Chesapeake Gold Corp.
Price History
Loading chart...
About Chesapeake Gold Corp.
Chesapeake Gold Corp. (CKG.V) is a gold mining company listed on the TSX Venture Exchange (TSXV). Our project database tracks 4 projects for Chesapeake Gold Corp. with technical and economic data extracted from company filings. Its flagship Metates (2016 PFS comparison) (Pre-Feasibility) carries an after-tax NPV of $1.80B over a 27-year mine life.
Chesapeake Gold is advancing the Metates gold-silver project in Durango, Mexico, one of the world's largest undeveloped gold-silver deposits. The project hosts substantial measured and indicated resources in a prolific mining district with strong metallurgical characteristics.
Primary Commodities
Project Economics
Metates
- Mineral Resources
- M&I 921.2Mt @ 0.57 g/t Au & 14.3 g/t Ag containing 16.77 Moz Au & 423.2 Moz Ag; Inferred 139.5Mt @ 0.47 g/t Au & 13.2 g/t Ag containing 2.13 Moz Au & 59.0 Moz Ag
- Royalties / Streams
- 0.5% NSR & 7.5% Gov't EBITDA Royalty
Metates Sulphide Heap Leach Project (Phase 1)
- Mineral Resources
- M&I: 921.2 Mt @ 0.57 g/t Au (14.3 g/t Ag) = 16.77 Moz Au & 423.2 Moz Ag; Inferred: 139.5 Mt @ 0.47 g/t Au (13.2 g/t Ag) = 2.13 Moz Au & 59.0 Moz Ag
- Royalties / Streams
- 0.5% NSR & 7.5% Government EBITDA Royalty
Metates (2016 PFS comparison)
- Mineral Resources
- M&I ~19Moz Au & 503Moz Ag Contained; Inf. ~1Moz Au & 16Moz Ag Contained
Project figures are automatically extracted from company filings and presentations and reflect the most recent disclosure found. They may contain errors — always verify against the linked source document.
How the Economics Evolved
Metates
2 studies on recordLucy
3 studies on recordEconomics as disclosed in each successive study. NPV shown in US$ where a currency conversion is available (at each study's own period rate), else in the study's stated currency. Verify against the source filings.
Find the best mining projects
Be the first to know about new mining results, and how they compare to other projects.
Financial Metrics
Loading financial data...
Frequently Asked Questions
- What does Chesapeake Gold Corp. mine?
- Chesapeake Gold Corp. is focused on Gold.
- What is the economic value of Chesapeake Gold Corp.'s Metates (2016 PFS comparison)?
- According to its Pre-Feasibility, Metates (2016 PFS comparison) has an after-tax NPV of $1.80B.
- What exchange is Chesapeake Gold Corp. listed on?
- Chesapeake Gold Corp. trades under the ticker CKG.V on the TSX Venture Exchange (TSXV).
- How many projects does Chesapeake Gold Corp. have?
- We track 4 projects with extracted technical and economic data for Chesapeake Gold Corp.
Project Analysis
Metates Sulphide Heap Leach Project (Phase 1) PEA: $1.14B NPV, 35% IRR
Chesapeake Gold Corp.'s Metates Sulphide Heap Leach Project (Phase 1) in Durango, Mexico has a Preliminary Economic Assessment (PEA) outlining a pre-tax NPV of $1.14B, a pre-tax IRR of 35%, and initial capital of $359M. The mine plan runs 31 years at about 147 koz AuEq (Yr 1-15) per year.
Metates (2016 PFS comparison) PFS: $1.80B NPV, $3.50B Capex
Chesapeake Gold Corp.'s Metates (2016 PFS comparison) in Durango, Mexico has a Pre-Feasibility Study (PFS) outlining a pre-tax NPV of $1.80B and initial capital of $3.50B. The mine plan runs 27 years at about 560 Koz Au per year.
Metates PEA: $1.14B NPV, 35% IRR
Chesapeake Gold Corp.'s Metates in Durango, Mexico has a Preliminary Economic Assessment (PEA) outlining a pre-tax NPV of $1.14B, a pre-tax IRR of 35%, and initial capital of $359M. The mine plan runs 31 years at about 147 koz AuEq per year.
Quick Facts
- Ticker Symbol
- CKG.V
- Market Cap
- Small Cap
- Category
- Gold
- Commodities
- Gold
This information is for educational purposes only and does not constitute investment advice. Always conduct your own research before making investment decisions.