About Minera Alamos Inc.
Minera Alamos Inc. (MAI.V) is a gold mining company listed on the TSX Venture Exchange (TSXV). Our project database tracks 11 projects for Minera Alamos Inc. with technical and economic data extracted from company filings. Its flagship Copperstone Project (Pre-Feasibility) carries an after-tax NPV of $421M and an IRR of 111% over a 6.3-year mine life.
Minera Alamos owns and develops gold projects in Mexico, including the Santana mine in Sonora which achieved commercial production. The company is advancing its portfolio of heap-leach gold projects toward production in Mexico's prolific gold belt.
Primary Commodities
Project Economics
Copperstone Project
- Mineral Reserves
- Total Proven & Probable: 1,934 kt at 4.87 g/t Au containing 303 koz Au
- Mineral Resources
- Total M&I: 4,054 kt at 4.83 g/t Au containing 630 koz Au; Inferred: 401 kt at 4.04 g/t Au containing 52 koz Au
Pan Operating Complex
- Mineral Reserves
- P&P Reserves 2025: 222 koz at 0.32 g/t
- Mineral Resources
- M&I Resources (incl. P&P): 240 koz at 0.33 g/t; Plus additional 33 koz of recoverable heap leach inventory
Pan Mine (Pan Operating Complex)
- Mineral Reserves
- P&P Reserves 2025: 222 koz at 0.32 g/t
- Mineral Resources
- M&I Resources (incl. P&P): 240 koz at 0.33 g/t; Plus additional 33 koz of recoverable heap leach inventory
Santana Project
Pan Mine
- Mineral Reserves
- 222 koz at 0.32 g/t Au (Proven & Probable)
- Mineral Resources
- 240 koz at 0.33 g/t Au (Measured & Indicated, incl. P&P); plus 33 koz recoverable heap leach inventory
Cerro de Oro Project
- Mineral Resources
- Inferred MRE at $1,600/oz Au: 67 Mt grading 0.37 g/t Au containing 790 koz Au; Inferred MRE at $1,900/oz Au: 78 Mt grading 0.35 g/t Au containing 865 koz Au
- Royalties / Streams
- None stated
Gold Rock Project
- Mineral Resources
- Indicated resource of 403 koz at 0.66 g/t Au; Inferred resource of 84 koz at 0.87 g/t Au
La Fortuna
- Mineral Resources
- Measured & Indicated: 3,469,700 t at 2.78 g/t Au, 16.5 g/t Ag, 0.22% Cu for 309,800 oz Au, 1,842,200 oz Ag, 7,600 t Cu; Inferred: 156,300 t at 1.72 g/t Au, 8.5 g/t Ag, 0.09% Cu for 8,600 oz Au, 42,700 oz Ag, 100 t Cu
Los Verdes Cu/Mo Project
Project figures are automatically extracted from company filings and presentations and reflect the most recent disclosure found. They may contain errors — always verify against the linked source document.
How the Economics Evolved
Gold Rock Project
4 studies on recordCerro de Oro Project
4 studies on recordPan Mine (Pan Operating Complex)
2 studies on recordCopperstone Project
4 studies on recordEconomics as disclosed in each successive study. NPV shown in US$ where a currency conversion is available (at each study's own period rate), else in the study's stated currency. Verify against the source filings.
Find the best mining projects
Be the first to know about new mining results, and how they compare to other projects.
Financial Metrics
Loading financial data...
Frequently Asked Questions
- What does Minera Alamos Inc. mine?
- Minera Alamos Inc. is focused on Gold.
- What is the economic value of Minera Alamos Inc.'s Copperstone Project?
- According to its Pre-Feasibility, Copperstone Project has an after-tax NPV of $421M and an IRR of 111%.
- What exchange is Minera Alamos Inc. listed on?
- Minera Alamos Inc. trades under the ticker MAI.V on the TSX Venture Exchange (TSXV).
- How many projects does Minera Alamos Inc. have?
- We track 11 projects with extracted technical and economic data for Minera Alamos Inc.
Project Analysis
Pan Mine (Pan Operating Complex) Production Update: $197M NPV
Minera Alamos Inc.'s Pan Mine (Pan Operating Complex) in Nevada, USA has a production guidance outlining a pre-tax NPV of $197M.
Cerro de Oro Project PEA: $151M NPV, $28M Capex
Minera Alamos Inc.'s Cerro de Oro Project in Zacatecas, Mexico has a Preliminary Economic Assessment (PEA) outlining an after-tax NPV of $151M and initial capital of $28M. The mine plan runs 8.2 years at about 58 koz Au per year.
Copperstone Project PFS: $421M NPV, 111% IRR
Minera Alamos Inc.'s Copperstone Project in La Paz County, Arizona, USA has a Pre-Feasibility Study (PFS) outlining an after-tax NPV of $421M, an after-tax IRR of 111%, and initial capital of $57M. The mine plan runs 6.3 years at about 46 koz Au per year.
Gold Rock Project PEA: $610M NPV Over a 6.5-Year Mine Life
Minera Alamos Inc.'s Gold Rock Project in Nevada, USA has a Preliminary Economic Assessment (PEA) outlining a pre-tax NPV of $610M. The mine plan runs 6.5 years at about 55 koz Au per year.
Quick Facts
- Ticker Symbol
- MAI.V
- Market Cap
- Small Cap
- Category
- Gold
- Commodities
- Gold
This information is for educational purposes only and does not constitute investment advice. Always conduct your own research before making investment decisions.