Silvercorp Metals Inc.
Price History
Loading chart...
About Silvercorp Metals Inc.
Silvercorp Metals Inc. (SVM.TO) is a silver mining company listed on the Toronto Stock Exchange (TSX). Our project database tracks 29 projects for Silvercorp Metals Inc. with technical and economic data extracted from company filings. Its flagship Ying Ag-Pb-Zn-Au Property (Feasibility) carries an after-tax NPV of $1.03B.
Silvercorp Metals is a silver-gold-lead-zinc producer operating in China's Ying Mining District in Henan Province with multiple operating mines. The company has established a long-term mining operation in one of China's largest polymetallic mining regions.
Primary Commodities
Project Economics
Ying Mining District
- Mineral Reserves
- Proven+Probable: 12.76 Mt @ 216 g/t Ag, 0.17 g/t Au, 3.20% Pb, 0.96% Zn = 89 Moz Ag, 71 koz Au, 408 kt Pb, 123 kt Zn
- Mineral Resources
- Measured+Indicated: 22.15 Mt @ 203 g/t Ag, 0.20 g/t Au, 3.06% Pb, 0.87% Zn = 144 Moz Ag, 143 koz Au, 677 kt Pb, 192 kt Zn; Inferred: 8.80 Mt @ 187 g/t Ag, 0.56 g/t Au, 2.96% Pb, 0.64% Zn = 53 Moz Ag, 158 koz Au, 260 kt Pb, 56 kt Zn
GC Mine
- Mineral Reserves
- Proven+Probable: 4.97 Mt @ 81 g/t Ag, 1.21% Pb, 2.84% Zn = 13 Moz Ag, 60 kt Pb, 141 kt Zn
- Mineral Resources
- Measured+Indicated: 11.49 Mt @ 84 g/t Ag, 1.18% Pb, 2.85% Zn = 31 Moz Ag, 135 kt Pb, 327 kt Zn; Inferred: 9.57 Mt @ 85 g/t Ag, 1.23% Pb, 2.44% Zn = 26 Moz Ag, 117 kt Pb, 234 kt Zn
Condor Gold Project
- Mineral Resources
- Underground Indicated: 10.15 Mt at 2.30 g/t AuEq (1.90 g/t Au, 13.66 g/t Ag, 0.05% Pb, 0.50% Zn) containing 748.9 koz AuEq, 620 koz Au, 4,456 koz Ag; Inferred: 30.10 Mt at 2.49 g/t AuEq (2.03 g/t Au, 14.31 g/t Ag, 0.06% Pb, 0.57% Zn) containing 2,406 koz AuEq, 1,969 koz Au, 13,846 koz Ag. Open pit resources also reported but not detailed in summary tables shown.
Tulkubash
- Mineral Resources
- Measured: 7.35 Mt @ 1.61 g/t Au, 1.38 g/t Ag (380.5 koz Au, 327.0 koz Ag); Indicated: 1.28 Mt @ 1.99 g/t Au, 1.45 g/t Ag (81.7 koz Au, 59.6 koz Ag); M+I: 8.63 Mt @ 1.67 g/t Au, 1.39 g/t Ag (462.2 koz Au, 386.6 koz Ag); Inferred: 0.01 Mt @ 1.29 g/t Au, 0.58 g/t Ag (0.5 koz Au, 0.2 koz Ag)
Santa Barbara
- Mineral Resources
- Indicated: 30 Mt @ 0.73 g/t Au, 0.1% Cu = 697 koz Au, 68 Mlb Cu; Inferred: 206 Mt @ 0.52 g/t Au, 0.1% Cu = 3,418 koz Au, 426 Mlb Cu
Ying - SGX Mine
- Mineral Reserves
- P&P: 7.24 Mt @ 0.04 g/t Au, 200 g/t Ag, 3.87% Pb, 1.81% Zn; containing 9.6 koz Au, 46.5 Moz Ag, 280.2 kt Pb, 131.4 kt Zn
Ying - HZG Mine
- Mineral Reserves
- P&P: 1.09 Mt @ 198 g/t Ag, 0.69% Pb, 0.28% Zn; containing 6.9 Moz Ag, 7.5 kt Pb, 3.0 kt Zn
Ying - HPG Mine
- Mineral Reserves
- P&P: 1.35 Mt @ 0.99 g/t Au, 62 g/t Ag, 2.48% Pb, 0.65% Zn, 0.07% Cu; containing 42.8 koz Au, 2.7 Moz Ag, 33.5 kt Pb, 8.7 kt Zn, 0.9 kt Cu
Ying Ag-Pb-Zn-Au Property
- Mineral Reserves
- Total P&P: 45% of M&I resource tonnes. See individual mine breakdowns - SGX 7.24 Mt, HZG 1.09 Mt, HPG 1.35 Mt, and others (TLP, LME, LMW, DCG, KP) - total approximately 16.1 Mt (sum of individual mines from Table 1.2 partial data)
- Mineral Resources
- Mineral Resources as of 31 December 2025 reported in Table 1.1 (not fully shown). Total M&I contained metals: Au +62%, Ag +37%, Pb +39%, Zn +48% vs prior estimate.
Gaocheng Silver-Lead-Zinc Project
Kyzyltash (Chaarat Gold Project)
- Mineral Resources
- Measured: 3.27 Mt @ 2.70 g/t Au, 2.58 g/t Ag (271.2 koz Au, 836.0 koz Ag); Indicated: 47.04 Mt @ 2.76 g/t Au, 2.43 g/t Ag (3,670.7 koz Au, 13,548.8 koz Ag); Total M+I: 50.31 Mt @ 2.69 g/t Au, 2.44 g/t Ag (3,941.9 koz Au, 14,384.8 koz Ag); Inferred: 21.36 Mt @ 2.76 g/t Au, 2.30 g/t Ag (1,576.8 koz Au, 5,947.9 koz Ag)
Tulkubash (Chaarat Gold Project)
- Mineral Resources
- Measured: 7.35 Mt @ 1.61 g/t Au, 1.38 g/t Ag (380.5 koz Au, 327.0 koz Ag); Indicated: 1.28 Mt @ 1.99 g/t Au, 1.45 g/t Ag (81.7 koz Au, 59.6 koz Ag); Total M+I: 8.63 Mt @ 1.67 g/t Au, 1.39 g/t Ag (462.2 koz Au, 386.6 koz Ag); Inferred: 0.01 Mt @ 1.29 g/t Au, 0.58 g/t Ag (0.5 koz Au, 0.2 koz Ag)
Kyzyltash Gold Project
- Mineral Resources
- Measured: 3.27 Mt @ 2.70 g/t Au, 2.58 g/t Ag (271.2 koz Au, 836.0 koz Ag); Indicated: 47.04 Mt @ 2.76 g/t Au, 2.43 g/t Ag (3,670.7 koz Au, 13,548.8 koz Ag); M+I: 50.31 Mt @ 2.69 g/t Au, 2.44 g/t Ag (3,941.9 koz Au, 14,384.8 koz Ag); Inferred: 21.36 Mt @ 2.76 g/t Au, 2.30 g/t Ag (1,576.8 koz Au, 5,947.9 koz Ag)
Condor Project - Soledad
- Mineral Resources
- Indicated: 4.03 Mt @ 1.14 g/t AuEq (1.06 g/t Au, 7.05 g/t Ag, 0.05% Pb, 0.56% Zn) containing 148 koz AuEq, 138 koz Au, 912 koz Ag; Inferred: 14.15 Mt @ 0.83 g/t AuEq (0.76 g/t Au, 5.86 g/t Ag, 0.04% Pb, 0.51% Zn) containing 375 koz AuEq, 346 koz Au, 2,664 koz Ag
Condor Project - Los Cuyes
- Mineral Resources
- Indicated: 0.72 Mt @ 4.04 g/t AuEq (3.82 g/t Au, 22.9 g/t Ag, 0.09% Pb, 0.63% Zn) containing 93 koz AuEq, 88 koz Au, 528 koz Ag; Inferred: 4.2 Mt @ 4.71 g/t AuEq (4.47 g/t Au, 24.64 g/t Ag, 0.12% Pb, 0.53% Zn) containing 636 koz AuEq, 603 koz Au, 3,327 koz Ag
Condor Project - Enma
- Mineral Resources
- Indicated: 0.03 Mt @ 1.05 g/t AuEq (0.97 g/t Au, 7.11 g/t Ag, 0.07% Pb, 0.30% Zn) containing 1 koz AuEq, 1 koz Au, 7 koz Ag; Inferred: 0.02 Mt @ 0.74 g/t AuEq (0.56 g/t Au, 16.07 g/t Ag, 0.06% Pb, 0.20% Zn) containing 1 koz AuEq, 0 koz Au, 12 koz Ag
Condor Project - Camp
- Mineral Resources
- Indicated: 2.45 Mt @ 3.44 g/t AuEq (3.17 g/t Au, 18.68 g/t Ag, 0.08% Pb, 0.73% Zn) containing 271 koz AuEq, 250 koz Au, 1,471 koz Ag; Inferred: 7.9 Mt @ 3.38 g/t AuEq (3.07 g/t Au, 20.59 g/t Ag, 0.08% Pb, 0.89% Zn) containing 859 koz AuEq, 780 koz Au, 5,229 koz Ag
HZG
BYP Mine
- Mineral Resources
- Measured+Indicated (Au area): 5.10 Mt @ 2.8 g/t Au = 456 koz Au; Inferred (Au area): 1.60 Mt @ 2.2 g/t Au = 116 koz Au; Indicated (Pb-Zn area): 3.80 Mt @ 0.6% Pb, 2.3% Zn; Inferred (Pb-Zn area): 2.80 Mt @ 0.7% Pb, 2.5% Zn
LME
LMW
HPG
SGX
TLP
DCG
Ying Ag-Pb-Zn Property
Silver Sand
Carangas
El Domo
- Mineral Reserves
- Proven+Probable: 6.5 Mt @ 1.93% Cu, 0.25% Pb, 2.49% Zn, 2.52 g/t Au, 46 g/t Ag = 124.9 kt Cu, 525 koz Au, 9,517 koz Ag
- Mineral Resources
- Measured+Indicated: 7.1 Mt @ 1.95% Cu, 0.3% Pb, 2.64% Zn, 2.63 g/t Au, 49 g/t Ag = 137.5 kt Cu, 596 koz Au, 11,074 koz Ag; Inferred: 0.3 Mt @ 0.34% Cu, 0.2% Pb, 1.01% Zn, 1.34 g/t Au, 39 g/t Ag
- Royalties / Streams
- 2% NSR to Altius; 4% Ecuador government royalty
Project figures are automatically extracted from company filings and presentations and reflect the most recent disclosure found. They may contain errors — always verify against the linked source document.
Financial Metrics
Loading financial data...
Frequently Asked Questions
- What does Silvercorp Metals Inc. mine?
- Silvercorp Metals Inc. is focused on Silver.
- What is the economic value of Silvercorp Metals Inc.'s Ying Ag-Pb-Zn-Au Property?
- According to its Feasibility, Ying Ag-Pb-Zn-Au Property has an after-tax NPV of $1.03B.
- What exchange is Silvercorp Metals Inc. listed on?
- Silvercorp Metals Inc. trades under the ticker SVM.TO on the Toronto Stock Exchange (TSX).
- How many projects does Silvercorp Metals Inc. have?
- We track 29 projects with extracted technical and economic data for Silvercorp Metals Inc.
Project Analysis
Ying Ag-Pb-Zn-Au Property Feasibility Study: $1.03B NPV
Silvercorp Metals Inc.'s Ying Ag-Pb-Zn-Au Property in Henan Province, People's Republic of China has a Feasibility Study outlining an after-tax NPV of $1.03B.
Carangas PEA: $501M NPV, 26% IRR
Silvercorp Metals Inc.'s Carangas in Bolivia has a Preliminary Economic Assessment (PEA) outlining an after-tax NPV of $501M, an after-tax IRR of 26%, and initial capital of $324M. The proposed mine plan runs 16 years.
Silver Sand PFS: $740M NPV, 37% IRR
Silvercorp Metals Inc.'s Silver Sand in Bolivia has a Pre-Feasibility Study (PFS) outlining an after-tax NPV of $740M, an after-tax IRR of 37%, and initial capital of $358M. The mine plan runs 13 years at about 12 Moz Ag per year.
Tulkubash Feasibility Study: $150M Capex Over a 3.5-Year Mine Life
Silvercorp Metals Inc.'s Tulkubash in Kyrgyzstan has a Feasibility Study outlining initial capital of $150M. The mine plan runs 3.5 years at about 110 koz Au per year.
El Domo Feasibility Study: $259M NPV, 32% IRR
Silvercorp Metals Inc.'s El Domo in Ecuador has a Feasibility Study outlining an after-tax NPV of $259M, an after-tax IRR of 32%, and initial capital of $284M. The proposed mine plan runs 10 years.
Quick Facts
- Ticker Symbol
- SVM.TO
- Market Cap
- Small Cap
- Category
- Silver
- Commodities
- Silver
This information is for educational purposes only and does not constitute investment advice. Always conduct your own research before making investment decisions.