NextSource Materials Inc.

NEXT.TOSmall CapGraphite

Price History

Loading chart...

About NextSource Materials Inc.

Developing the Molo graphite mine in Madagascar, producing SuperFlake graphite concentrate for battery and industrial markets.

Primary Commodities

Graphite

Project Economics

UAE Battery Anode Facility (BAF)

Graphite (Anode Materials)· Abu Dhabi, United Arab Emirates· Development
Pre-Feasibility
Oct 2025
NPV (After-Tax)$442M
NPV (Pre-Tax)$442M
IRR (After-Tax)24.2%
Initial Capex$291M
Payback4.6 yrs
Annual Production30,000 tpa (10,000tpa PFG + 16,000tpa SPG + 4,000tpa CSPG)
Ownership100%

Molo Graphite Expansion

Graphite· Madagascar· Development
Feasibility
Jan 2024
NPV (After-Tax) @ 8%$370M
NPV (Pre-Tax)$424M
IRR (After-Tax)29%
Initial Capex$187M
Payback3.1 yrs
AISC714.3 USD/t concentrate
Annual Production150 ktpa concentrate
Head Grade6.23% Cg
Recovery88.3%
Mine TypeOpen-pit
Strip Ratio0.3:1
Contained Metal6,289 kt graphite
Mineral Reserves
53.7 Mt at 6.15% Cg containing 3,306 kt of graphite (Proven: 21,334 kt at 6.25% Cg; Probable: 32,412 kt at 6.09% Cg)
Mineral Resources
100.37 Mt at 6.27% Cg M&I (Measured: 23.62 Mt at 6.32% Cg; Indicated: 76.75 Mt at 6.25% Cg) plus Inferred: 40.91 Mt at 5.78% Cg

Molo Graphite Mine

Graphite· South-west Madagascar· Production
Feasibility
Sep 2023
Mine Life100 yrs
Annual Production11 ktpa graphite concentrate
Head Grade6.2% C
Ownership100%
Mineral Reserves
54Mt @ 6.2% C
Mineral Resources
141Mt @ 6.1% C

Molo Graphite Mine Expansion

Graphite· South-west Madagascar· Development
Feasibility
Sep 2023
Ownership100%

Molo Modular Phase 2

Graphite· Madagascar· Development
PEA
Jan 2022
NPV (After-Tax) @ 8%$593M
NPV (Pre-Tax)$905M
IRR (After-Tax)31.4%
Initial Capex$156M
Payback3.7 yrs
Mine Life26 yrs
Annual Production150,000 tpa graphite concentrate
Head Grade6.16% C
Recovery88.3%
Mine TypeOpen-pit
Strip Ratio0.53:1
Mineral Reserves
Proven: 14,169,741 t @ 7.00% C; Probable: 8,266,944 t @ 7.04% C; Total P&P: 22,436,685 t @ 7.02% C
Mineral Resources
Measured Low Grade: 13,048,373 t @ 4.64% C; Measured High Grade: 10,573,137 t @ 8.4% C; Indicated: 76.75 Mt @ 6.25% C; Inferred: 40.91 Mt @ 5.78% C

Green Giant Project

Vanadium· Fotadrevo, Province of Toliara, Madagascar· Exploration
Resource Estimate
Jan 2011
Ownership100%
Royalties / Streams
2% NSR to MMR, with buyback option for first 1% at US$500,000 and second 1% at US$1,000,000

Project figures are automatically extracted from company filings and presentations and reflect the most recent disclosure found. They may contain errors — always verify against the linked source document.

Financial Metrics

Loading financial data...

Quick Facts

Ticker Symbol
NEXT.TO
Market Cap
Small Cap
Category
Graphite
Commodities
Graphite