GOLDPFSPROJECT ECONOMICS

Cerro del Gallo PFS: $972M NPV, 59.3% IRR

ByMining Stocks Research
Nov 10, 2026
Source:Heliostar Metals Ltd.
Heliostar Metals Ltd. logo
Related Company
Heliostar Metals Ltd.
$HSTR.V
View Company →

Heliostar Metals Ltd.'s Cerro del Gallo in Mexico, Guanajuato has a Pre-Feasibility Study (PFS) outlining an after-tax NPV of $972M, an after-tax IRR of 59.3%, and initial capital of $195M. The mine plan runs 15 years at about 86 koz GEO per year.

Heliostar Metals Ltd.'s Cerro del Gallo has reported Pre-Feasibility Study (PFS) results for the gold project in Mexico, Guanajuato. The study headlines an after-tax net present value of $972M at a 5% discount rate. It reflects Heliostar Metals Ltd.'s (HSTR.V) latest disclosed economics for the asset.

Economics. The after-tax NPV is $972M using a 5% discount rate. After-tax IRR is 59.3%. Initial capital expenditure is estimated at $195M. All-in sustaining costs are pegged at 1390 USD/GEO. Economics are based on Upside $3,900/oz gold; base $2,400/oz gold (NPV $424M, IRR 33.1%).

Production and mine plan. The project envisions an open-pit, heap leach operation. Life of mine is 15 years. Average annual production is approximately 86 koz GEO.

Resources and ownership. Mineral reserves: Probable 91,893 kt at 0.51 g/t Au, 1,495 koz Au. The company holds a 100% interest in the project.

These figures are extracted from Heliostar Metals Ltd.'s technical disclosures and reflect the most recent PFS on file. Compare this project against other developers and producers in our project economics database, and always verify the numbers against the original technical report before making any investment decision.

Mining Stocks Research

Our Analysis

IRR after-tax
59.3%

higher than 76% of 130 projects we track

NPV after-tax
$972M

higher than 62% of 204 projects we track

Initial capex
$195M

20% of NPV

costlier than 46% of 191 projects we track

Mine life
15yrs
Discount rate
5%
Study price assumption
Upside $3,900/oz gold; base $2,400/oz gold (NPV $424M, IRR 33.1%)
Spot gold today
$3,863.50/oz

Guanajuato is one of Mexico's oldest mining districts, and the economics on offer here are unusual even by that standard: a $195M build that supports an after-tax NPV of $972M and a 59.3% IRR, ahead of 76% of the 130 gold projects we track. Against the roughly 15% after-tax IRR developers typically need to attract project finance, the return clears the hurdle by a very wide margin. On capital cost alone, though, the project is only middling: the build is lower than 54% of 191 peers, so the appeal comes from what the capital earns rather than from an unusually cheap mine.

That points to the catch, which is the price deck. The headline figures use the $3,900/oz upside case, and live spot of $3,863.50/oz sits just below it, so the market is currently paying almost exactly what the headline assumes. The base case at $2,400/oz delivers an NPV of $424M and an IRR of 33.1%. That is still a financeable project, but a very different one: the headline is a bet that gold stays near today's level, not a conservative central case. The 15-year mine life is a reasonable asset base, but the study stage matters too. A PFS carries a band of roughly plus or minus 25% on estimates, and it is not a build decision. Grade and cost risk sit inside that band, and operating margins at a lower gold price would feel them far more.

The market-cap comparison cuts both ways. NPV of about 1.9x the US$522M market cap could mean the equity is cheap relative to the asset. It could equally mean investors are discounting the PFS stage, the price deck, Mexican jurisdictional risk and, above all, funding. The build cost is about 0.4x the company's whole market cap, a large fraction for a small-cap to finance quietly. Eight projects in the portfolio give it some diversification, but they also compete for capital. Debt would carry much of the load given the returns, yet any equity component would be meaningfully dilutive at this valuation. The question that decides the outcome is whether the company can fund the build on terms that preserve most of the value if gold falls back toward the base case, without a heavy equity raise.

Our take, benchmarked against the project economics in the Mining Stocks database. Figures are estimates drawn from company technical reports — not investment advice; always verify against the source filing.

Free email updates

Get the next one first

Every mining project we track, with its study figures and sources, kept up to date. Sign up and download the data right away.

By signing up, you agree to receive marketing emails from Mining Stocks and to our data license. You can unsubscribe at any time. Privacy policy

View the source filing from
Heliostar Metals Ltd.