Gold Mining Projects Ranked by NPV
After-tax NPV, IRR, initial capex, mine life and AISC for 185 gold projects across 108 companies, extracted from technical reports and ranked. Sort any column to compare gold developers and producers.
Find the best mining projects. Be the first to know about new mining results, and how they compare to other projects.
185 of 185 projects
| # | Project / Company | Study | ||||||
|---|---|---|---|---|---|---|---|---|
| 1 | KSM Project Seabridge Gold Inc. (SEA.TO) | Gold | Pre-Feasibility 2022 | $7.90B | 16.1% | $6.40B | 33 yrs | 601 USD/oz Au (all-in total costs, net of by-products) |
| 2 | Oko West G2 Goldfields Inc. (GTWO.TO) | Gold | Feasibility Apr 2025 | $5.18B | — | $972M | 12 yrs | 1,123 USD/oz |
| 3 | Donlin Gold Project NOVAGOLD Resources Inc. (NG.TO) | Gold | Pre-Feasibility Nov 2025 | $5.06B | 10.3% | $9.23B | 27 yrs | — |
| 4 | Oko-Ghanie G2 Goldfields Inc. (GTWO.TO) | Gold | PEA | $4.14B | — | $664M | 14 yrs | 1,191 USD/oz |
| 5 | Omai Gold Project (Wenot Open Pit & Gilt Underground) Omai Gold Mines Corp. (OMG.V) | Gold | PEA Aug 2026 | $4.00B | 24% | $1.43B | 18 yrs | 1,608 USD/oz |
| 6 | Boumadine Polymetallic Project Aya Gold & Silver Inc. (AYA.TO) | Gold | PEA Sep 2026 | $3.50B | 93% | $463M | 14 yrs | 1,300 USD/oz AuEq (LOM; $1,105/oz Y1-Y5) |
| 7 | Valley Snowline Gold Corp. (SGD.TO) | Gold | PEA Aug 2025 | C$3.37B | 25% | C$1.69B | 20 yrs | 844 USD/oz |
| 8 | Rogue Project Snowline Gold Corp. (SGD.TO) | Gold | PEA Aug 2025 | C$3.37B | 25% | C$1.69B | 20 yrs | 844 USD/oz |
| 9 | Horne 5 Gold Project Falco Resources Ltd. (FPC.V) | Gold | Feasibility Jul 2026 | C$3.35B | 28.2% | C$1.75B | — | 782 USD/oz |
| 10 | Troilus Gold - Copper Project Troilus Mining Corp. (TLG.TO) | Gold | Feasibility Sep 2026 | $3.21B | 22% | $1.43B | 26 yrs | 1,340 USD/oz |
| 11 | Valentine Gold Mine Equinox Gold Corp. (EQX.TO) | Gold | Feasibility Mar 2026 | $3.11B | — | $507M | — | — |
| 12 | Valentine Gold Mine (Phase 1 + Phase 2) Orla Mining Ltd. (OLA.TO) | Gold | Pre-Feasibility Mar 2026 | $3.10B | — | $436M | 12 yrs | 1,665 USD/oz |
| 13 | White Gold Project (Spot Case) White Gold Corp. (WGO.V) | Gold | PEA Aug 2026 | C$2.90B | 56% | C$1.00B | — | — |
| 14 | Converse Project Roxmore Resources Ltd. (RM.TO) | Gold | PEA May 2026 | $2.75B | 42.8% | $829M | 14.5 yrs | 1,769 USD/oz Au |
| 15 | Soto Norte Project Aris Mining Corporation (ARIS.TO) | Gold | Pre-Feasibility Sep 2025 | $2.68B | 35.4% | $625M | 22 yrs | 534 USD/oz |
| 16 | Oko Gold Project G2 Goldfields Inc. (GTWO.TO) | Gold | PEA Dec 2025 | $2.56B | 39% | $664M | 14 yrs | 1,191 USD/oz |
| 17 | Tower Gold Project STLLR Gold Inc. (STLR.TO) | Gold | PEA Jun 2025 | C$2.50B | 24% | C$1.87B | 19 yrs | 1,537 USD/oz |
| 18 | Lawyers-Ranch Thesis Gold Inc. (TAU.V) | Gold | Pre-Feasibility Dec 2025 | C$2.37B | 54.4% | C$736M | 15 yrs | 1,185 USD/oz AuEq |
| 19 | Spanish Mountain Gold Project - Spot Case (US$3,300/oz gold) Spanish Mountain Gold Ltd. (SPA.V) | Gold | PEA Jul 2025 | C$2.30B | 32% | — | 24.5 yrs | — |
| 20 | Čoka Rakita (at $3,500/oz Au sensitivity) DPM Metals Corp. (DPM.TO) | Gold | Feasibility Jan 2026 | $2.21B | 67.8% | $448M | 10 yrs | — |
| 21 | Coffee Gold Project Fuerte Metals Corp. (FMT.V) | Gold | PEA Mar 2026 | $2.20B | 43.5% | $998M | 13 yrs | 1,386 USD/oz |
| 22 | Spanish Mountain Gold Project Spanish Mountain Gold Ltd. (SPA.V) | Gold | PEA Sep 2026 | $2.16B | 35.2% | $1.05B | 25.8 yrs | 1,450 USD/oz Au |
| 23 | Springpole Gold Project First Mining Gold Corp. (FF.TO) | Gold | Pre-Feasibility Dec 2025 | $2.10B | 40.8% | $1.10B | 9.4 yrs | 938 USD/oz |
| 24 | Çöpler Project (Initial Assessment MII Case) SSR Mining Inc. (SSRM) | Gold | PEA Sep 2022 | $2.00B | — | $218M | 22 yrs | 924 USD/oz gold |
| 25 | Çöpler Project (Initial Assessment MI Case) SSR Mining Inc. (SSRM) | Gold | PEA Sep 2022 | $1.87B | — | — | 22 yrs | 921 USD/oz gold |
| 26 | White Gold Project White Gold Corp. (WGO.V) | Gold | PEA Aug 2026 | C$1.86B | 40.7% | C$1.00B | 9.4 yrs | 1,482 USD/oz |
| 27 | Toroparu Project Aris Mining Corporation (ARIS.TO) | Gold | PEA Oct 2025 | $1.80B | 25.2% | $820M | 21.3 yrs | 1,300 USD/oz |
| 28 | Çöpler District Master Plan 2021 (Çöpler, Çakmaktepe, Ardich, Bayramdere deposits) SSR Mining Inc. (SSRM) | Gold | Feasibility Sep 2022 | $1.73B | — | — | 21 yrs | 966 USD/oz gold |
| 29 | Ikkari Rupert Resources Ltd. (RUP.TO) | Gold | Pre-Feasibility Feb 2025 | $1.70B | 38% | $575M | 20 yrs | 918 USD/oz |
| 30 | Ikkari (Rupert Resources) Aurion Resources Ltd. (AU.V) | Gold | Pre-Feasibility Feb 2025 | $1.68B | 38% | $575M | — | — |
| 31 | Bankan Gold Project Robex Resources Inc. (RBX.V) | Gold | Feasibility Jun 2025 | $1.64B | 46% | $463M | 12.2 yrs | 1,057 USD/oz |
| 32 | Target Gold Mine Harmony Gold Mining Company (HMY) | Gold | Feasibility Oct 2024 | ZAR 1.52B | — | — | 5 yrs | — |
| 33 | El Dorado–Monserrat (EDM) Fredonia Mining Inc. (FRED.V) | Gold | PEA Aug 2026 | $1.50B | 65% | $346M | 17 yrs | 1,720 USD/oz Au |
| 34 | Salares Norte Gold Fields Limited (GFI) | Gold | Pre-Feasibility Mar 2025 | $1.47B | — | — | 11 yrs | — |
| 35 | Higginsville Expansion (HXP) Westgold Resources Limited (WGX.TO) | Gold | Feasibility | A$1.40B | 43% | A$145M | — | — |
| 36 | Higginsville Hub Expansion (HXP) Westgold Resources Limited (WGX.TO) | Gold | Pre-Feasibility Mar 2026 | A$1.40B | 43% | A$145M | — | — |
| 37 | Camino Rojo Equinox Gold Corp. (EQX.TO) | Gold | Resource Estimate Mar 2026 | $1.30B | 30% | $608M | 17 yrs | 1,304 USD/oz |
| 38 | Camino Rojo Underground (PEA) Equinox Gold Corp. (EQX.TO) | Gold | PEA Mar 2026 | $1.30B | 30% | $608M | 17 yrs | 1,304 USD/oz |
| 39 | Goldfields - Upper Case Fortune Bay Corp. (FOR.V) | Gold | PEA Oct 2025 | C$1.25B | 74% | — | — | — |
| 40 | Porcupine Complex Discovery Silver Corp. (DSV.TO) | Gold | PEA Jan 2025 | $1.20B | — | — | 22 yrs | 1,504 USD/oz |
| 41 | Colomac Gold Project STLLR Gold Inc. (STLR.TO) | Gold | PEA Jun 2023 | C$1.17B | 34.6% | C$654M | 11 yrs | 828 USD/oz |
| 42 | Mt Todd Gold Project Vista Gold Corp. (VGZ) | Gold | Feasibility Mar 2024 | $1.13B | 20.4% | $1.03B | 16 yrs | — |
| 43 | Perron Gold Project Amex Exploration Inc. (AMX.V) | Gold | Feasibility Apr 2026 | C$1.13B | 114.6% | C$194M | 5 yrs | 910 USD/oz |
| 44 | Hemlo Gold Mine Hemlo Mining Corp. (HMMC.V) | Gold | Feasibility Oct 2025 | $1.09B | — | — | 14 yrs | 1,545 USD/oz |
| 45 | Koné Gold Project Montage Gold Corp. (MAU.TO) | Gold | Feasibility Feb 2024 | $1.09B | 31% | $712M | 16 yrs | 998 USD/oz |
| 46 | Casa Berardi Orezone Gold Corporation (ORE.TO) | Gold | PEA Sep 2026 | $1.05B | — | — | 14 yrs | 1,877 USD/oz |
| 47 | Bralorne Gold Project Talisker Resources Ltd. (TSK.TO) | Gold | PEA Sep 2026 | C$1.05B | 31.3% | C$416M | 17.6 yrs | 1,914 USD/oz |
| 48 | Gramalote Project B2Gold Corp. (BTO.TO) | Gold | Feasibility Jul 2025 | $941M | 22.4% | $740M | 13 yrs | 985 USD/oz |
| 49 | Goldfields - Intermediate Case Fortune Bay Corp. (FOR.V) | Gold | PEA Oct 2025 | C$916M | 59% | — | — | — |
| 50 | Fondaway Canyon Getchell Gold Corp. (GTCH.CN) | Gold | PEA Jun 2026 | $905M | 53.1% | $265M | 10.1 yrs | — |
| 51 | CC&V SSR Mining Inc. (SSRM) | Gold | Feasibility Nov 2025 | $824M | — | — | 12 yrs | 2,135 USD/oz |
| 52 | South Railroad Equinox Gold Corp. (EQX.TO) | Gold | Feasibility Feb 2026 | $783M | 48% | $395M | 10 yrs | 1,505 USD/oz Au |
| 53 | Čoka Rakita (Feasibility Study) DPM Metals Corp. (DPM.TO) | Gold | Feasibility Jan 2026 | $782M | 36% | $448M | 10 yrs | 644 USD/oz payable gold |
| 54 | Musselwhite Mine Equinox Gold Corp. (EQX.TO) | Gold | Feasibility Dec 2024 | $782M | — | — | 7 yrs | — |
| 55 | DeLamar Project Integra Resources Corp. (ITR.V) | Gold | Feasibility Feb 2026 | $774M | 46% | $389M | 10 yrs | 1,480 USD/oz AuEq |
| 56 | Koné Gold Project (KGP) Montage Gold Corp. (MAU.TO) | Gold | Feasibility Feb 2022 | $746M | 34.8% | $544M | — | 933 USD/oz |
| 57 | New Amalga Gold Project Grande Portage Resources Ltd. (GPG.V) | Gold | PEA Feb 2026 | $721M | 56% | $255M | 7 yrs | 1,408 USD/oz Au |
| 58 | Fenelon Gold Project Wallbridge Mining Company Limited (WM.TO) | Gold | PEA Mar 2025 | C$706M | 21% | C$579M | 16 yrs | 1,046 USD/oz |
| 59 | Lemhi Gold Project Freeman Gold Corp. (FMAN.V) | Gold | Feasibility Jun 2026 | $696M | 34.4% | $330M | 15 yrs | — |
| 60 | Volta Grande Belo Sun Mining Corp. (BSX.TO) | Gold | Feasibility May 2015 | $665M | 26% | $298M | 17.2 yrs | 779 USD/oz |
| 61 | Enchi Gold Project - Spot Price Case Newcore Gold Ltd. (NCAU.V) | Gold | Pre-Feasibility Jun 2026 | $647M | 45% | $351M | 9.3 yrs | — |
| 62 | Bomboré Phase II Expansion Orezone Gold Corporation (ORE.TO) | Gold | Feasibility Nov 2023 | $636M | — | $168M | — | — |
| 63 | Bomboré Orezone Gold Corporation (ORE.TO) | Gold | Feasibility Nov 2023 | $636M | — | $58M | — | 2,200 USD/oz |
| 64 | Douta Gold Project Thor Explorations Ltd. (THX.V) | Gold | Pre-Feasibility Jan 2026 | $633M | 61% | $254M | 12.6 yrs | 1,890 USD/oz |
| 65 | Waihi District - Alternative Case OceanaGold Corporation (OGC.TO) | Gold | Pre-Feasibility Dec 2024 | $621M | 24% | — | — | — |
| 66 | Mineral Point Open Pit (Ruby Hill) i-80 Gold Corp. (IAU.TO) | Gold | PEA Mar 2025 | $614M | 12% | — | 17 yrs | 1,400 USD/oz |
| 67 | Goldfields Project (Box & Athona) Fortune Bay Corp. (FOR.V) | Gold | PEA Oct 2025 | C$610M | 44% | C$301M | 14 yrs | 1,330 USD/oz |
| 68 | Scottie Gold Mine (Toll Milling Scenario) Scottie Resources Corp. (SCOT.V) | Gold | PEA Oct 2025 | C$606M | 135.2% | — | — | — |
| 69 | Castelo de Sonhos TriStar Gold Inc. (TSG.V) | Gold | Pre-Feasibility May 2025 | $603M | 40% | $296M | 11 yrs | 1,111 USD/oz |
| 70 | Florida Canyon Mine Integra Resources Corp. (ITR.V) | Gold | Feasibility Jul 2026 | $601M | — | — | 8 yrs | 2,331 USD/oz |
| 71 | Duparquet Gold Project First Mining Gold Corp. (FF.TO) | Gold | PEA Oct 2023 | C$588M | 18% | C$706M | 11 yrs | 976 USD/oz |
| 72 | Eau Claire Gold Project Fury Gold Mines Limited (FURY.TO) | Gold | Pre-Feasibility Jun 2026 | C$554M | 41% | C$217M | 11 yrs | 1,140 USD/oz |
| 73 | Eau Claire Project (Eau Claire & Percival) Fury Gold Mines Limited (FURY.TO) | Gold | PEA Sep 2025 | C$554M | 41% | C$217M | 11 yrs | 1,140 USD/oz |
| 74 | Quinchía Gold Project Tiger Gold Corp. (TIGR.V) | Gold | PEA Sep 2025 | $534M | 21.3% | $480M | — | 1,340 USD/oz |
| 75 | O'Brien Gold Project Globex Mining Enterprises Inc. (GMX.TO) | Gold | PEA Aug 2025 | C$532M | 47.6% | C$175M | 11 yrs | 1,058.5 USD/oz |
| 76 | São Jorge GoldMining Inc. (GOLD.TO) | Gold | PEA Jun 2026 | $532M | 42% | $202M | 10.6 yrs | — |
| 77 | Condor Gold Project Silvercorp Metals Inc. (SVM.TO) | Gold | PEA Jan 2026 | $522M | 29% | $292M | 13 yrs | 1,359 USD/EqOz-Payable |
| 78 | Kandiolé Gold Project Roscan Gold Corporation (ROS.V) | Gold | PEA Feb 2026 | $498M | 43% | $219M | 13 yrs | 1,568 USD/oz |
| 79 | Enchi Gold Project Newcore Gold Ltd. (NCAU.V) | Gold | Pre-Feasibility Aug 2026 | $496M | 37% | $351M | 9.3 yrs | 2,290 USD/oz |
| 80 | Beartrack-Arnett Gold Project Revival Gold Inc. (RVG.V) | Gold | Pre-Feasibility Aug 2023 | $484M | — | — | — | — |
| 81 | Shovelnose Westhaven Gold Corp. (WHN.V) | Gold | PEA Apr 2025 | C$454M | 43.2% | C$185M | 11.1 yrs | 836 USD/oz AuEq |
| 82 | Camino Rojo Orla Mining Ltd. (OLA.TO) | Gold | Feasibility Jan 2021 | $452M | 62% | $134M | 10.4 yrs | 543 USD/oz Au |
| 83 | Buckreef Gold Project TRX Gold Corporation (TRX.TO) | Gold | PEA May 2025 | $442M | — | $89M | 17.6 yrs | 1,206 USD/oz |
| 84 | Ana Paula Project Heliostar Metals Ltd. (HSTR.V) | Gold | PEA Nov 2025 | $426M | 28.1% | $300M | 9 yrs | 1,011 USD/oz |
| 85 | Cerro del Gallo Project Heliostar Metals Ltd. (HSTR.V) | Gold | Pre-Feasibility Dec 2025 | $424M | 33.1% | $195M | 15 yrs | 1,390 USD/GEO |
| 86 | Copperstone Project Minera Alamos Inc. (MAI.V) | Gold | Pre-Feasibility Sep 2026 | $421M | 111% | $57M | 6.3 yrs | 1,338 USD/oz |
| 87 | Wind Mountain Bravada Gold Corporation (BVA.V) | Gold | PEA Aug 2026 | $415M | 60% | $98M | 11.2 yrs | 1,653 USD/oz |
| 88 | Cadillac Project (PEA reference on timeline) Cartier Resources Inc. (ECR.V) | Gold | PEA undefined 2022 | C$388M | 21% | — | — | — |
| 89 | Casa Berardi Mine Hecla Mining Company (HL) | Gold | Feasibility Feb 2024 | $356M | — | — | 14 yrs | — |
| 90 | Asanko Gold Mine Galiano Gold Inc. (GAU.TO) | Gold | Feasibility Mar 2023 | $343M | — | $58M | 8.5 yrs | 1,143 USD/oz |
| 91 | Goliath Gold Complex NexGold Mining Corp. (NEXG.V) | Gold | Pre-Feasibility Mar 2023 | C$336M | 25.4% | C$335M | 13 yrs | 1,072 USD/oz |
| 92 | Goldboro Gold Project NexGold Mining Corp. (NEXG.V) | Gold | Feasibility Jan 2022 | C$328M | 25.5% | C$271M | 10.9 yrs | 849 USD/oz |
| 93 | Madsen⚑ Star Royalties Ltd. (STRR.V) | Gold | Pre-Feasibility 2025 | C$315M | 255% | C$44M | 6 yrs | 1,681 USD/oz |
| 94 | Mercur Gold Project Revival Gold Inc. (RVG.V) | Gold | PEA May 2025 | $295M | — | $208M | — | 1,385 USD/oz |
| 95 | Eagle Mountain Gold Project Mako Mining Corp. (MKO.V) | Gold | PEA Mar 2024 | $292M | 57% | — | 15 yrs | 829 USD/oz |
| 96 | Galaxy Gold Mine Golconda Gold Ltd. (GG.V) | Gold | Production | $288M | — | — | 20 yrs | — |
| 97 | Goldfields Fortune Bay Corp. (FOR.V) | Gold | PEA Nov 2022 | C$285M | 35.2% | C$234M | 8.3 yrs | 889 USD/oz Au |
| 98 | Grey Fox McEwen Mining Inc. (MUX.TO) | Gold | Pre-Feasibility Mar 2026 | $282M | 24.8% | $177M | — | — |
| 99 | Cove Underground i-80 Gold Corp. (IAU.TO) | Gold | PEA Mar 2025 | $271M | 30% | — | — | — |
| 100 | Mexican Hat Gold Project GMV Minerals Inc. (GMV.V) | Gold | PEA Sep 2025 | $268M | 50.2% | $90M | 10 yrs | 1,545 USD/oz |
| 101 | La Colorada Mine Heliostar Metals Ltd. (HSTR.V) | Gold | Production 2026 | $243M | 168.4% | $45M | 6 yrs | — |
| 102 | Altan Tsagaan Ovoo Project (ATO) Steppe Gold Ltd. (STGO.TO) | Gold | Feasibility Aug 2022 | $242M | — | $129M | 14 yrs | — |
| 103 | Copperstone Star Royalties Ltd. (STRR.V) | Gold | PEA 2025 | $227M | 170.9% | $36M | 6 yrs | 1,259 USD/oz |
| 104 | Cerro Caliche Gold Project Sonoro Gold Corp. (SGO.V) | Gold | PEA Apr 2026 | $224M | 50% | $83M | 10 yrs | 1,902 USD/oz |
| 105 | Scottie Gold Mine (Blueberry Contact Zone) Scottie Resources Corp. (SCOT.V) | Gold | PEA Oct 2025 | C$216M | 60.3% | C$129M | 7 yrs | — |
| 106 | Back Forty Gold Resource Corporation (GORO) | Gold | PEA Oct 2023 | $214M | 25.7% | $325M | 9 yrs | 920 USD/oz |
| 107 | Doby George Western Exploration Inc. (WEX.V) | Gold | PEA May 2025 | $211M | 62.2% | $115M | 4.2 yrs | 1,197 USD/oz |
| 108 | Fenix Gold Rio2 Limited (RIO.TO) | Gold | Feasibility Oct 2023 | $210M | 28.5% | $117M | 17 yrs | 1,237.1 USD/oz |
| 109 | Zancudo⚑ Star Royalties Ltd. (STRR.V) | Gold | PEA Dec 2025 | $206M | 287% | $15M | 10.3 yrs | 1,059 USD/oz |
| 110 | Sandman Borealis Mining Company Ltd. (BOGO.V) | Gold | PEA 2026 | $203M | 105% | $36M | 9 yrs | 1,823 USD/oz |
| 111 | Romero Project Goldquest Mining Corp. (GQC.V) | Gold | Pre-Feasibility Sep 2016 | $203M | 28.2% | $159M | 8 yrs | 595 USD/oz Au |
| 112 | Nyanzaga Gold Project Perseus Mining Limited (PRU.TO) | Gold | Feasibility Feb 2026 | $202M | 19% | $483M | 16 yrs | 1,650 USD/oz |
| 113 | San Gabriel Project Compania de Minas Buenaventura S.A.A. (BVN) | Gold | Feasibility Apr 2025 | $191M | 21.8% | $177M | 14.2 yrs | 1,568 US$/oz Au |
| 114 | Fox Complex Expansion (IA Mine Plan) McEwen Mining Inc. (MUX.TO) | Gold | PEA Dec 2021 | $175M | — | $438M | 12.3 yrs | 1,223.5 USD/oz |
| 115 | Bayan Khundii Gold Project (BK & Dark Horse Mane) Erdene Resource Development Corp. (ERD.TO) | Gold | Feasibility Aug 2023 | $170M | 35.3% | $100M | 8.5 yrs | — |
| 116 | Tantahuatay Compania de Minas Buenaventura S.A.A. (BVN) | Gold | Resource Estimate Dec 2021 | $157M | — | — | 6 yrs | — |
| 117 | Boroo Steppe Gold Ltd. (STGO.TO) | Gold | Feasibility Feb 2024 | $152M | — | — | 8 yrs | — |
| 118 | Cerro de Oro Project Minera Alamos Inc. (MAI.V) | Gold | PEA Jan 2023 | $151M | — | $28M | 8.2 yrs | 873 USD/oz |
| 119 | South Deep Gold Mine Gold Fields Limited (GFI) | Gold | Feasibility Mar 2025 | $139M | — | — | 85 yrs | — |
| 120 | Waihi District OceanaGold Corporation (OGC.TO) | Gold | Pre-Feasibility Dec 2024 | $138M | 9.2% | $556M | 15 yrs | 994 USD/oz |
| 121 | Fox Complex Expansion Case (Stock West, Grey Fox, Fuller) McEwen Mining Inc. (MUX.TO) | Gold | PEA Dec 2021 | $137M | 21% | — | 9.3 yrs | 1,246 USD/oz |
| 122 | Otjikoto Mine – Antelope Deposit B2Gold Corp. (BTO.TO) | Gold | PEA Feb 2025 | $131M | 35% | $129M | 5 yrs | 1,095 USD/oz |
| 123 | Archimedes Underground (Ruby Hill) i-80 Gold Corp. (IAU.TO) | Gold | PEA Mar 2025 | $127M | 23% | $49M | 10 yrs | 1,893 USD/oz |
| 124 | Fox Complex Expansion (IA Mine Plan Excluding Inferred Mineral Resources) McEwen Mining Inc. (MUX.TO) | Gold | PEA Dec 2021 | $126M | — | $359M | 9.1 yrs | 1,223.6 USD/oz |
| 125 | Rozino Velocity Minerals Ltd. (VLC.V) | Gold | Pre-Feasibility Dec 2021 | $123M | 27.4% | $87M | 7 yrs | 755 USD/oz |
| 126 | Tuvatu Gold Project Lion One Metals Limited (LIO.V) | Gold | PEA Apr 2022 | $122M | 50.9% | $67M | 5 yrs | — |
| 127 | Granite Creek Underground i-80 Gold Corp. (IAU.TO) | Gold | Feasibility Sep 2026 | $118M | — | — | 8.5 yrs | 1,915 USD/oz |
| 128 | Tonopah Gold Project Viva Gold Corp. (VAU.V) | Gold | PEA Aug 2025 | $112M | 17.6% | $220M | 7 yrs | 1,269 USD/oz |
| 129 | Minera Don Nicolas Cerrado Gold Inc. (CERT.V) | Gold | PEA Sep 2024 | $111M | — | $0M | 5 yrs | 1,146 USD/oz |
| 130 | Beartrack-Arnett Heap Leach Project Revival Gold Inc. (RVG.V) | Gold | Pre-Feasibility Jun 2023 | $105M | 24.3% | $109M | 8.1 yrs | 1,235 USD/oz |
| 131 | Soledad Mountain Andean Precious Metals Corp. (APM.TO) | Gold | Feasibility Jan 2024 | $102M | — | — | 5 yrs | — |
| 132 | Fox Complex Expansion Case Excluding Inferred Mineral Resources McEwen Mining Inc. (MUX.TO) | Gold | PEA Dec 2021 | $100M | 31.4% | — | 6.1 yrs | 1,238 USD/oz |
| 133 | Seabee Gold Operation SSR Mining Inc. (SSRM) | Gold | Production Feb 2024 | $95M | — | — | 4.2 yrs | 2,231 USD/oz |
| 134 | Seabee Gold Operation (Santoy Mine & Porky West) SSR Mining Inc. (SSRM) | Gold | Feasibility Feb 2024 | $95M | — | — | 4.2 yrs | — |
| 135 | Seabee Gold Operation (Santoy Mine and Porky West) SSR Mining Inc. (SSRM) | Gold | Production Feb 2024 | $95M | — | — | 4.2 yrs | — |
| 136 | San Jose de Gracia Mine DynaResource Inc. (DYNR) | Gold | Feasibility Mar 2025 | $84M | — | — | 7 yrs | 1,720 USD/oz AuEq |
| 137 | Cuiú Cuiú - Stage 1 Gold-in-Oxide Heap Leach Cabral Gold Inc. (CBR.V) | Gold | Pre-Feasibility Jul 2025 | $74M | 78% | $38M | 6.2 yrs | 1,210 USD/oz |
| 138 | Cuiú Cuiú Gold District Cabral Gold Inc. (CBR.V) | Gold | Pre-Feasibility Jul 2025 | $74M | 77.8% | $38M | 6.2 yrs | 1,209.9 USD/oz Au |
| 139 | La Fortuna Minera Alamos Inc. (MAI.V) | Gold | PEA Jul 2018 | $70M | 93% | $27M | 5 yrs | 440 USD/oz |
| 140 | Senegal Mali Shear Zone (SMSZ) Project Desert Gold Ventures Inc. (DAU.V) | Gold | PEA Jan 2026 | $61M | 57% | $20M | 10 yrs | 1,137 USD/oz |
| 141 | Taguas Project (Cerro Taguas Oxides) Orvana Minerals Corp. (ORV.TO) | Gold | PEA Dec 2021 | $57M | 20.2% | $141M | 9.2 yrs | — |
| 142 | El Bagre Gold Mining Complex (Cordero Mine) Soma Gold Corp. (SOMA.V) | Gold | PEA Jan 2023 | C$56M | — | — | 3.2 yrs | 1,418 C$/oz |
| 143 | Sissingué Gold Project Perseus Mining Limited (PRU.TO) | Gold | Feasibility May 2015 | $53M | 27% | $106M | 5.3 yrs | 632 USD/oz |
| 144 | PL Gold Mine (PL Mine) Minnova Corp. (MCI.V) | Gold | Feasibility 2017 | $37M | 53% | — | 5 yrs | — |
| 145 | PL Gold Mine Minnova Corp. (MCI.V) | Gold | Feasibility Nov 2017 | C$37M | 53% | C$35M | 5 yrs | 942 USD/oz |
| 146 | San Agustin Mine⚑ Heliostar Metals Ltd. (HSTR.V) | Gold | Production 2026 | $35M | 548% | $40M | 1.2 yrs | 2,150 USD/oz Au |
| 147 | Kinsley Mountain Gold Project CopAur Minerals Inc. (CPAU.V) | Gold | PEA Jul 2026 | $35M | 19.7% | $82M | 4 yrs | 1,861 USD/oz |
| 148 | Sierra Antapite Mine Empress Royalty Corp. (EMPR.V) | Gold | Production Sep 2026 | $28M | — | $10M | — | — |
| 149 | SMSZ Project Desert Gold Ventures Inc. (DAU.V) | Gold | PEA Aug 2025 | $24M | 34% | $4M | — | 1,352 USD/oz |
| 150 | Galaxy Mine Empress Royalty Corp. (EMPR.V) | Gold | Production Sep 2026 | $15M | — | $5M | — | — |
| 151 | Terakimti Oxide Deposit, Harvest Project East Africa Metals Inc. (EAM.V) | Gold | PEA Oct 2015 | $13M | 30.1% | $17M | 4 yrs | — |
| 152 | Da Tambuk East Africa Metals Inc. (EAM.V) | Gold | PEA Apr 2018 | $13M | 28.6% | $34M | — | — |
| 153 | San Agustin Mine (PEA case from Technical Report Highlights) Heliostar Metals Ltd. (HSTR.V) | Gold | Feasibility Nov 2024 | $12M | 156% | $40M | — | 1,990 USD/GEO |
| 154 | Manica Mine Empress Royalty Corp. (EMPR.V) | Gold | Production Sep 2026 | $7M | — | $3M | — | — |
| 155 | Orcopampa Compania de Minas Buenaventura S.A.A. (BVN) | Gold | Feasibility May 2022 | $-30M | — | — | 3 yrs | 1,242 USD/oz Au |
| 156 | Bayan Khundii Erdene Resource Development Corp. (ERD.TO) | Gold | Feasibility 2023 | — | — | $115M | 6 yrs | — |
| 157 | Tulkubash Silvercorp Metals Inc. (SVM.TO) | Gold | Feasibility Jul 2026 | — | — | $166M | 3.5 yrs | — |
| 158 | Greenstone Mine Equinox Gold Corp. (EQX.TO) | Gold | Feasibility Mar 2026 | — | — | $80M | 14 yrs | — |
| 159 | Oko West G Mining Ventures Corp. (GMIN.TO) | Gold | Feasibility Apr 2025 | — | — | $973M | 10 yrs | — |
| 160 | Northparkes Triple Flag Precious Metals Corp. (TFPM.TO) | Gold | Production Mar 2022 | — | — | $84M | — | — |
| 161 | Blackwater Mine Artemis Gold Inc. (ARTG.V) | Gold | Production | — | — | C$1.44B | — | — |
| 162 | Edikan Gold Mine (Esuajah South) Perseus Mining Limited (PRU.TO) | Gold | Feasibility Jan 2021 | — | — | $38M | — | — |
| 163 | Bomboré (Existing Phase I) Orezone Gold Corporation (ORE.TO) | Gold | Production Nov 2023 | — | — | $169M | — | — |
| 164 | Livengood Gold Project International Tower Hill Mines Ltd. (ITH.TO) | Gold | Pre-Feasibility 2023 | — | — | $1.93B | 21 yrs | 1,171 USD/oz |
| 165 | San Antonio Project Heliostar Metals Ltd. (HSTR.V) | Gold | PEA Nov 2024 | — | — | $131M | 14 yrs | 1,063 $/oz |
| 166 | Senegal Pilot Plant Dynacor Group Inc. (DNG.TO) | Gold | — | — | — | $25M | — | — |
| 167 | Imwelo Development Project Lake Victoria Gold Ltd. (LVG.V) | Gold | Pre-Feasibility | — | — | $15M | — | 1,500 USD/oz |
| 168 | Vila Nova Tailings Operation JZR Gold Inc. (JZR.V) | Gold | PEA | — | — | $7M | — | — |
| 169 | Fenix Project - Phase 1 (Gold) McEwen Mining Inc. (MUX.TO) | Gold | Feasibility Feb 2021 | — | — | $42M | 6 yrs | 1,045 USD/oz Au |
| 170 | Consolidated (Mineros S.A.) Mineros S.A. (MSA.TO) | Gold | Production 2026 | — | — | $114M | — | 2,420 USD/oz Au |
| 171 | Golden Chest Mine Idaho Strategic Resources, Inc. (IDR) | Gold | Feasibility Dec 2025 | — | — | $31M | 6 yrs | — |
| 172 | Chamé target Jaguar Mining Inc. (JAG.TO) | Gold | — | — | — | $43M | — | — |
| 173 | South Carlin Complex (South Railroad) Equinox Gold Corp. (EQX.TO) | Gold | Feasibility Feb 2026 | — | — | $395M | — | — |
| 174 | Sugar Zone Vox Royalty Corp. (VOXR.TO) | Gold | Production | — | — | $55M | — | — |
| 175 | Blackwater Mine - Phase 1A Expansion Artemis Gold Inc. (ARTG.V) | Gold | — 2026 | — | — | C$110M | — | — |
| 176 | Blackwater Mine - EP2 Expansion Artemis Gold Inc. (ARTG.V) | Gold | — Dec 2025 | — | — | C$1.44B | — | — |
| 177 | Valentine Orla Mining Ltd. (OLA.TO) | Gold | Feasibility | — | — | $414M | 11 yrs | — |
| 178 | Joel Mine Harmony Gold Mining Company (HMY) | Gold | Production Jul 2022 | — | — | ZAR 726M | 8 yrs | — |
| 179 | KCGM Northern Star Resources (NST.AX) | Gold | Production Sep 2026 | — | — | A$1.75B | — | — |
| 180 | Ravenswood Gold Mine Triple Flag Precious Metals Corp. (TFPM.TO) | Gold | Production | — | — | $440M | — | — |
| 181 | Carlin Complex Iconic Minerals Ltd. (ICM.V) | Gold | Resource Estimate Mar 2025 | — | — | $2.43B | 20 yrs | — |
| 182 | Katanning Gold Project OceanaGold Corporation (OGC.TO) | Gold | Pre-Feasibility Aug 2026 | — | — | $251M | 10 yrs | — |
| 183 | AurMac Project (exploration program) Orogen Royalties Inc. (OGN.V) | Gold | Resource Estimate May 2026 | — | — | $15M | — | — |
| 184 | Stibnite Gold Project (Perpetua Resources) - regional context Legacy Gold Mines Inc. (LEGY.V) | Gold | Production | — | — | $2.60B | 15 yrs | — |
| 185 | Blackwater (Expanded Phase 2 - EP2) Artemis Gold Inc. (ARTG.V) | Gold | Production Dec 2025 | — | — | C$1.44B | — | — |
Figures are automatically extracted from company filings and presentations and reflect the most recent disclosure found — they may contain errors. Always verify against the original source document before making any investment decision. Back to all project economics.