Gold$2,045.30+0.52%
Silver$23.84-0.18%
Copper$3.85+1.23%
Platinum$912.40-0.33%
Iron Ore$118.50+2.14%
Nickel$16,892-0.89%
Northern Graphite Corporation logo

Northern Graphite Corporation

NGC.VSmall CapGraphite

Price History

Loading chart...

About Northern Graphite Corporation

Northern Graphite Corporation (NGC.V) is a graphite mining company listed on the TSX Venture Exchange (TSXV). Our project database tracks 10 projects for Northern Graphite Corporation with technical and economic data extracted from company filings. Its flagship Okanjande Graphite Project (PEA) carries an after-tax NPV of $65M and an IRR of 62% over a 10-year mine life.

Northern Graphite is a graphite mining company with the Bissett Creek and Okak projects producing natural flake graphite in Canada. The company supplies graphite materials for battery and industrial applications across North America.

Primary Commodities

Graphite

Project Economics

Bissett Creek

Graphite· Canada· Development
Feasibility
Initial Capex$115M
Annual Production44,000 t Cg concentrate
Mine TypeOpen-pit
Strip Ratio<1.0
Ownership100%
Contained Metal1,200 kt Cg
Mineral Resources
1,200 kt Cg in Measured & Indicated Resources

Lac des Iles (LDI)

Graphite· Canada· Production
Production
May 2026
Annual Production25,000 t Cg concentrate
Mine TypeOpen-pit
Ownership100%
Contained Metal213 kt Cg
Mineral Resources
213 kt Cg in Measured & Indicated Resources

Okanjande

Graphite· Namibia· Development
Initial Capex$35M
Annual Production31,000 t Cg concentrate
Mine TypeOpen-pit
Ownership100%
Contained Metal1,600 kt Cg
Mineral Resources
1,600 kt Cg in Measured & Indicated Resources

Baie-Comeau BAM Plant (Canada)

Graphite (Battery Anode Material)· Canada, Quebec (Baie-Comeau)· Development
Annual Production20 kt BAM
Ownership100%

France BAM Plant

Graphite (Battery Anode Material)· France· Development
Initial Capex€159M
Annual Production20 kt BAM
Ownership100%

Yanbu BAM Plant (KSA JV)

Graphite (Battery Anode Material)· Saudi Arabia, Yanbu· Development
Initial Capex$200M
Annual Production25 kt BAM

Lac-des-Îles Graphite Mine (LDI)

Graphite (flake graphite / graphitic carbon)· Québec, Canada (near Lac-des-Îles, ~110 km NE of Ottawa, ~180 km NW of Montréal)· Production
Resource Estimate
Feb 2024
Annual Production25,000 tpa concentrate (maximum plant production capacity)
Head GradeIndicated 6.4% Cg; Inferred 7.4% Cg
Recovery90%
Mine TypeOpen-pit
Contained Metal319 kt Cg
Mineral Reserves
No Mineral Reserve estimate; a new Mineral Reserve estimate is in progress (expected Q2/Q3 2024)
Mineral Resources
Indicated: 3.29 Mt at 6.4% Cg, containing 213 kt Cg; Inferred: 1.43 Mt at 7.4% Cg, containing 106 kt Cg (effective December 31, 2023, 2.3% Cg cut-off)

Mousseau Project (Mousseau West Deposit)

Graphite· Mont-Laurier area, Province of Québec, Canada· Exploration
Resource Estimate
Jul 2023
Head Grade7.908% Graphite (M&I); 9.254% Graphite (Inferred)
Mine TypeOpen-pit
Contained Metal223,079 t Graphite (M&I)
Mineral Resources
Measured & Indicated: 2,821,041 t at 7.908% Graphite (223,079 t Graphite); Inferred: 331,884 t at 9.254% Graphite (30,714 t Graphite)

Okanjande Graphite Project

Graphite· Namibia· Development
PEA
Jan 2022
NPV (After-Tax) @ 8%$65M
NPV (Pre-Tax)$107M
IRR (After-Tax)62%
Initial Capex$15M
Payback2 yrs
AISC775.2 USD/t concentrate
Mine Life10 yrs
Annual Production31,877 t/a graphite concentrate
Head Grade5.27% TGC (average mineralized material)
Recovery92%
Mine TypeOpen-pit
Mineral Resources
Weathered (at 2.6% TGC cut-off): Measured 1.7 Mt @ 4.66% TGC (80 kt); Indicated 4.2 Mt @ 4.03% TGC (168 kt); M&I subtotal 5.9 Mt @ 4.21% TGC (248 kt); Inferred 0.5 Mt @ 3.45% TGC (17 kt). Transitional (2.6% TGC cut-off): Measured 0.2 Mt @ 5.42% TGC (13 kt); Indicated 1.0 Mt @ 4.08% TGC (40 kt); subtotal 1.2 Mt @ 4.35% TGC (53 kt); Inferred 0.1 Mt @ 3.20% TGC (2 kt). Fresh (at 3.1% TGC cut-off): Measured 7.1 Mt @ 5.86% TGC (419 kt); Indicated 17.0 Mt @ 5.10% TGC (868 kt); M&I subtotal 24.2 Mt @ 5.33% TGC (1,287 kt); Inferred 7.2 Mt @ 5.02% TGC (359 kt)

Northstar Bancam

Graphite· Canada

Project figures are automatically extracted from company filings and presentations and reflect the most recent disclosure found. They may contain errors — always verify against the linked source document.

How the Economics Evolved

Okanjande Graphite Project

2 studies on record
Resource Estimate
Nov 2021
PEA
Jan 2022
$65M
IRR 62% · Capex $15M

Economics as disclosed in each successive study. NPV shown in US$ where a currency conversion is available (at each study's own period rate), else in the study's stated currency. Verify against the source filings.

Free email updates

Find the best mining projects

Be the first to know about new mining results, and how they compare to other projects.

Financial Metrics

Loading financial data...

Frequently Asked Questions

What does Northern Graphite Corporation mine?
Northern Graphite Corporation is focused on Graphite.
What is the economic value of Northern Graphite Corporation's Okanjande Graphite Project?
According to its PEA, Okanjande Graphite Project has an after-tax NPV of $65M and an IRR of 62%.
What exchange is Northern Graphite Corporation listed on?
Northern Graphite Corporation trades under the ticker NGC.V on the TSX Venture Exchange (TSXV).
How many projects does Northern Graphite Corporation have?
We track 10 projects with extracted technical and economic data for Northern Graphite Corporation.

Quick Facts

Ticker Symbol
NGC.V
Market Cap
Small Cap
Category
Graphite
Commodities
Graphite

This information is for educational purposes only and does not constitute investment advice. Always conduct your own research before making investment decisions.

◆ ◆ ◆