Gold$2,045.30+0.52%
Silver$23.84-0.18%
Copper$3.85+1.23%
Platinum$912.40-0.33%
Iron Ore$118.50+2.14%
Nickel$16,892-0.89%
Nouveau Monde Graphite Inc. logo

Nouveau Monde Graphite Inc.

NOU.TOSmall CapGraphite

Price History

Loading chart...

About Nouveau Monde Graphite Inc.

Nouveau Monde Graphite Inc. (NOU.TO) is a graphite mining company listed on the Toronto Stock Exchange (TSX). Our project database tracks 2 projects for Nouveau Monde Graphite Inc. with technical and economic data extracted from company filings. Its flagship Uatnan Mining Project (Lac Guéret graphite deposit) (PEA) carries an after-tax NPV of C$2.17B and an IRR of 25.9% over a 24-year mine life.

Developing an integrated graphite mining and battery anode material production operation in Quebec for the EV supply chain.

Primary Commodities

Graphite

Project Economics

Matawinie Graphite Mine

Graphite· Canada, Québec (Tony Block Property)· Development
Feasibility
Nov 2025
NPV (After-Tax) @ 8%C$238M
NPV (Pre-Tax)C$379M
IRR (After-Tax)15.8%
Initial CapexC$421M
Payback5.3 yrs
Mine Life25 yrs
Annual Production105,882 tpy graphite concentrate
Mine TypeOpen-pit
Strip Ratio1.16:1
Mineral Reserves
17.3 Mt Proven Mineral Reserves at average grade 4.16% C(g); 44.3 Mt Probable Mineral Reserves at average grade 4.26% C(g); total 61.7 Mt Proven and Probable at average grade 4.23% C(g). Strip ratio 1.16:1.
Mineral Resources
West Zone: Measured 28.5 Mt at 4.28% C(g) (1.22 Mt contained); Indicated 101.8 Mt at 4.26% C(g) (4.33 Mt contained); Measured + Indicated 130.3 Mt at 4.26% C(g) (5.55 Mt contained); Inferred 23.0 Mt at 4.28% C(g) (0.98 Mt contained). South Zones: Indicated 26.3 Mt at 3.73% C(g) (0.981 Mt contained); Inferred 19.2 Mt at 3.67% C(g) (0.705 Mt contained).

Nouveau Monde Graphite Inc.

· Production

Uatnan Mining Project (Lac Guéret graphite deposit)

Graphite (natural flake, Cg)· Québec, Canada (Rivière-aux-Outardes, Côte-Nord region, Nitassinan)· Development
PEA
Jan 2023
NPV (After-Tax) @ 8%C$2.17B
NPV (Pre-Tax)C$3.61B
IRR (After-Tax)25.9%
Initial CapexC$1.42B
Payback3.2 yrs
Mine Life24 yrs
Annual Production500,000 t graphite concentrate
Head Grade17.5% Cg (LOM average)
Recovery85%
Mine TypeOpen-pit
Strip Ratio1.3:1
Contained Metal11.3 Mt Cg (M&I)
Mineral Resources
Total Measured + Indicated: 65.64 Mt @ 17.2% Cg (11.30 Mt Cg); Total Inferred: 17.82 Mt @ 17.2% Cg (3.07 Mt Cg); at 5.75% Cg cut-off

Project figures are automatically extracted from company filings and presentations and reflect the most recent disclosure found. They may contain errors — always verify against the linked source document.

Free email updates

Find the best mining projects

Be the first to know about new mining results, and how they compare to other projects.

Financial Metrics

Loading financial data...

Frequently Asked Questions

What does Nouveau Monde Graphite Inc. mine?
Nouveau Monde Graphite Inc. is focused on Graphite.
What is the economic value of Nouveau Monde Graphite Inc.'s Uatnan Mining Project (Lac Guéret graphite deposit)?
According to its PEA, Uatnan Mining Project (Lac Guéret graphite deposit) has an after-tax NPV of C$2.17B and an IRR of 25.9%.
What exchange is Nouveau Monde Graphite Inc. listed on?
Nouveau Monde Graphite Inc. trades under the ticker NOU.TO on the Toronto Stock Exchange (TSX).
How many projects does Nouveau Monde Graphite Inc. have?
We track 2 projects with extracted technical and economic data for Nouveau Monde Graphite Inc.

Project Analysis

Quick Facts

Ticker Symbol
NOU.TO
Market Cap
Small Cap
Category
Graphite
Commodities
Graphite

This information is for educational purposes only and does not constitute investment advice. Always conduct your own research before making investment decisions.

◆ ◆ ◆