Silver X Mining operates the Nueva Recuperada mine in Peru, producing silver concentrates with associated lead and zinc. The operation is established within Peru's productive mining regions.
Primary Commodities
Silver
Project Economics
Pampas Project
Gold-Silver· Huancavelica, Peru· Exploration
Ownership100%
- Royalties / Streams
- 3.0% NSR royalty (1.5% repurchase option for US$1.5M in first 4 years post-production)
Source: Company presentation
Nueva Recuperada (Tangana + Plata)
Silver· Huancavelica, Peru· Production
PEA
Sep 2025
NPV (After-Tax) @ 5%$440M
IRR (After-Tax)69%
Initial Capex$82M
AISC15.8 USD/oz AgEq
Mine Life14 yrs
Annual Production6.2 Moz AgEq
Mine TypeUnderground
- Mineral Resources
- M&I: 3.91 Mt @ 3.85 oz/t Ag, 0.461 g/t Au, 2.44% Pb, 3.18% Zn, 9.12 AgEq oz/t; Inferred: 15.11 Mt @ 4.51 oz/t Ag, 0.265 g/t Au, 1.49% Pb, 1.72% Zn, 7.5 AgEq oz/t
Source: Company presentation
Plata Mining Unit
Silver· Huancavelica, Peru· Development
PEA
Sep 2025
Mine Life14 yrs
Annual Production1,500 tpd
Mine TypeUnderground
- Mineral Resources
- 0.99 Mt Indicated @ 5.91 oz Ag/t (183.81 g/t), 2.36% Pb, 4.11% Zn, 10.53 AgEq oz/t; 5.55 Mt Inferred @ 3.79 oz Ag/t (117.96 g/t), 1.53% Pb, 2.52% Zn, 6.65 AgEq oz/t. Total resource: 6.5 Mt @ 7.24 oz AgEq/t ~47.3 Moz AgEq
Source: Company presentation
Tangana Mining Unit
Silver· Huancavelica, Peru· Production
PEA
Sep 2025
Mine Life14 yrs
Mine TypeUnderground
- Mineral Resources
- 10.4 Mt @ 7.24 oz AgEq/t ~75.8 Moz AgEq
Source: Company presentation
Ccasahuasi Project
Gold (Disseminated)· Huancavelica, Peru· Exploration
PEA
May 2025
- Mineral Resources
- Ccascahuasi Disseminated Gold Exploration Project modelled estimations completed in May 2025. See Table 14.45 for Germana vein system inferred resources.
Source: Technical report
Nueva Recuperada Mining District (Combined Tangana & Plata)
Polymetallic (Silver, Gold, Lead, Zinc, Copper)· Huancavelica, Peru· Development
PEA
May 2025
Source: Technical report
Plata and Blenda Rubia Project
Silver (Polymetallic)· Huancavelica, Peru· Development
PEA
May 2025
Mine TypeUnderground
- Mineral Resources
- See Table 14.45 for Germana vein system inferred resources. Also Plata Mining Unit Mineral Resource Statement referenced in Section 25.
Source: Technical report
Tangana Project
Silver (Polymetallic)· Huancavelica, Peru· Development
PEA
May 2025
Head GradeAg 2.85 opt, Au 0.637 gpt, Pb 2.77%, Zn 2.77%, Cu 0.20%
Mine TypeUnderground
Contained Metal20,580.5 koz AgEq
- Mineral Resources
- Measured & Indicated: 2,455,975 tonnes at 2.85 opt Ag, 0.637 gpt Au, 2.77% Pb, 2.77% Zn, 0.20% Cu containing 6,994 koz Ag, 50,268 oz Au, 59,707 t Pb, 67,985 t Zn, 4,856 t Cu (AgEq 20,380,547 oz). Inferred: 1,589,558 tonnes at 2.99 opt Ag, 0.52 gpt Au, 1.92% Pb, 1.88% Zn, 0.19% Cu containing 4,753 koz Ag, 26,578 oz Au, 30,520 t Pb, 29,884 t Zn, 3,020 t Cu (AgEq 11,119,980 oz).
Source: Technical report
Nueva Recuperada Property (Combined)
Silver· Huancavelica, Peru· Development
Resource Estimate
Oct 2024
Mine TypeUnderground
Contained Metal13,968 koz Ag (M&I recoverable)
- Mineral Resources
- Measured & Indicated: 4,259,852 t @ 3.28 opt Ag, 0.565 g/t Au, 1.88% Pb, 2.22% Zn, 7.50 opt AgEq; Inferred: 17,179,080 t @ 5.12 opt Ag, 0.042 g/t Au, 2.05% Pb, 2.04% Zn, 7.99 opt AgEq
Source: Technical report
Plata Mining Unit (Nueva Recuperada Property)
Silver· Huancavelica, Peru· Development
Resource Estimate
Oct 2024
Mine TypeUnderground
Contained Metal7,165 koz Ag (Indicated+Inferred recoverable)
- Mineral Resources
- Indicated: 950,970 t @ 6.11 opt Ag, 2.44% Pb, 4.24% Zn, 13.46 opt AgEq; Inferred: 5,394,620 t @ 4.82 opt Ag, 1.98% Pb, 3.35% Zn, 10.84 opt AgEq
Source: Technical report
Plata Mining Unit (Plata Project)
Silver· Huancavelica, Peru· Development
Resource Estimate
Oct 2024
- Mineral Resources
- Indicated: 950,970 tonnes at 6.11 opt Ag, 2.44% Pb, 4.24% Zn, 13.46 opt AgEq; Inferred: 5,394,620 tonnes at 4.82 opt Ag, 1.98% Pb, 3.35% Zn, 10.84 opt AgEq (as at Oct 1, 2024, US$80/t cutoff, estimated recoverable using recovery factors: Ag 83%, Pb 86%, Zn 84%)
Source: Technical report
Nueva Recuperada / Tangana Project
Silver· Huancavelica, Peru· Development
PEA
Apr 2023
NPV (After-Tax)$175M
IRR (After-Tax)39%
Payback4 yrs
AISC26.9 USD/oz Ag Eq
Mine TypeUnderground
Contained Metal58.3 Moz Ag
- Mineral Resources
- Total M+I: 3.61 Mt @ 70.82 g/t Ag, 1.47 g/t Au, 1.78% Pb, 1.27% Zn containing 8.04 Moz Ag, 170.28 koz Au, 64.1 kt Pb, 45.7 kt Zn; Total Inferred: 11.89 Mt @ 152.5 g/t Ag, 0.31 g/t Au, 1.72% Pb, 1.79% Zn containing 58.31 Moz Ag, 119 koz Au, 204.1 kt Pb, 213.3 kt Zn
Source: Technical report
Red Silver
Silver· Huancavelica, Peru· Exploration
Resource Estimate
2022
- Mineral Resources
- M&I: 41,600 T @ 496 g/t Ag, 0.2% Pb, 0.3% Zn; Inferred: 1,908,725 T @ 496 g/t Ag, 0.2% Pb, 0.3% Zn
Source: Company presentation
Project figures are automatically extracted from company filings and presentations and reflect the most recent disclosure found. They may contain errors — always verify against the linked source document.
Financial Metrics
Loading financial data...
Quick Facts
- Ticker Symbol
- AGX.V
- Market Cap
- Small Cap
- Category
- Silver
- Commodities
- Silver
This information is for educational purposes only and does not constitute investment advice. Always conduct your own research before making investment decisions.
◆ ◆ ◆