GRAPHITEPEAPROJECT ECONOMICS

Loki Flake Graphite Deposit (Key Lake South Project) PEA: $130M NPV, 16.7% IRR

ByMining Stocks Research
Nov 8, 2026
Source:Abasca Resources Inc.
Abasca Resources Inc. logo
Related Company
Abasca Resources Inc.
$ABA.V
View Company →

Abasca Resources Inc.'s Loki Flake Graphite Deposit (Key Lake South Project) in Canada, Saskatchewan has a Preliminary Economic Assessment (PEA) outlining an after-tax NPV of $130M and an after-tax IRR of 16.7%.

Abasca Resources Inc.'s Loki Flake Graphite Deposit (Key Lake South Project) has reported Preliminary Economic Assessment (PEA) results for the graphite project in Canada, Saskatchewan. The study headlines an after-tax net present value of $130M. It reflects Abasca Resources Inc.'s (ABA.V) latest disclosed economics for the asset.

Economics. The after-tax NPV is $130M. After-tax IRR is 16.7%.

Production and mine plan. The project envisions an open-pit operation.

Resources and ownership. The company holds a 100% interest in the project.

These figures are extracted from Abasca Resources Inc.'s technical disclosures and reflect the most recent PEA on file. Compare this project against other developers and producers in our project economics database, and always verify the numbers against the original technical report before making any investment decision.

Reserves & Resources

Mineral Resources (M&I&I)
CategoryTonnageGradeContained
Indicated6.99 Mt8.27% Cg—
Inferred15.83 Mt6.93% Cg—
Mining Stocks Research

Our Analysis

IRR after-tax
16.7%

higher than 6% of 16 projects we track

NPV after-tax
$130M

higher than 6% of 16 projects we track

Mine life
19yrs
Discount rate
8%
Study price assumption
Graphite US$1,450/tonne; US$/CAD$ exchange rate 0.72:1.00

A US$7M nano-cap sitting on an after-tax NPV of $130M, roughly 19.8x its market value, invites two readings. One is that a scoping-level asset in a mining-friendly province has simply not been noticed. The other is that the market doubts the company can fund and permit a build that dwarfs its equity, and is discounting the study accordingly. Both have merit, and the numbers do not settle it. The 19-year mine life suggests a durable, long-duration deposit, but that duration is a modeled outcome from an exploration-stage project, not a demonstrated one.

The returns do little to close the gap. A 16.7% after-tax IRR clears the roughly 15% level developers typically need to attract project finance, but only barely, and this is a higher-risk junior with one of 2 projects we track, where lenders and equity partners tend to look for 20% or more. Peer context points the same way: both IRR and NPV rank higher than only 6% of the 16 graphite projects we track, which is bottom quartile on each. So the headline NPV is large against this company's tiny equity value, but not large against the sector. The market cap is small enough that almost any study would look big beside it.

Study quality adds to the caution. This is a PEA, which is preliminary, may rest on inferred resources, and carries a capital estimate that typically sits within a plus or minus 50% band. With a thin IRR cushion, cost overruns at the wrong end of that band could push returns below the financing threshold. The price deck of US$1,450/tonne graphite and a 0.72 US$/CAD$ rate are further sensitivities worth stress-testing. The update shows no change in NPV, mine life or IRR from the 2026 PEA, so there is no new de-risking to point to. Saskatchewan is a sound jurisdiction for permitting and infrastructure, which helps, but it does not remove the funding problem.

The deciding question is whether a US$7M company can attract a strategic or financing partner for a build far larger than its equity, on a sub-20% IRR from a scoping study. Until a pre-feasibility or feasibility study tightens the capital estimate and lifts returns, the gap reads as unresolved risk as much as hidden value.

Our take, benchmarked against the project economics in the Mining Stocks database. Figures are estimates drawn from company technical reports — not investment advice; always verify against the source filing.

Free email updates

Get the next one first

Every mining project we track, with its study figures and sources, kept up to date. Sign up and download the data right away.

By signing up, you agree to receive marketing emails from Mining Stocks and to our data license. You can unsubscribe at any time. Privacy policy

View the source filing from
Abasca Resources Inc.
View Source Filing (PDF) →
◆ ◆ ◆