Gold$2,045.30+0.52%
Silver$23.84-0.18%
Copper$3.85+1.23%
Platinum$912.40-0.33%
Iron Ore$118.50+2.14%
Nickel$16,892-0.89%
E3 Lithium Ltd. logo

E3 Lithium Ltd.

ETL.VSmall CapLithium

Price History

Loading chart...

About E3 Lithium Ltd.

E3 Lithium Ltd. (ETL.V) is a lithium mining company listed on the TSX Venture Exchange (TSXV). Our project database tracks 5 projects for E3 Lithium Ltd. with technical and economic data extracted from company filings. Its flagship Clearwater Project (Pre-Feasibility) carries an after-tax NPV of $3.72B and an IRR of 24.6% over a 50-year mine life.

E3 Lithium has developed proprietary direct lithium extraction (DLE) technology for brine resources in Alberta's foothills region. The company is progressing toward commercial-scale lithium production from geothermal brines.

Primary Commodities

Lithium

Project Economics

Clearwater Project - Full Project Potential

Lithium· Bashaw District, Central Alberta, Canada· Development
Annual Production36,000 tonnes lithium carbonate/year

Clearwater Project - Stage 1

Lithium· Bashaw District, Central Alberta, Canada· Development
Annual Production12,000 tonnes LC/year
Mine TypeBrine DLE

Garrington District

Lithium· Canada, Alberta· Exploration
Resource Estimate
Jun 2025
Mine TypeBrine (in-situ DLE)
Ownership100%
Contained Metal5 Mt LCE (M&I)
Mineral Resources
Garrington M&I 5.00 Mt LCE (Measured 0.16, Indicated 4.82), Inferred 0.32 Mt LCE

Clearwater Project

Lithium· Alberta, Canada (Bashaw District)· Development
Pre-Feasibility
Jun 2024
NPV (After-Tax) @ 8%$3.72B
NPV (Pre-Tax)$5.18B
IRR (After-Tax)24.6%
Initial Capex$2.46B
Payback4.3 yrs
AISC6,200 USD/tonne LHM
Mine Life50 yrs
Annual Production25,850 t LHM/yr
Head Grade~76 mg/L Li brine
Recovery95%
Mine TypeIn-situ brine extraction (DLE)
Ownership100%
Contained Metal21.2 Mt LCE
Mineral Reserves
P&P Reserves: 1.14 Mt LCE (Bashaw District)
Mineral Resources
M&I Resources: 21.22 Mt LCE total (Bashaw 16.22 Mt LCE, Garrington 5.00 Mt LCE); Inferred: 0.32 Mt LCE (Garrington)

Clearwater Project - Stage 1 / Staged Plan

Lithium· Bashaw District, Central Alberta, Canada· Development
Pre-Feasibility
Jun 2024
Annual Production12,000 tonnes lithium carbonate/year (Stage 1)

Project figures are automatically extracted from company filings and presentations and reflect the most recent disclosure found. They may contain errors — always verify against the linked source document.

How the Economics Evolved

Clearwater Project

4 studies on record
Pre-Feasibility
Jun 2024
$3.72B
IRR 24.6% · Capex $2.46B
Pre-Feasibility
Jun 2024
$3.72B
IRR 24.6% · Capex $2.46B
Pre-Feasibility
Jun 2024
$3.72B
IRR 24.6% · Capex $2.46B
Pre-Feasibility
Jun 2024
$3.72B
IRR 24.6% · Capex $2.46B

Economics as disclosed in each successive study. NPV shown in US$ where a currency conversion is available (at each study's own period rate), else in the study's stated currency. Verify against the source filings.

Free email updates

Find the best mining projects

Be the first to know about new mining results, and how they compare to other projects.

Financial Metrics

Loading financial data...

Frequently Asked Questions

What does E3 Lithium Ltd. mine?
E3 Lithium Ltd. is focused on Lithium.
What is the economic value of E3 Lithium Ltd.'s Clearwater Project?
According to its Pre-Feasibility, Clearwater Project has an after-tax NPV of $3.72B and an IRR of 24.6%.
What exchange is E3 Lithium Ltd. listed on?
E3 Lithium Ltd. trades under the ticker ETL.V on the TSX Venture Exchange (TSXV).
How many projects does E3 Lithium Ltd. have?
We track 5 projects with extracted technical and economic data for E3 Lithium Ltd.

Quick Facts

Ticker Symbol
ETL.V
Market Cap
Small Cap
Category
Lithium
Commodities
Lithium

This information is for educational purposes only and does not constitute investment advice. Always conduct your own research before making investment decisions.

◆ ◆ ◆