Gold$2,045.30+0.52%
Silver$23.84-0.18%
Copper$3.85+1.23%
Platinum$912.40-0.33%
Iron Ore$118.50+2.14%
Nickel$16,892-0.89%
Falcon Energy Materials Inc. logo

Falcon Energy Materials Inc.

FLCN.VSmall CapGraphite

Price History

Loading chart...

About Falcon Energy Materials Inc.

Falcon Energy Materials (formerly SRG Mining) is advancing the Lola Graphite project in Guinea, West Africa, one of the largest undeveloped flake graphite deposits globally, covering a 94.38 km² mining permit area. The company is developing a Morocco Anode Plant to process Lola graphite into battery-grade anode material for the lithium-ion battery supply chain.

Primary Commodities

Graphite

Project Economics

Jorf Lasfar CSPG Anode Plant (Morocco)

CSPG (Coated Spheronized Purified Graphite)· Jorf Lasfar, Morocco· Development
PEA
Oct 2025
Initial Capex$86M
AISC3,168 USD/t CSPG
Annual Production26 ktpa CSPG

Morocco CSPG Anode Plant (Jorf Lasfar)

CSPG (Coated Spheronized Purified Graphite)· Morocco (Jorf Lasfar)· Development
PEA
Oct 2025
Initial Capex$86M
AISC3,168 USD/t
Annual Production26 ktpa CSPG

Battery Materials Plant (BMP) – Morocco

Graphite (CSPG anode material)· Morocco· Development
PEA
2025
NPV (After-Tax) @ 8%$1.15B
NPV (Pre-Tax)$1.26B
IRR (After-Tax)82%
Initial Capex$106M
Payback1 yrs
AISC3,193 USD/t CSPG
Mine Life25 yrs
Annual Production26,400 t/a CSPG

Lola Graphite Project

Graphite· Guinea· Development
PEA
2025
NPV (After-Tax) @ 8%$1.32B
NPV (Pre-Tax)$1.58B
IRR (After-Tax)43.1%
Initial Capex$291M
Payback2.6 yrs
AISC680 USD/t NFG concentrate
Mine Life25 yrs
Annual Production26,400 t/a CSPG
Head Grade3.80% Cg (Saprolite), 4.14% Cg (Fresh Rock)
Recovery84.2%
Mineral Resources
Measured & Indicated: 53.96 Mt @ 3.98% Cg (2,145.6 kt Cg); Inferred: 12.30 Mt @ 3.60% Cg (442.5 kt Cg). Effective Date: Feb 27, 2023.

Battery Materials Plant (BMP) - Standalone

Graphite (CSPG)· Morocco· Development
PEA
Feb 2023
NPV (After-Tax) @ 8%$1.15B
NPV (Pre-Tax)$1.26B
IRR (After-Tax)82%
Initial Capex$106M
Payback1 yrs
Mine Life25 yrs
Ownership100%

Lola Graphite Project / Integrated Development Plan (IDP)

Graphite (CSPG, NFG concentrate)· Guinea (Lola Graphite mine & concentrator) and Morocco (Battery Materials Plant / BMP)· Development
PEA
Feb 2023
NPV (After-Tax) @ 8%$1.32B
NPV (Pre-Tax)$1.58B
IRR (After-Tax)43.1%
Initial Capex$291M
Payback2.6 yrs
Mine Life25 yrs
Annual Production26,400 t/a CSPG
Head Grade3.80% Cg Saprolite, 4.14% Cg Fresh Rock
Recovery83.6%
Mine TypeOpen-pit
Strip Ratio0.881:1
Ownership100%
Contained Metal2,145.6 kt Cg
Mineral Resources
Measured & Indicated: 53.96 Mt @ 3.98% Cg (2,145.6 kt contained Cg); Inferred: 12.30 Mt @ 3.60% Cg (442.5 kt contained Cg)

Lola Graphite Project (Battery Material Plant only - BMP standalone)

Graphite (CSPG anode material)· Morocco· Development
PEA
2023
NPV (After-Tax) @ 8%$1.15B
NPV (Pre-Tax)$1.26B
IRR (After-Tax)82%
Initial Capex$106M
Payback1 yrs
Mine Life25 yrs
Ownership100%

Project figures are automatically extracted from company filings and presentations and reflect the most recent disclosure found. They may contain errors — always verify against the linked source document.

Financial Metrics

Loading financial data...

Quick Facts

Ticker Symbol
FLCN.V
Market Cap
Small Cap
Category
Graphite
Commodities
Graphite

This information is for educational purposes only and does not constitute investment advice. Always conduct your own research before making investment decisions.

◆ ◆ ◆