Heliostar Metals Ltd.
Price History
Loading chart...
About Heliostar Metals Ltd.
Heliostar Metals Ltd. (HSTR.V) is a gold mining company listed on the TSX Venture Exchange (TSXV). Our project database tracks 7 projects for Heliostar Metals Ltd. with technical and economic data extracted from company filings. Its flagship Ana Paula Project (PEA) carries an after-tax NPV of $426M and an IRR of 28.1% over a 9-year mine life.
Heliostar Metals is developing gold projects in Mexico, including the La Colorada mine and advanced-stage development assets in Sonora and Sinaloa. The company is advancing near-term production potential in a favorable mining jurisdiction.
Primary Commodities
Project Economics
Goldstrike Project
- Mineral Resources
- M&I: 975 koz Au @ 0.46 g/t; Inferred: 90 koz Au @ 0.31 g/t
La Colorada Mine
- Mineral Reserves
- 376k gold ounces (Probable: 17,117 kt @ 0.68 g/t Au, 9.2 g/t Ag)
- Mineral Resources
- M&I: 514 koz Au (20,213 kt @ 0.79 g/t Au, 10.4 g/t Ag); Inferred: 17 koz Au (1,144 kt @ 0.46 g/t Au, 35.1 g/t Ag)
- Royalties / Streams
- 0%
San Agustin Mine
- Mineral Reserves
- 68 koz gold (Probable: 7,358 kt @ 0.29 g/t Au, 16.4 g/t Ag)
- Mineral Resources
- M&I: 325 koz Au (23,629 kt @ 0.43 g/t Au, 12.2 g/t Ag); Inferred: 14 koz Au (1,401 kt @ 0.32 g/t Au, 9.4 g/t Ag)
- Royalties / Streams
- 0%
Cerro del Gallo Project
- Mineral Reserves
- Probable: 1,495 koz Au, 45,066 koz Ag (Total 1,939 koz AuEq as per total table)
- Mineral Resources
- M&I: 2,944 koz Au, 106,359 koz Ag; Inferred: 224 koz Au, 10,746 koz Ag
- Royalties / Streams
- 3.75%
Ana Paula Project
- Mineral Resources
- Measured: 317 koz Au @ 7.60 g/t; Indicated: 424 koz Au @ 4.44 g/t; Total M&I: 742 koz Au @ 5.40 g/t; Inferred: 514 koz Au @ 3.96 g/t
San Agustin Mine (PEA case from Technical Report Highlights)
- Mineral Reserves
- 68 koz Au @ 0.29 g/t
- Royalties / Streams
- 0%
San Antonio Project
- Mineral Resources
- M&I: 1,741 koz Au @ 0.98 g/t
- Royalties / Streams
- 0%
Project figures are automatically extracted from company filings and presentations and reflect the most recent disclosure found. They may contain errors — always verify against the linked source document.
Financial Metrics
Loading financial data...
Frequently Asked Questions
- What does Heliostar Metals Ltd. mine?
- Heliostar Metals Ltd. is focused on Gold.
- What is the economic value of Heliostar Metals Ltd.'s Ana Paula Project?
- According to its PEA, Ana Paula Project has an after-tax NPV of $426M and an IRR of 28.1%.
- What exchange is Heliostar Metals Ltd. listed on?
- Heliostar Metals Ltd. trades under the ticker HSTR.V on the TSX Venture Exchange (TSXV).
- How many projects does Heliostar Metals Ltd. have?
- We track 7 projects with extracted technical and economic data for Heliostar Metals Ltd.
Project Analysis
San Agustin Mine (PEA case from Technical Report Highlights) Feasibility Study: $12M NPV, 156% IRR
Heliostar Metals Ltd.'s San Agustin Mine (PEA case from Technical Report Highlights) in Durango, Mexico has a Feasibility Study outlining an after-tax NPV of $12M, an after-tax IRR of 156%, and initial capital of $40M.
San Antonio Project PEA: $131M Capex Over a 14-Year Mine Life
Heliostar Metals Ltd.'s San Antonio Project in Baja California Sur, Mexico has a Preliminary Economic Assessment (PEA) outlining initial capital of $131M. The mine plan runs 14 years at about 80 koz Au/yr per year.
Cerro del Gallo Project PFS: $424M NPV, 33.1% IRR
Heliostar Metals Ltd.'s Cerro del Gallo Project in Guanajuato, Mexico has a Pre-Feasibility Study (PFS) outlining an after-tax NPV of $424M, an after-tax IRR of 33.1%, and initial capital of $195M. The mine plan runs 15 years at about 85.7 koz GEO/yr per year.
Ana Paula Project PEA: $426M NPV, 28.1% IRR
Heliostar Metals Ltd.'s Ana Paula Project in Guerrero, Mexico has a Preliminary Economic Assessment (PEA) outlining an after-tax NPV of $426M, an after-tax IRR of 28.1%, and initial capital of $300M. The mine plan runs 9 years at about 101 koz Au/yr per year.
San Agustin Mine Production Update: $35M NPV, 548% IRR
Heliostar Metals Ltd.'s San Agustin Mine in Durango, Mexico has a production guidance outlining an after-tax NPV of $35M, an after-tax IRR of 548%, and initial capital of $40M. The mine plan runs 1.2 years at about 30 koz Au per year.
La Colorada Mine Production Update: $243M NPV, 168.4% IRR
Heliostar Metals Ltd.'s La Colorada Mine in Sonora, Mexico has a production guidance outlining an after-tax NPV of $243M, an after-tax IRR of 168.4%, and initial capital of $45M. The mine plan runs 6 years at about 50 koz Au per year.
Quick Facts
- Ticker Symbol
- HSTR.V
- Market Cap
- Small Cap
- Category
- Gold
- Commodities
- Gold
This information is for educational purposes only and does not constitute investment advice. Always conduct your own research before making investment decisions.