Compania de Minas Buenaventura S.A.A.
Price History
Loading chart...
About Compania de Minas Buenaventura S.A.A.
Compania de Minas Buenaventura S.A.A. (BVN) is a gold mining company. Our project database tracks 20 projects for Compania de Minas Buenaventura S.A.A. with technical and economic data extracted from company filings. Its flagship El Brocal (Resource Estimate) carries an after-tax NPV of $619M over a 17-year mine life.
Compañía de Minas Buenaventura is Peru's largest publicly traded precious metals company, operating seven mines producing gold, silver, and base metals — including Orcopampa, Tambomayo, and Julcani — while holding a 19.58% stake in the Cerro Verde copper mine operated by Freeport-McMoRan. The company achieved nine-month 2024 EBITDA of $333.8 million and commissioned the new San Gabriel gold mine in Moquegua during 2024.'s largest publicly traded precious metals company, operating seven mines producing gold, silver, and base metals — including Orcopampa, Tambomayo, and Julcani — while holding a 19.58% stake in the Cerro Verde copper mine operated by Freeport-McMoRan. The company achieved nine-month 2024 EBITDA of $33.8 million and commissioned the new San Gabriel gold mine in Moquegua during 2024.
Primary Commodities
Project Economics
Coimolache Sulfides
Coimolache (Tantahuatay)
Uchucchacua & Yumpag
- Mineral Reserves
- Included in consolidated reserves. 183 MOz Ag (2025 preliminary estimate).
San Gabriel Project
- Mineral Reserves
- Proven & Probable: 15,305 kt (15.3 Mt) at 3.71 g/t Au and 6.32 g/t Ag, containing 1,827 koz Au and 3,107 koz Ag
- Mineral Resources
- Measured + Indicated: 7,763 kt at 2.36 g/t Au and 7.64 g/t Ag, containing 588 koz Au and 1,907 koz Ag; Inferred: 7,049 kt at 3.23 g/t Au and 7.34 g/t Ag, containing 733 koz Au and 1,664 koz Ag
- Royalties / Streams
- 1.5% NSR royalty to Gold Fields S.A.; Mining Tax Royalty LOM average rate 4.2%; Special Mining Tax (IEM) LOM average rate 2.6%
El Brocal
- Mineral Reserves
- OP P&P 6,702 kt @ 0.52% Pb, 1.07% Zn, 1.57% Cu, 75.87 g/t Ag; UG P&P 74,651 kt @ 1.22% Cu, 19.60 g/t Ag, 0.59 g/t Au
- Mineral Resources
- OP M&I 954 kt @ 0.36% Pb, 0.43% Zn, 1.29% Cu, 54.4 g/t Ag; UG M&I 32,909 kt @ 0.88% Cu, 15.7 g/t Ag, 0.44 g/t Au
Cerro Verde Mine
- Mineral Reserves
- Total Reserves (100%): 4,577 M Tons, 0.35% Cu, 0.01% Mo, 1.52 g/t Ag; recoverable metal 25,249 M lbs Cu, 657 M lbs Mo, 100,181 k ozs Ag. Net to BV (19.58%): 896 M Tons, 0.35% Cu; 4,944 M lbs Cu, 129 M lbs Mo, 19,615 k ozs Ag.
- Mineral Resources
- Total Resources (100%): 2,451 M Tons, 0.32% Cu, 0.01% Mo, 1.70 g/t Ag; contained metal 17,463 M lbs Cu, 628 M lbs Mo, 133,762 k ozs Ag. Net to BV (19.58%): 480 M Tons, 0.32% Cu; 3,419 M lbs Cu, 123 M lbs Mo, 26,191 k ozs Ag.
Coimolache Mine
- Mineral Reserves
- Probable: 43,692 kt @ 0.28 g/t Au, 9.61 g/t Ag; contained 396 koz Au, 13,500 koz Ag (100% ownership)
- Mineral Resources
- Indicated: 25,513 kt @ 0.25 g/t Au, 13.6 g/t Ag; contained 208.6 koz Au, 11,145 koz Ag. Inferred: 17,370 kt @ 0.23 g/t Au, 11.8 g/t Ag; contained 126.3 koz Au, 6,588 koz Ag (100% basis)
Coimolache Mine (40.094% BAOB)
- Mineral Reserves
- Probable: 17,518 kt @ 0.28 g/t Au, 9.61 g/t Ag; contained 159 koz Au, 5,413 koz Ag (40.094% BAOB)
- Mineral Resources
- Indicated: 10,229 kt @ 0.25 g/t Au, 13.6 g/t Ag; contained 83.6 koz Au, 4,468 koz Ag. Inferred: 6,964 kt @ 0.23 g/t Au, 11.8 g/t Ag; contained 50.7 koz Au, 2,641 koz Ag (40.094% BAOB)
El Brocal (Colquijirca)
- Mineral Reserves
- Tajo Norte Smelter (Cu-Ag): 4,935,461 TMS at 1.86 oz/t Ag, 2.13% Cu = 9,203,888 oz Ag, 105,282 TM Cu. Tajo Norte (Zn-Pb-Ag): 1,766,329 TMS at 4.06% Zn, 1.96% Pb, 4.04 oz/t Ag = 71,801 TM Zn, 34,541 TM Pb, 7,143,826 oz Ag. Marcapunta Norte: 74,650,886 TMS at 0.02 oz/t Au, 1.22% Cu, 0.63 oz/t Ag = 1,423,639 oz Au, 912,361 TM Cu, 47,038,166 oz Ag
Julcani
- Mineral Reserves
- 204,897 TMS with 16.06 oz/t Ag, 1.47 g/t Au, 2.43% Pb, 0.62% Cu = 3,290,239 oz Ag, 9,695 oz Au, 4,984 TM Pb, 1,266 TM Cu
Uchucchacua & Yumpag (Combined Reserves)
- Mineral Reserves
- 7,322,191 TMS with 15.80 oz/t Ag, 1.11% Pb, 1.88% Zn, 7.90% Mn = 115,725,605 oz Ag, 81,146 TM Pb, 137,708 TM Zn. Breakdown: Uchucchacua: 2,983,406 TMS with 7.33 oz/t Ag, 1.92% Pb, 3.43% Zn, 4.30% Mn = 21,870,208 oz Ag, 57,140 TM Pb, 102,293 TM Zn; Yumpag: 4,338,785 TMS with 21.63 oz/t Ag, 0.55% Pb, 0.82% Zn, 10.37% Mn = 93,855,397 oz Ag, 24,007 TM Pb, 35,415 TM Zn
Tantahuatay Sulfuros
- Mineral Resources
- 734.8 Mt of ore with weighted average grade of 0.43% Cu, 0.19 g/t Au and 8.08 g/t Ag (Indicated 133.6 Mt; Inferred 601.2 Mt), NSR cut-off 7.76 US$/t, CuEq cut-off 0.1958%
Orcopampa (after-tax, without final & post closure), SRK conditional on Buenaventura corporate commitment
Uchucchacua
- Mineral Resources
- Measured 620 kt at 7.95 oz/t Ag, 1.06% Pb, 1.69% Zn, 6.94% Mn, 3.96% Fe; Indicated 1,607 kt at 7.86 oz/t Ag, 1.1% Pb, 1.85% Zn, 6.85% Mn, 5.61% Fe; Measured & Indicated 2,227 kt at 7.88 oz/t Ag, 1.09% Pb, 1.8% Zn, 6.87% Mn, 5.15% Fe; Inferred 7,029 kt at 11.73 oz/t Ag, 1.49% Pb, 2.2% Zn, 6.58% Mn, 6.57% Fe
Tambomayo
- Mineral Reserves
- Proven & Probable: 1,388 kt, 3.01 g/t Au, 162.09 g/t Ag, 0.94% Pb, 1.41% Zn
- Mineral Resources
- Measured & Indicated: 557 kt, 2.86 g/t Au, 4.68 oz/t Ag, 0.99% Pb, 1.6% Zn, NSR 211.44 US$/t, 4.65 g/t AuEq, 83.34 (000 Oz AuEq). Inferred: 120 kt, 1.73 g/t Au, 8.4 oz/t Ag, 0.79% Pb, 1.08% Zn, NSR 234.26 US$/t, 5.15 g/t AuEq, 19.92 (000 Oz AuEq)
Orcopampa
- Mineral Reserves
- 517 kt at 9.37 g/t Au and 0.57 oz/t Ag (Proven & Probable)
- Mineral Resources
- Measured & Indicated 345 kt at 9.97 g/t Au, 0.76 oz/t Ag, 110,425 Au Oz; Inferred 373 kt at 10.13 g/t Au, 0.49 oz/t Ag, 121,420 Au Oz
- Royalties / Streams
- 0.915 royalty factor in NSR formula; royalties applicable on reported mineral reserves areas corresponding to mining rights ownership
Tantahuatay
- Mineral Reserves
- Total Probable 65,455 kt (65.455 Mt), 0.23 g/t Au, 7.72 g/t Ag. Breakdown: Tantahuatay 2 12,275 kt 0.20 g/t Au 16.40 g/t Ag; Cienaga Norte 3,511 kt 0.49 g/t Au 2.06 g/t Ag; Tantahuatay 2 EXT NW 29,157 kt 0.29 g/t Au 11.02 g/t Ag; Mirador 20,512 kt 0.34 g/t Au 1.04 g/t Ag.
- Mineral Resources
- Indicated 30.79 Mt 0.23 g/t Au 16.31 g/t Ag (Tantahuatay); 1.38 Mt 0.46 g/t Au 1.60 g/t Ag (Cienaga); 5.92 Mt 0.29 g/t Au 2.70 g/t Ag (Mirador); Inferred 3.17 Mt 0.17 g/t Au 12.63 g/t Ag (Tantahuatay); 1.10 Mt 0.37 g/t Au 0.51 g/t Ag (Cienaga); 8.81 Mt 0.29 g/t Au 5.95 g/t Ag (Mirador). Total Indicated+Inferred: 51.16 Mt 0.25 g/t Au 11.99 g/t Ag.
Trapiche Project
Yumpag
- Mineral Reserves
- See combined Uchucchacua & Yumpag entry
- Mineral Resources
- Measured 9 kt at 20.76 oz/t Ag, 0.44% Pb, 0.65% Zn, 3.41% Fe, 22.33% Mn; Indicated 195 kt at 16.07 oz/t Ag, 0.31% Pb, 0.56% Zn, 2.98% Fe, 19.53% Mn; Measured & Indicated 204 kt at 16.28 oz/t Ag, 0.32% Pb, 0.57% Zn, 3.00% Fe, 19.65% Mn; Inferred 148 kt at 27.18 oz/t Ag, 0.65% Pb, 1.07% Zn, 4.35% Fe, 22.83% Mn
Project figures are automatically extracted from company filings and presentations and reflect the most recent disclosure found. They may contain errors — always verify against the linked source document.
How the Economics Evolved
Trapiche Project
24 studies on recordSan Gabriel Project
25 studies on recordCerro Verde Mine
25 studies on recordEl Brocal
25 studies on recordEconomics as disclosed in each successive study. NPV shown in US$ where a currency conversion is available (at each study's own period rate), else in the study's stated currency. Verify against the source filings.
Find the best mining projects
Be the first to know about new mining results, and how they compare to other projects.
Financial Metrics
Loading financial data...
Frequently Asked Questions
- What does Compania de Minas Buenaventura S.A.A. mine?
- Compania de Minas Buenaventura S.A.A. is focused on Gold.
- What is the economic value of Compania de Minas Buenaventura S.A.A.'s El Brocal?
- According to its Resource Estimate, El Brocal has an after-tax NPV of $619M.
- How many projects does Compania de Minas Buenaventura S.A.A. have?
- We track 20 projects with extracted technical and economic data for Compania de Minas Buenaventura S.A.A.
Project Analysis
Tambomayo PFS: $41M NPV, $17M Capex
Compania de Minas Buenaventura S.A.A.'s Tambomayo in Peru; district of Tapay, province of Caylloma, Arequipa region has a Pre-Feasibility Study (PFS) outlining an after-tax NPV of $41M and initial capital of $17M. The mine plan runs 3 years at about 1500 per year.
Tantahuatay Resource Estimate: $157M NPV Over a 6-Year Mine Life
Compania de Minas Buenaventura S.A.A.'s Tantahuatay in Peru, Department of Cajamarca has a Mineral Resource Estimate outlining an after-tax NPV of $157M. The proposed mine plan runs 6 years.
Orcopampa Feasibility Study: $-30M NPV Over a 3-Year Mine Life
Compania de Minas Buenaventura S.A.A.'s Orcopampa in Peru has a Feasibility Study outlining an after-tax NPV of $-30M. The proposed mine plan runs 3 years.
Uchucchacua Feasibility Study: $35M NPV Over a 5-Year Mine Life
Compania de Minas Buenaventura S.A.A.'s Uchucchacua in Peru - Oyón, Lima department; Yanahuanca, Daniel Alcides Carrion, Pasco department has a Feasibility Study outlining an after-tax NPV of $35M. The proposed mine plan runs 5 years.
Coimolache Mine Feasibility Study: $5M NPV Over a 5-Year Mine Life
Compania de Minas Buenaventura S.A.A.'s Coimolache Mine in Peru has a Feasibility Study outlining an after-tax NPV of $5M. The proposed mine plan runs 5 years.
El Brocal Resource Estimate: $619M NPV Over a 17-Year Mine Life
Compania de Minas Buenaventura S.A.A.'s El Brocal in Peru, Pasco has a Mineral Resource Estimate outlining an after-tax NPV of $619M. The mine plan runs 17 years at about 4750 kt/yr per year.
San Gabriel Project Feasibility Study: $191M NPV, 21.8% IRR
Compania de Minas Buenaventura S.A.A.'s San Gabriel Project in Ichuña district, General Sánchez Cerro Province, Department of Moquegua, southern Peru has a Feasibility Study outlining an after-tax NPV of $191M, an after-tax IRR of 21.8%, and initial capital of $177M. The mine plan runs 14.2 years at about 109 koz Au per year.
Quick Facts
- Ticker Symbol
- BVN
- Market Cap
- Small Cap
- Category
- Gold
- Commodities
- Gold
This information is for educational purposes only and does not constitute investment advice. Always conduct your own research before making investment decisions.