Gold$2,045.30+0.52%
Silver$23.84-0.18%
Copper$3.85+1.23%
Platinum$912.40-0.33%
Iron Ore$118.50+2.14%
Nickel$16,892-0.89%
Troilus Mining Corp. logo

Troilus Mining Corp.

TLG.TOSmall CapGold

Price History

Loading chart...

About Troilus Mining Corp.

Troilus Mining Corp. (TLG.TO) is a gold mining company listed on the Toronto Stock Exchange (TSX). Our project database tracks 1 project for Troilus Mining Corp. with technical and economic data extracted from company filings. Its flagship Troilus Gold - Copper Project (Feasibility) carries an after-tax NPV of $3.21B and an IRR of 22% over a 26-year mine life.

Troilus Mining is developing the flagship Troilus gold-copper project in Quebec, an advanced-stage deposit with large measured and indicated resources in Canada's productive mining region. The company is advancing the project toward a production decision with strong community and government support.

Primary Commodities

Gold

Project Economics

Troilus Gold - Copper Project

Gold· Québec, Canada· Development
Feasibility
Sep 2026
NPV (After-Tax) @ 5%$3.21B
NPV (Pre-Tax)$5.27B
IRR (After-Tax)22%
Initial Capex$1.43B
Payback3.6 yrs
AISC1,340 USD/oz
Mine Life26 yrs
Head Grade0.44 g/t Au, 0.05% Cu, 0.92 g/t Ag
Recovery85.7%
Mine TypeOpen-pit
Strip Ratio2.4:1
Contained Metal12.1 Moz AuEQ (M&I)
Mineral Reserves
Proven and Probable: 478 Mt grading 0.44 g/t Au, 0.054% Cu, 0.92 g/t Ag (AuEq 0.52 g/t; CuEq 0.39%), containing 6.69 Moz Au, 568 Mlb Cu, 14.22 Moz Ag, 8.01 Moz AuEq, 4.06 Blbs CuEq
Mineral Resources
Measured 81.6 Mt, Indicated 728.6 Mt, Meas+Ind 810.2 Mt, Inferred 182.5 Mt

Project figures are automatically extracted from company filings and presentations and reflect the most recent disclosure found. They may contain errors — always verify against the linked source document.

How the Economics Evolved

Troilus Project

8 studies on record
Feasibility
May 2024
$885M
IRR 14% · Capex $1.07B
Feasibility
May 2024
$885M
IRR 14% · Capex $1.07B
Feasibility
Sep 2026
$3.21B(+262%)
IRR 22% · Capex $1.43B
Feasibility
Sep 2026
$3.20B
IRR 22% · Capex $1.43B
Feasibility
Sep 2026
$3.20B
IRR 22% · Capex $1.43B
Feasibility
Sep 2026
$3.21B
IRR 22% · Capex $1.43B
Feasibility
Sep 2026
$3.20B
IRR 22% · Capex $1.43B
Feasibility
Sep 2026
$3.21B
IRR 22% · Capex $1.43B

Economics as disclosed in each successive study. NPV shown in US$ where a currency conversion is available (at each study's own period rate), else in the study's stated currency. Verify against the source filings.

Free email updates

Find the best mining projects

Be the first to know about new mining results, and how they compare to other projects.

Financial Metrics

Loading financial data...

Frequently Asked Questions

What does Troilus Mining Corp. mine?
Troilus Mining Corp. is focused on Gold.
What is the economic value of Troilus Mining Corp.'s Troilus Gold - Copper Project?
According to its Feasibility, Troilus Gold - Copper Project has an after-tax NPV of $3.21B and an IRR of 22%.
What exchange is Troilus Mining Corp. listed on?
Troilus Mining Corp. trades under the ticker TLG.TO on the Toronto Stock Exchange (TSX).

Quick Facts

Ticker Symbol
TLG.TO
Market Cap
Small Cap
Category
Gold
Commodities
Gold

This information is for educational purposes only and does not constitute investment advice. Always conduct your own research before making investment decisions.

◆ ◆ ◆