Shaakichiuwaanaan (CV5) Feasibility Study: C$5.10B NPV, 40.4% IRR
PMET Resources Inc.'s Shaakichiuwaanaan (CV5) in Quebec, Canada has a Feasibility Study outlining an after-tax NPV of C$5.10B, an after-tax IRR of 40.4%, and initial capital of C$1.68B. The mine plan runs 20 years at about 800 kt SC5.5 per year.
PMET Resources Inc.'s Shaakichiuwaanaan (CV5) has reported Feasibility Study results for the lithium project in Quebec, Canada. The study headlines an after-tax net present value of C$5.10B at a 8% discount rate. It reflects PMET Resources Inc.'s (PMET.TO) latest disclosed economics for the asset.
Economics. The after-tax NPV is C$5.10B using a 8% discount rate. After-tax IRR is 40.4%. Initial capital expenditure is estimated at C$1.68B. The study models a payback period of 2.7 years. All-in sustaining costs are pegged at 480 USD/t. Economics are based on SC5.5 US$1,788/t FOB Quebec ports; Ta2O5 US$120/lb; FX 1.37 CA$/US$.
Production and mine plan. The project envisions an open-pit & underground operation. Life of mine is 20 years. Average annual production is approximately 800 kt SC5.5. Metallurgical recovery averages 69.7%.
Resources and ownership. The company holds a 100% interest in the project.
These figures are extracted from PMET Resources Inc.'s technical disclosures and reflect the most recent Feasibility Study on file. Compare this project against other developers and producers in our project economics database, and always verify the numbers against the original technical report before making any investment decision.
Reserves & Resources
| Category | Tonnage | Grade | Contained |
|---|---|---|---|
| Probable | 83.0 Mt | 1.27% Li2O, 148 ppm Ta2O5 | 12.3 kt Ta2O5 |
| Category | Tonnage | Grade | Contained |
|---|---|---|---|
| Indicated | 113,909,000 t | 1.43% Li2O, 164 ppm Ta2O5 | 4.03 Mt LCE, 18.68 kt Ta2O5 |
| Inferred | 33,773,000 t | 1.24% Li2O, 150 ppm Ta2O5 | 1.03 Mt LCE, 5.07 kt Ta2O5 |
Our Analysis
- IRR after-tax
- 40.4%
higher than 83% of 24 projects we track
- NPV after-tax
- C$5.10B
higher than 81% of 27 projects we track
- Initial capex
- C$1.68B
33% of NPV
costlier than 77% of 26 projects we track
- Payback
- 2.7yrs
slower than 22% of 18 projects we track
- Mine life
- 20yrs
- Discount rate
- 8%
- Study price assumption
- SC5.5 US$1,788/t FOB Quebec ports; Ta2O5 US$120/lb; FX 1.37 CA$/US$
Funding a C$1.68B build is the central question for a company with a market cap of about US$399M. The initial capex is roughly 3.1x the company's entire equity value, and that is the number that matters more than anything in the economics. A company this size cannot fund that from its own balance sheet or a conventional equity raise without severe dilution. The realistic cheque-writers are a strategic partner (an offtaker, battery or chemicals producer taking a project-level stake), export credit and government-linked lenders, and a conventional project finance syndicate. Each comes with a price: a minority sale of the asset, offtake commitments, or equity issued at a discount to the NPV the study implies. Existing holders should expect to own a smaller slice of the project than the headline suggests.
The economics give the company real leverage in those negotiations. A 40.4% after-tax IRR sits well above the ~15% developers typically need to attract project finance, and it ranks higher than 83% of the 24 lithium projects we track. Payback of 2.7 years is moderate by peer standards (shorter than 22% of peers' timelines is not the claim here, simply that it is not exceptional), but it still means lenders see capital returned early in a 20-year mine life. Capex at 33% of after-tax NPV of C$5.10B is also lighter than 23% of peers on that measure. Quebec is a mining-friendly jurisdiction by general standing, and a feasibility-level study carries the most weight we see, typically within a plus or minus 15% band. All of that makes the asset financeable in principle.
The gap between NPV and market cap, about 9.3x, cuts both ways. It may reflect value the market has yet to credit, but it more plausibly reflects an expectation of heavy dilution, partner carve-outs and execution risk on a build this large relative to the company. Product price is the other sensitivity: the study assumes SC5.5 at US$1,788/t FOB Quebec ports, Ta2O5 at US$120/lb and an FX rate of 1.37 CA$/US$, and lenders will stress those inputs. The company's nine-project portfolio offers some diversification but little extra funding capacity. The deciding question is what share of the project, and how many new shares, management must give up to close the C$1.68B, and whether the remaining stake still justifies today's equity value.
Our take, benchmarked against the project economics in the Mining Stocks database. Figures are estimates drawn from company technical reports — not investment advice; always verify against the source filing.
Get the next one first
Every mining project we track, with its study figures and sources, kept up to date. Sign up and download the data right away.