EV Nickel Inc.
Price History
Loading chart...
About EV Nickel Inc.
EV Nickel Inc. (EVNI.V) is a nickel mining company listed on the TSX Venture Exchange (TSXV). Our project database tracks 14 projects for EV Nickel Inc. with technical and economic data extracted from company filings. Its flagship CarLang A Nickel Project (PEA) carries an after-tax NPV of C$1.48B and an IRR of 14% over a 20-year mine life.
EV Nickel is advancing the Shaw Dome nickel project near Timmins, Ontario, specifically targeting supply of nickel for EV batteries. The project focuses on high-grade mineralization suitable for battery metal demand.
Primary Commodities
Project Economics
Pure North High-Grade Nickel JV
- Mineral Resources
- Targeting 6-10Mt of high-grade nickel (+1.0%)
Shaw Dome Project - Langmuir #2 / Langmuir South
- Mineral Reserves
- Historic ~600,000 tons (>500Kt) averaging 1.45% Ni (historic, not current)
- Mineral Resources
- Historic high grade nickel, 10 m tonnes at 1%+
Gemini North Nickel Zone (Shaw Dome Project / CarLang Area)
- Mineral Resources
- Indicated: 9.5M tonnes at 0.27% Ni (56Mlbs Ni); Inferred: 84.0M tonnes at 0.22% Ni (411Mlbs Ni); Total I+I: 93.5M tonnes at 0.23% Ni
Gemini North Zone (Shaw Dome Project - CarLang Area)
- Mineral Resources
- Indicated: 9,453,356 tonnes at 0.27% Ni containing 55.6Mlbs (25kt) Ni; Inferred: 83,997,068 tonnes at 0.22% Ni containing 410.7Mlbs (186kt) Ni. Total I+I: 93,450,424 tonnes at 0.23% Ni containing 212kt Ni. Reported at US$7.35/t NSR cut-off.
Shaw Dome Project - Gemini North Zone
- Mineral Resources
- Indicated: 9.45 Mt @ 0.27% Ni; Inferred: 84.0 Mt @ 0.22% Ni; Total I+I: 93.45 Mt @ 0.23% Ni
CarLang A Nickel Project
- Mineral Reserves
- Not stated (no mineral reserves, only resources)
- Mineral Resources
- Indicated: 510 Mt at 0.25% Ni; Inferred: 497 Mt at 0.23% Ni
- Royalties / Streams
- None stated (royalty: -)
Shaw Dome Project - Gemini North
- Mineral Resources
- Indicated: 9,453,356 tonnes @ 0.27% Ni, Inferred: 83,997,068 tonnes @ 0.22% Ni (467Mlbs Ni total)
Shaw Dome Project - CarLang A Deposit
- Mineral Resources
- 1B tonnes @ 0.24% Ni
Shaw Dome Project - CarLang A Zone
- Mineral Resources
- 1B tonnes @ 0.24% Ni
W4 Nickel Deposit
- Royalties / Streams
- 2% NSR on certain legacy mining claims as per the 2004 Healey Option
Shaw Dome Project - W4 Deposit
- Mineral Resources
- M+I >1.45 Mt @ 0.98% Ni; Inferred 0.56 Mt @ 0.98% Ni (2023 MRE)
Shaw Dome Project - W4 Zone
- Mineral Resources
- M+I >1.45Mt @ 0.98% Ni, Inferred 0.56Mt @ 0.98% Ni
CarLang A Zone
- Mineral Resources
- Maiden Mineral Resource Estimate for the CarLang A Zone (pit-constrained) - see Table 1-1
CarLang Nickel Property - A Zone Deposit
- Mineral Resources
- Maiden Mineral Resource Estimate: Pit-constrained resources of the CarLang A Zone Deposit (see Table 1-1).
Project figures are automatically extracted from company filings and presentations and reflect the most recent disclosure found. They may contain errors — always verify against the linked source document.
Find the best mining projects
Be the first to know about new mining results, and how they compare to other projects.
Financial Metrics
Loading financial data...
Frequently Asked Questions
- What does EV Nickel Inc. mine?
- EV Nickel Inc. is focused on Nickel.
- What is the economic value of EV Nickel Inc.'s CarLang A Nickel Project?
- According to its PEA, CarLang A Nickel Project has an after-tax NPV of C$1.48B and an IRR of 14%.
- What exchange is EV Nickel Inc. listed on?
- EV Nickel Inc. trades under the ticker EVNI.V on the TSX Venture Exchange (TSXV).
- How many projects does EV Nickel Inc. have?
- We track 14 projects with extracted technical and economic data for EV Nickel Inc.
Project Analysis
Shaw Dome Project - CarLang A Deposit PEA: $1.48B NPV Over a 20-Year Mine Life
EV Nickel Inc.'s Shaw Dome Project - CarLang A Deposit in Ontario, Canada (Timmins area) has a Preliminary Economic Assessment (PEA) outlining an after-tax NPV of $1.48B. The proposed mine plan runs 20 years.
Shaw Dome Project - CarLang A Zone PEA: C$1.48B NPV Over a 20-Year Mine Life
EV Nickel Inc.'s Shaw Dome Project - CarLang A Zone in Timmins, Ontario, Canada has a Preliminary Economic Assessment (PEA) outlining an after-tax NPV of C$1.48B. The mine plan runs 20 years at about 40000 t Ni in concentrate per year.
Quick Facts
- Ticker Symbol
- EVNI.V
- Market Cap
- Small Cap
- Category
- Nickel
- Commodities
- Nickel
This information is for educational purposes only and does not constitute investment advice. Always conduct your own research before making investment decisions.