Gold | Feasibility Oct 2024 | ZAR 1.52B | — | — | 5 yrs | — |
| 27 | Higginsville Hub Expansion (HXP) Westgold Resources Limited (WGX.TO) | Gold | Pre-Feasibility Mar 2026 | A$1.40B | 43% | A$145M | — | — |
| 28 | Higginsville Expansion (HXP) Westgold Resources Limited (WGX.TO) | Gold | Feasibility | A$1.40B | 43% | A$145M | — | — |
| 29 | Tower Gold Project STLLR Gold Inc. (STLR.TO) | Gold | PEA Jun 2025 | C$ 1.35B | 13.4% | C$ 1.87B | 19 yrs | 1,537 USD/oz |
| 30 | Camino Rojo Underground (PEA) Equinox Gold Corp. (EQX.TO) | Gold | PEA Mar 2026 | $1.30B | 30% | $608M | 17 yrs | 1,304 USD/oz |
| 31 | Camino Rojo Equinox Gold Corp. (EQX.TO) | Gold | Resource Estimate Mar 2026 | $1.30B | 30% | $608M | 17 yrs | 1,304 USD/oz |
| 32 | Goldfields - Upper Case Fortune Bay Corp. (FOR.V) | Gold | PEA Oct 2025 | C$1.25B | 74% | — | — | — |
| 33 | Porcupine Complex Discovery Silver Corp. (DSV.TO) | Gold | PEA Jan 2025 | $1.20B | — | — | 22 yrs | 1,504 USD/oz |
| 34 | Colomac Gold Project STLLR Gold Inc. (STLR.TO) | Gold | PEA Jun 2023 | C$ 1.17B | 34.6% | C$ 654M | 11 yrs | 828 USD/oz |
| 35 | Mt Todd Gold Project Vista Gold Corp. (VGZ) | Gold | Feasibility Mar 2024 | $1.13B | 20.4% | $1.03B | 16 yrs | — |
| 36 | Perron Gold Project Amex Exploration Inc. (AMX.V) | Gold | Feasibility Apr 2026 | C$1.13B | 114.6% | C$194M | 5 yrs | 910 USD/oz |
| 37 | Hemlo Gold Mine Hemlo Mining Corp. (HMMC.V) | Gold | Feasibility Oct 2025 | $1.09B | — | — | 14 yrs | 1,545 USD/oz |
| 38 | Koné Gold Project Montage Gold Corp. (MAU.TO) | Gold | Feasibility Feb 2024 | $1.09B | 31% | $712M | 16 yrs | 998 USD/oz |
| 39 | Spanish Mountain Gold Project Spanish Mountain Gold Ltd. (SPA.V) | Gold | PEA Jul 2025 | C$1.00B | 18.2% | — | 24.5 yrs | — |
| 40 | Cariboo Gold Project Osisko Development Corp. (ODV.V) | Gold | Feasibility Apr 2025 | C$943M | 22.1% | C$881M | 10 yrs | 1,157 USD/oz |
| 41 | Gramalote Project B2Gold Corp. (BTO.TO) | Gold | Feasibility Jul 2025 | $941M | 22.4% | $740M | 13 yrs | 985 USD/oz |
| 42 | Goldfields - Intermediate Case Fortune Bay Corp. (FOR.V) | Gold | PEA Oct 2025 | C$916M | 59% | — | — | — |
| 43 | Fondaway Canyon Getchell Gold Corp. (GTCH.CN) | Gold | PEA Jun 2026 | $905M | 53.1% | $265M | 10.1 yrs | — |
| 44 | CC&V SSR Mining Inc. (SSRM) | Gold | Feasibility Nov 2025 | $824M | — | — | 12 yrs | 2,135 USD/oz |
| 45 | CC&V (Cripple Creek & Victor) SSR Mining Inc. (SSRM) | Gold | Feasibility Jul 2025 | $824M | — | — | 12 yrs | 2,135 USD/oz |
| 46 | South Railroad Equinox Gold Corp. (EQX.TO) | Gold | Feasibility Feb 2026 | $783M | 48% | $395M | 10 yrs | 1,505 USD/oz Au |
| 47 | Musselwhite Mine Equinox Gold Corp. (EQX.TO) | Gold | Feasibility Dec 2024 | $782M | — | — | 7 yrs | — |
| 48 | Čoka Rakita (Feasibility Study) DPM Metals Corp. (DPM.TO) | Gold | Feasibility Jan 2026 | $782M | 36% | $448M | 10 yrs | 644 USD/oz payable gold |
| 49 | DeLamar Project Integra Resources Corp. (ITR.V) | Gold | Feasibility Feb 2026 | $774M | 46% | $389M | 10 yrs | 1,480 USD/oz AuEq |
| 50 | Koné Gold Project (KGP) Montage Gold Corp. (MAU.TO) | Gold | Feasibility Feb 2022 | $746M | 34.8% | $544M | — | 933 USD/oz |
| 51 | Mercur Gold Project Revival Gold Inc. (RVG.V) | Gold | PEA May 2025 | $741M | 56% | $208M | 10 yrs | 1,385 USD/oz |
| 52 | New Amalga Gold Project Grande Portage Resources Ltd. (GPG.V) | Gold | PEA Feb 2026 | $721M | 56% | $255M | 7 yrs | 1,408 USD/oz Au |
| 53 | Fenelon Gold Project Wallbridge Mining Company Limited (WM.TO) | Gold | PEA Mar 2025 | C$706M | 21% | C$579M | 16 yrs | 1,046 USD/oz |
| 54 | Lemhi Gold Project Freeman Gold Corp. (FMAN.V) | Gold | Feasibility Jun 2026 | $696M | 34.4% | $330M | 15 yrs | — |
| 55 | Volta Grande Belo Sun Mining Corp. (BSX.TO) | Gold | Feasibility May 2015 | $665M | 26% | $298M | 17.2 yrs | 779 USD/oz |
| 56 | Enchi Gold Project - Spot Price Case Newcore Gold Ltd. (NCAU.V) | Gold | Pre-Feasibility Jun 2026 | $647M | 45% | $351M | 9.3 yrs | — |
| 57 | Bomboré Orezone Gold Corporation (ORE.TO) | Gold | Feasibility Nov 2023 | $636M | — | $58M | — | 2,200 USD/oz |
| 58 | Bomboré Phase II Expansion Orezone Gold Corporation (ORE.TO) | Gold | Feasibility Nov 2023 | $636M | — | $168M | — | — |
| 59 | Douta Gold Project Thor Explorations Ltd. (THX.V) | Gold | Pre-Feasibility Jan 2026 | $633M | 61% | $254M | 12.6 yrs | 1,890 USD/oz |
| 60 | Waihi North Project (Wharekirauponga) OceanaGold Corporation (OGC.TO) | Gold | Pre-Feasibility Dec 2024 | $621M | 24% | — | — | — |
| 61 | Waihi District - Alternative Case OceanaGold Corporation (OGC.TO) | Gold | Pre-Feasibility Dec 2024 | $621M | 24% | — | — | — |
| 62 | Waihi North Project OceanaGold Corporation (OGC.TO) | Gold | Pre-Feasibility Dec 2024 | $621M | 24% | — | — | — |
| 63 | Johnson Tract Dolly Varden Silver Corp. (DV.V) | Gold | PEA May 2025 | $615M | 60% | $214M | 7 yrs | 860 USD/oz AuEq |
| 64 | Mineral Point Open Pit i-80 Gold Corp. (IAU.TO) | Gold | PEA Mar 2025 | $614M | 12% | — | 17 yrs | 1,400 USD/oz |
| 65 | Scottie Gold Mine (Toll Milling Scenario) Scottie Resources Corp. (SCOT.V) | Gold | PEA Oct 2025 | C$606M | 135.2% | — | — | — |
| 66 | Castelo de Sonhos TriStar Gold Inc. (TSG.V) | Gold | Pre-Feasibility May 2025 | $603M | 40% | $296M | 11 yrs | 1,111 USD/oz |
| 67 | Florida Canyon Mine Integra Resources Corp. (ITR.V) | Gold | Feasibility Jul 2026 | $601M | — | — | 8 yrs | 2,331 USD/oz |
| 68 | Florida Canyon Mine - 2026 Technical Report Base Case Integra Resources Corp. (ITR.V) | Gold | Feasibility Jul 2026 | $601M | — | — | 8 yrs | 2,331 USD/oz |
| 69 | Duparquet Gold Project First Mining Gold Corp. (FF.TO) | Gold | PEA Oct 2023 | $588M | 18% | $706M | 11 yrs | 976 USD/oz |
| 70 | Eau Claire Gold Project Fury Gold Mines Limited (FURY.TO) | Gold | Pre-Feasibility Jun 2026 | C$554M | 41% | C$217M | 11 yrs | 1,140 USD/oz |
| 71 | Quinchía Gold Project Tiger Gold Corp. (TIGR.V) | Gold | PEA Sep 2025 | $534M | 21.3% | $480M | — | 1,340 USD/oz |
| 72 | O'Brien Gold Project Globex Mining Enterprises Inc. (GMX.TO) | Gold | PEA Aug 2025 | C$532M | 47.6% | C$175M | 11 yrs | 1,058.5 USD/oz |
| 73 | São Jorge GoldMining Inc. (GOLD.TO) | Gold | PEA Jun 2026 | $532M | 42% | $202M | 10.6 yrs | — |
| 74 | Condor Gold Project Silvercorp Metals Inc. (SVM.TO) | Gold | PEA Jan 2026 | $522M | 29% | $292M | 13 yrs | 1,359 USD/EqOz-Payable |
| 75 | Kandiolé Gold Project Roscan Gold Corporation (ROS.V) | Gold | PEA Feb 2026 | $498M | 43% | $219M | 13 yrs | 1,568 USD/oz |
| 76 | Enchi Gold Project Newcore Gold Ltd. (NCAU.V) | Gold | Pre-Feasibility Aug 2026 | $496M | 37% | $351M | 9.3 yrs | 2,290 USD/oz |
| 77 | Beartrack-Arnett Gold Project Revival Gold Inc. (RVG.V) | Gold | Pre-Feasibility Aug 2023 | $484M | 80% | $109M | 8 yrs | 1,248 USD/oz |
| 78 | Porvenir Mineros S.A. (MSA.TO) | Gold | Pre-Feasibility Mar 2026 | $460M | 37.9% | $207M | 10 yrs | 1,295 USD/oz AuEq |
| 79 | Shovelnose Westhaven Gold Corp. (WHN.V) | Gold | PEA Apr 2025 | C$454M | 43.2% | C$185M | 11.1 yrs | 836 USD/oz AuEq |
| 80 | Camino Rojo Orla Mining Ltd. (OLA.TO) | Gold | Feasibility Jan 2021 | $452M | 62% | $134M | 10.4 yrs | 543 USD/oz Au |
| 81 | Buckreef Gold Project TRX Gold Corporation (TRX.TO) | Gold | PEA May 2025 | $442M | — | $89M | 17.6 yrs | 1,206 USD/oz |
| 82 | Ana Paula Project Heliostar Metals Ltd. (HSTR.V) | Gold | PEA Nov 2025 | $426M | 28.1% | $300M | 9 yrs | 1,011 USD/oz |
| 83 | Cerro del Gallo Project Heliostar Metals Ltd. (HSTR.V) | Gold | Pre-Feasibility Dec 2025 | $424M | 33.1% | $195M | 15 yrs | 1,390 USD/GEO |
| 84 | Granite Creek Open Pit i-80 Gold Corp. (IAU.TO) | Gold | PEA Mar 2025 | $421M | 30% | — | 10 yrs | 1,225 USD/oz |
| 85 | True North Gold Project 1911 Gold Corporation (AUMB.V) | Gold | PEA Feb 2026 | C$391M | 105% | C$59M | 11 yrs | 1,897 USD/oz |
| 86 | Cadillac Project (PEA reference on timeline) Cartier Resources Inc. (ECR.V) | Gold | PEA undefined 2022 | C$388M | 21% | — | — | — |
| 87 | Grassy Mountain Paramount Gold and Silver Corp. (PZG) | Gold | Feasibility May 2026 | $375M | 39% | $190M | 9.3 yrs | 1,442 USD/oz |
| 88 | Casa Berardi Mine Hecla Mining Company (HL) | Gold | Feasibility Feb 2024 | $356M | — | — | 14 yrs | — |
| 89 | Asanko Gold Mine Galiano Gold Inc. (GAU.TO) | Gold | Feasibility Mar 2023 | $343M | — | $58M | 8.5 yrs | 1,143 USD/oz |
| 90 | Copperstone Project Minera Alamos Inc. (MAI.V) | Gold | Feasibility Sep 2026 | $341M | 111% | $57M | 6.3 yrs | 1,338 USD/oz |
| 91 | Goliath Gold Complex NexGold Mining Corp. (NEXG.V) | Gold | Pre-Feasibility Mar 2023 | C$336M | 25.4% | C$335M | 13 yrs | 1,037 USD/oz |
| 92 | Galaxy Gold Mine Golconda Gold Ltd. (GG.V) | Gold | Production Feb 2026 | $336M | — | — | 20 yrs | — |
| 93 | Goldboro Gold Project NexGold Mining Corp. (NEXG.V) | Gold | Feasibility Jan 2022 | C$328M | 25.5% | C$271M | 10.9 yrs | 849 USD/oz |
| 94 | Madsen⚑ Star Royalties Ltd. (STRR.V) | Gold | Pre-Feasibility 2025 | C$315M | 255% | C$44M | 6 yrs | 1,681 USD/oz |
| 95 | Eagle Mountain Gold Project Mako Mining Corp. (MKO.V) | Gold | PEA Mar 2024 | $292M | 57% | — | 15 yrs | 829 USD/oz |
| 96 | Goldfields Fortune Bay Corp. (FOR.V) | Gold | PEA Nov 2022 | C$285M | 35.2% | C$234M | 8.3 yrs | 889 USD/oz Au |
| 97 | Grey Fox McEwen Mining Inc. (MUX.TO) | Gold | Pre-Feasibility Mar 2026 | $282M | 24.8% | $177M | — | — |
| 98 | Cove Underground i-80 Gold Corp. (IAU.TO) | Gold | PEA Mar 2025 | $271M | 30% | — | — | — |
| 99 | Mexican Hat Gold Project GMV Minerals Inc. (GMV.V) | Gold | PEA Sep 2025 | $268M | 50.2% | $90M | 10 yrs | 1,545 USD/oz |
| 100 | La Colorada Mine Heliostar Metals Ltd. (HSTR.V) | Gold | Production 2026 | $243M | 168.4% | $45M | 6 yrs | — |
| 101 | Altan Tsagaan Ovoo Project (ATO) Steppe Gold Ltd. (STGO.TO) | Gold | Feasibility Aug 2022 | $242M | — | $129M | 14 yrs | — |
| 102 | Copperstone Star Royalties Ltd. (STRR.V) | Gold | PEA 2025 | $227M | 170.9% | $36M | 6 yrs | 1,259 USD/oz |
| 103 | Tarkwa Gold Mine Gold Fields Limited (GFI) | Gold | Resource Estimate Mar 2026 | $226M | — | — | 17 yrs | — |
| 104 | Cerro Caliche Gold Project Sonoro Gold Corp. (SGO.V) | Gold | PEA Mar 2026 | $224M | 50% | $83M | 10 yrs | 1,902 USD/oz |
| 105 | St Ives Gold Mine Gold Fields Limited (GFI) | Gold | Production Mar 2025 | $221M | — | — | 9 yrs | — |
| 106 | Scottie Gold Mine (DSO Mine Plan) Scottie Resources Corp. (SCOT.V) | Gold | PEA Oct 2025 | C$216M | 60.3% | C$129M | 7 yrs | — |
| 107 | Scottie Gold Mine (Blueberry Contact Zone & Scottie Mine) Scottie Resources Corp. (SCOT.V) | Gold | PEA Oct 2025 | C$216M | 60.3% | C$129M | 7 yrs | — |
| 108 | Scottie Gold Mine - DSO (Blueberry + Scottie Mine) Scottie Resources Corp. (SCOT.V) | Gold | PEA Oct 2025 | C$216M | 60.3% | C$129M | 7 yrs | — |
| 109 | Back Forty Gold Resource Corporation (GORO) | Gold | PEA Oct 2023 | $214M | 25.7% | $325M | 9 yrs | 920 USD/oz |
| 110 | Doby George Western Exploration Inc. (WEX.V) | Gold | PEA May 2025 | $211M | 62.2% | $115M | 4.2 yrs | 1,197 USD/oz |
| 111 | Fenix Gold Rio2 Limited (RIO.TO) | Gold | Feasibility Oct 2023 | $210M | 28.5% | $117M | 17 yrs | 1,237.1 USD/oz |
| 112 | Zancudo⚑ Star Royalties Ltd. (STRR.V) | Gold | PEA Dec 2025 | $206M | 287% | $15M | 10.3 yrs | 1,059 USD/oz |
| 113 | Sandman Borealis Mining Company Ltd. (BOGO.V) | Gold | PEA 2026 | $203M | 104.9% | $36M | 9 yrs | 1,823 USD/oz |
| 114 | Nyanzaga Gold Mine Perseus Mining Limited (PRU.TO) | Gold | Feasibility Jun 2025 | $202M | 19% | $523M | 16 yrs | 1,621 USD/oz |
| 115 | San Gabriel Project Compania de Minas Buenaventura S.A.A. (BVN) | Gold | Feasibility Apr 2025 | $191M | 21.8% | $177M | 14.2 yrs | 1,568 US$/oz Au |
| 116 | Bayan Khundii Gold Project (BK Gold Deposit & Dark Horse Mane Gold Deposit) Erdene Resource Development Corp. (ERD.TO) | Gold | Feasibility Aug 2023 | $170M | 35.3% | $100M | 6.5 yrs | — |
| 117 | Bayan Khundii Gold Project (BK & Dark Horse Mane) Erdene Resource Development Corp. (ERD.TO) | Gold | Feasibility Aug 2023 | $170M | 35.3% | $100M | 8.5 yrs | — |
| 118 | Tantahuatay Compania de Minas Buenaventura S.A.A. (BVN) | Gold | Resource Estimate Dec 2021 | $157M | — | — | 6 yrs | — |
| 119 | Granite Creek Underground i-80 Gold Corp. (IAU.TO) | Gold | PEA Mar 2025 | $155M | 84% | — | 8 yrs | 1,597 USD/oz |
| 120 | Boroo Steppe Gold Ltd. (STGO.TO) | Gold | Feasibility Feb 2024 | $152M | — | — | 8 yrs | — |
| 121 | South Deep Gold Mine Gold Fields Limited (GFI) | Gold | Production Mar 2025 | $139M | — | — | 85 yrs | — |
| 122 | Waihi District OceanaGold Corporation (OGC.TO) | Gold | Pre-Feasibility Dec 2024 | $138M | 9.2% | $556M | 15 yrs | 994 USD/oz |
| 123 | Otjikoto Mine - Antelope Deposit B2Gold Corp. (BTO.TO) | Gold | PEA Feb 2025 | $131M | 35% | $129M | 5 yrs | 1,095 USD/oz |
| 124 | Antelope Deposit B2Gold Corp. (BTO.TO) | Gold | PEA Feb 2025 | $131M | 35% | $129M | 5 yrs | 1,095 USD/oz |
| 125 | Antelope Deposit (Otjikoto) B2Gold Corp. (BTO.TO) | Gold | PEA 2025 | $131M | 35% | $129M | 5 yrs | 1,095 USD/oz |
| 126 | Archimedes Underground i-80 Gold Corp. (IAU.TO) | Gold | PEA Mar 2025 | $127M | 23% | $49M | 10 yrs | 1,893 USD/oz |
| 127 | Rozino Velocity Minerals Ltd. (VLC.V) | Gold | Pre-Feasibility Dec 2021 | $123M | 27.4% | $87M | 7 yrs | 755 USD/oz |
| 128 | Minera Don Nicolas Cerrado Gold Inc. (CERT.V) | Gold | PEA Sep 2024 | $111M | — | $0M | 5 yrs | 1,146 USD/oz |
| 129 | Beartrack-Arnett Heap Leach Project Revival Gold Inc. (RVG.V) | Gold | Pre-Feasibility Jun 2023 | $105M | 24.3% | $109M | 8.1 yrs | 1,235 USD/oz |
| 130 | Soledad Mountain Andean Precious Metals Corp. (APM.TO) | Gold | Feasibility Jan 2024 | $102M | — | — | 5 yrs | — |
| 131 | Seabee Gold Operation SSR Mining Inc. (SSRM) | Gold | Feasibility Dec 2023 | $95M | — | — | 4.2 yrs | 2,231 USD/oz |
| 132 | San Jose de Gracia Mine DynaResource Inc. (DYNR) | Gold | Feasibility Mar 2025 | $84M | — | — | 7 yrs | 1,720 USD/oz AuEq |
| 133 | Cuiú Cuiú Gold Project Cabral Gold Inc. (CBR.V) | Gold | Pre-Feasibility Jul 2025 | $74M | 77.8% | $38M | 6.2 yrs | 1,209.9 USD/oz Au |
| 134 | Cuiú Cuiú Gold District Cabral Gold Inc. (CBR.V) | Gold | Pre-Feasibility Jul 2025 | $74M | 77.8% | $38M | 6.2 yrs | 1,209.9 USD/oz Au |
| 135 | La Fortuna Minera Alamos Inc. (MAI.V) | Gold | PEA Jul 2018 | $70M | 93% | $27M | 5 yrs | 440 USD/oz |
| 136 | Senegal Mali Shear Zone (SMSZ) Project Desert Gold Ventures Inc. (DAU.V) | Gold | PEA Jan 2026 | $61M | 57% | $20M | 10 yrs | 1,137 USD/oz |
| 137 | El Bagre Gold Mining Complex (Cordero Mine) Soma Gold Corp. (SOMA.V) | Gold | PEA Jan 2023 | C$56M | — | — | 3.2 yrs | 1,418 C$/oz |
| 138 | Sissingué Gold Project Perseus Mining Limited (PRU.TO) | Gold | Feasibility May 2015 | $53M | 27% | $106M | 5.3 yrs | 632 USD/oz |
| 139 | PL Gold Mine Minnova Corp. (MCI.V) | Gold | Feasibility Nov 2017 | C$37M | 53% | C$35M | 5 yrs | 942 USD/oz |
| 140 | PL Gold Mine (PL Mine) Minnova Corp. (MCI.V) | Gold | Feasibility 2017 | $37M | 53% | — | 5 yrs | — |
| 141 | San Agustin Mine⚑ Heliostar Metals Ltd. (HSTR.V) | Gold | Production 2026 | $35M | 548% | $40M | 1.2 yrs | 2,150 USD/oz Au |
| 142 | Kinsley Mountain Gold Project CopAur Minerals Inc. (CPAU.V) | Gold | PEA Jul 2026 | $35M | 19.7% | $82M | 4 yrs | 1,861 USD/oz |
| 143 | Sierra Antapite Empress Royalty Corp. (EMPR.V) | Gold | Production Jul 2026 | $28M | — | $10M | — | — |
| 144 | SMSZ Project Desert Gold Ventures Inc. (DAU.V) | Gold | PEA Aug 2025 | $24M | 34% | $4M | — | 1,352 USD/oz |
| 145 | Galaxy Empress Royalty Corp. (EMPR.V) | Gold | Production Jul 2026 | $15M | — | $5M | — | — |
| 146 | Terakimti Oxide Deposit, Harvest Project East Africa Metals Inc. (EAM.V) | Gold | PEA Oct 2015 | $13M | 30.1% | $17M | 4 yrs | — |
| 147 | Da Tambuk East Africa Metals Inc. (EAM.V) | Gold | PEA Apr 2018 | $13M | 28.6% | $34M | — | — |
| 148 | San Agustin Mine (PEA case from Technical Report Highlights) Heliostar Metals Ltd. (HSTR.V) | Gold | Feasibility Nov 2024 | $12M | 156% | $40M | — | 1,990 USD/GEO |
| 149 | Manica Empress Royalty Corp. (EMPR.V) | Gold | Production Jul 2026 | $7M | — | $3M | — | — |
| 150 | Orcopampa Compania de Minas Buenaventura S.A.A. (BVN) | Gold | Feasibility May 2022 | $-30M | — | — | 3 yrs | 1,242 USD/oz Au |
| 151 | Golden Chest Mine Idaho Strategic Resources, Inc. (IDR) | Gold | Feasibility Dec 2025 | — | — | $31M | 6 yrs | — |
| 152 | Consolidated (Mineros S.A.) Mineros S.A. (MSA.TO) | Gold | Production 2026 | — | — | $114M | — | 2,420 USD/oz Au |
| 153 | Fenix Project - Phase 1 (Gold) McEwen Mining Inc. (MUX.TO) | Gold | Feasibility Feb 2021 | — | — | $42M | 6 yrs | 1,045 USD/oz Au |
| 154 | Mon Gold Mine Sixty North Gold Mining Ltd. (SXTY.CN) | Gold | — Feb 2025 | — | — | C$4M | — | — |
| 155 | Joel Mine Harmony Gold Mining Company (HMY) | Gold | Resource Estimate Jun 2022 | — | — | ZAR 726M | 8 yrs | — |
| 156 | Valentine Orla Mining Ltd. (OLA.TO) | Gold | Feasibility | — | — | $414M | 11 yrs | — |
| 157 | Stibnite Gold Project (Perpetua Resources) - regional context Legacy Gold Mines Inc. (LEGY.V) | Gold | Production | — | — | $2.60B | 15 yrs | — |
| 158 | AurMac Project (exploration program) Orogen Royalties Inc. (OGN.V) | Gold | Resource Estimate May 2026 | — | — | $15M | — | — |
| 159 | Ravenswood Gold Mine Triple Flag Precious Metals Corp. (TFPM.TO) | Gold | Production | — | — | $440M | — | — |
| 160 | Katanning Gold Project OceanaGold Corporation (OGC.TO) | Gold | Feasibility Dec 2025 | — | — | $251M | 10 yrs | — |
| 161 | Carlin Complex Iconic Minerals Ltd. (ICM.V) | Gold | Resource Estimate Mar 2025 | — | — | $2.43B | 20 yrs | — |
| 162 | Chamé target Jaguar Mining Inc. (JAG.TO) | Gold | — | — | — | $43M | — | — |
| 163 | South Carlin Complex (South Railroad) Equinox Gold Corp. (EQX.TO) | Gold | Feasibility Feb 2026 | — | — | $395M | — | — |
| 164 | Sugar Zone Vox Royalty Corp. (VOXR.TO) | Gold | Resource Estimate | — | — | $55M | — | — |
| 165 | Blackwater Mine - EP2 Expansion Artemis Gold Inc. (ARTG.V) | Gold | — Dec 2025 | — | — | C$1.44B | — | — |
| 166 | Blackwater Mine - Phase 1A Expansion Artemis Gold Inc. (ARTG.V) | Gold | — 2026 | — | — | C$110M | — | — |
| 167 | Bayan Khundii Erdene Resource Development Corp. (ERD.TO) | Gold | Feasibility 2023 | — | — | $115M | 6 yrs | — |
| 168 | Senegal Pilot Plant Dynacor Group Inc. (DNG.TO) | Gold | — | — | — | $25M | — | — |
| 169 | Cerro de Oro Project Minera Alamos Inc. (MAI.V) | Gold | PEA Jan 2023 | — | 111% | $28M | 8.2 yrs | 873 USD/oz |
| 170 | San Antonio Project Heliostar Metals Ltd. (HSTR.V) | Gold | PEA Nov 2024 | — | — | $131M | 14 yrs | 1,063 $/oz |
| 171 | Bomboré (Existing Phase I) Orezone Gold Corporation (ORE.TO) | Gold | Production Nov 2023 | — | — | $169M | — | — |
| 172 | Livengood Gold Project International Tower Hill Mines Ltd. (ITH.TO) | Gold | Pre-Feasibility 2023 | — | — | $1.93B | 21 yrs | 1,171 USD/oz |
| 173 | Tonopah Gold Project Viva Gold Corp. (VAU.V) | Gold | PEA Aug 2025 | — | 17.6% | $220M | 7 yrs | 1,269 USD/oz |
| 174 | Vila Nova Tailings Operation JZR Gold Inc. (JZR.V) | Gold | PEA | — | — | $7M | — | — |
| 175 | Isabella Pearl Mine Fortitude Gold Corp. (FTCO) | Gold | Resource Estimate Dec 2022 | — | — | $1M | — | 1,697 USD/oz |
| 176 | Imwelo Development Project Lake Victoria Gold Ltd. (LVG.V) | Gold | Pre-Feasibility | — | — | $15M | — | 1,500 USD/oz |
| 177 | Tulkubash Silvercorp Metals Inc. (SVM.TO) | Gold | Feasibility Jul 2026 | — | — | $166M | 3.5 yrs | — |
| 178 | Edikan Gold Mine (Esuajah South) Perseus Mining Limited (PRU.TO) | Gold | Feasibility Jan 2021 | — | — | $38M | — | — |
| 179 | Greenstone Mine Equinox Gold Corp. (EQX.TO) | Gold | Feasibility Mar 2026 | — | — | $80M | 14 yrs | — |
| 180 | Northparkes Triple Flag Precious Metals Corp. (TFPM.TO) | Gold | Production Mar 2022 | — | — | $84M | — | — |
| 181 | Oko West G Mining Ventures Corp. (GMIN.TO) | Gold | Feasibility Apr 2025 | — | — | $973M | 10 yrs | — |
Figures are automatically extracted from company filings and presentations and reflect the most recent disclosure found — they may contain errors. Always verify against the original source document before making any investment decision. Back to all project economics.