NexGold Mining Corp.
Price History
Loading chart...
About NexGold Mining Corp.
NexGold Mining Corp. (NEXG.V) is a gold mining company listed on the TSX Venture Exchange (TSXV). Our project database tracks 4 projects for NexGold Mining Corp. with technical and economic data extracted from company filings. Its flagship Goliath Gold Complex (Pre-Feasibility) carries an after-tax NPV of C$336M and an IRR of 25.4% over a 13-year mine life.
NexGold Mining is developing the Goliath Gold Complex in northwestern Ontario, featuring substantial bulk-tonnage open-pit mineralization with established access and infrastructure. The company is conducting engineering and environmental assessments to advance the project toward production.
Primary Commodities
Project Economics
Niblack Project
- Mineral Resources
- Indicated 5,851,000 t @ 0.94% Cu, 1.83 g/t Au, 29.0 g/t Ag; Inferred 214,000 t @ 0.93% Cu, 1.52 g/t Au, 18.0 g/t Ag
Niblack Polymetallic Project
- Mineral Resources
- Indicated: 5,851,000 t @ 0.94% Cu, 1.83 g/t Au, 29.0 g/t Ag, 1.73% Zn for 120.7 Mlb Cu, 345,800 oz Au, 5,462,000 oz Ag, 222.6 Mlb Zn; Inferred: 214,000 t @ 0.93% Cu, 1.52 g/t Au, 18.0 g/t Ag, 1.38% Zn for 4.4 Mlb Cu, 10,400 oz Au, 125,000 oz Ag, 6.5 Mlb Zn
Goliath Gold Complex
- Mineral Resources
- M&I: 67,711,000 t @ 0.98 g/t Au (and 3.42 g/t Ag) for 2,139,000 oz Au (3,522,000 oz Ag); Inferred: 32,571,000 t @ 0.75 g/t Au for 783,000 oz Au
Goldboro Gold Project
- Mineral Resources
- M&I: 21,593,000 t @ 3.72 g/t Au for 2,581,000 oz Au; Inferred: 3,181,000 t @ 4.73 g/t Au for 484,000 oz Au
Project figures are automatically extracted from company filings and presentations and reflect the most recent disclosure found. They may contain errors — always verify against the linked source document.
How the Economics Evolved
Goldboro Gold Project
2 studies on recordGoliath Gold Complex
2 studies on recordEconomics as disclosed in each successive study. NPV shown in US$ where a currency conversion is available (at each study's own period rate), else in the study's stated currency. Verify against the source filings.
Find the best mining projects
Be the first to know about new mining results, and how they compare to other projects.
Financial Metrics
Loading financial data...
Frequently Asked Questions
- What does NexGold Mining Corp. mine?
- NexGold Mining Corp. is focused on Gold.
- What is the economic value of NexGold Mining Corp.'s Goliath Gold Complex?
- According to its Pre-Feasibility, Goliath Gold Complex has an after-tax NPV of C$336M and an IRR of 25.4%.
- What exchange is NexGold Mining Corp. listed on?
- NexGold Mining Corp. trades under the ticker NEXG.V on the TSX Venture Exchange (TSXV).
- How many projects does NexGold Mining Corp. have?
- We track 4 projects with extracted technical and economic data for NexGold Mining Corp.
Project Analysis
Goliath Gold Complex PFS: C$336M NPV, 25.4% IRR
NexGold Mining Corp.'s Goliath Gold Complex in Ontario, Canada (Dryden) has a Pre-Feasibility Study (PFS) outlining an after-tax NPV of C$336M, an after-tax IRR of 25.4%, and initial capital of C$335M. The mine plan runs 13 years at about 90 koz Au per year.
Goldboro Gold Project Feasibility Study: C$328M NPV, 25.5% IRR
NexGold Mining Corp.'s Goldboro Gold Project in Nova Scotia, Canada has a Feasibility Study outlining an after-tax NPV of C$328M, an after-tax IRR of 25.5%, and initial capital of C$271M. The mine plan runs 10.9 years at about 100 koz Au per year.
Quick Facts
- Ticker Symbol
- NEXG.V
- Market Cap
- Small Cap
- Category
- Gold
- Commodities
- Gold
This information is for educational purposes only and does not constitute investment advice. Always conduct your own research before making investment decisions.