Çöpler District (Initial Assessment MII Case) PEA: $2.00B NPV, $218M Capex
SSR Mining Inc.'s Çöpler District (Initial Assessment MII Case) in Erzincan Province, Turkey has a Preliminary Economic Assessment (PEA) outlining an after-tax NPV of $2.00B and initial capital of $218M. The mine plan runs 22 years at about 300 kozpa Au (5-year annual average) per year.
SSR Mining Inc.'s Çöpler District (Initial Assessment MII Case) has reported Preliminary Economic Assessment (PEA) results for the gold project in Erzincan Province, Turkey. The study headlines an after-tax net present value of $2.00B at a 5% discount rate. It reflects SSR Mining Inc.'s (SSRM) latest disclosed economics for the asset.
Economics. The after-tax NPV is $2.00B using a 5% discount rate. Initial capital expenditure is estimated at $218M. All-in sustaining costs are pegged at 924 USD/oz gold. Economics are based on Long-term metal price assumptions of $1,600/oz gold, $21.00/oz silver, and $3.40/lb copper.
Production and mine plan. The project envisions an open-pit operation. Life of mine is 22 years. Average annual production is approximately 300 kozpa Au (5-year annual average).
Resources and ownership. The company holds a 100% interest in the project.
These figures are extracted from SSR Mining Inc.'s technical disclosures and reflect the most recent PEA on file. Compare this project against other developers and producers in our project economics database, and always verify the numbers against the original technical report before making any investment decision.
Our Analysis
- NPV after-tax
- $2.00B
higher than 88% of 192 projects we track
- Initial capex
- $218M
11% of NPV
costlier than 55% of 176 projects we track
- Mine life
- 22yrs
- Study price assumption
- Long-term metal price assumptions of $1,600/oz gold, $21.00/oz silver, and $3.40/lb copper
- Spot gold today
- $4,216.30/oz
A 22-year mine life is the first thing to weigh here, and it is the most durable feature of the asset: two decades of production is long enough to survive a commodity cycle or two, which matters more than any single-year headline. Against the 192 gold projects we track, the after-tax NPV of $2.00B ranks higher than 88% of them. That is a genuinely strong position, but it is a ranking on study-stage numbers, not on built, permitted, producing mines, and the gap between those two things is where the investment case lives or dies.
The constraint that matters most is the study itself. This is a PEA, scoping-level, which means it may lean on inferred resources and its capital estimate typically carries a plus or minus 50% band. A $218M initial capex is capital-light at 11% of NPV and lower than 45% of the 176 gold projects we track, and it is small relative to the company's US$7.37B market cap. That combination is the sharpest funding-risk signal available: a build of this size does not require the kind of raise that would force a dilutive equity event, and the company is a mid-cap with 66 projects in its portfolio, so this is one asset among many rather than a make-or-break bet.
Two things temper the picture. Erzincan Province, Turkey is a jurisdiction that carries permitting and sovereign risk an investor should price in, and the study's $1,600/oz gold assumption sits well below today's live spot of $4,216.30/oz, so the returns modelled here are not stretched on price. The NPV is roughly 0.3x the company's market cap, which cuts both ways: either the market has not priced the asset, or it is discounting the PEA stage, the jurisdiction, or the path to a feasibility study. The question that decides this project is whether it advances to feasibility with the resource and capital estimate intact.
Our take, benchmarked against the project economics in the Mining Stocks database. Figures are estimates drawn from company technical reports — not investment advice; always verify against the source filing.