Gold$2,045.30+0.52%
Silver$23.84-0.18%
Copper$3.85+1.23%
Platinum$912.40-0.33%
Iron Ore$118.50+2.14%
Nickel$16,892-0.89%
SILVER, GOLDPROJECT ECONOMICS

El Potrero Project Economics: $5M Capex

ByMining Stocks Research
Jun 30, 2026
Source:Pinnacle Silver and Gold Corp.
Pinnacle Silver and Gold Corp. logo
Related Company
Pinnacle Silver and Gold Corp.
$PINN.V
View Company →

Pinnacle Silver and Gold Corp.'s El Potrero in Mexico, Sierra Madre Belt has an economic study outlining initial capital of $5M.

Pinnacle Silver and Gold Corp.'s El Potrero has reported economic study results for the silver, gold project in Mexico, Sierra Madre Belt. It reflects Pinnacle Silver and Gold Corp.'s (PINN.V) latest disclosed economics for the asset.

Economics. Initial capital expenditure is estimated at $5M.

Production and mine plan. The project envisions an underground operation. Average annual production is approximately 100 tpd (plant capacity). Average head grade is 7.7 g/t Au & 116 g/t Ag. Metallurgical recovery averages 97%.

Resources and ownership. The company holds a 100% interest in the project. Royalties and streams: 2% NSR.

These figures are extracted from Pinnacle Silver and Gold Corp.'s technical disclosures and reflect the most recent disclosure on file. Compare this project against other developers and producers in our project economics database, and always verify the numbers against the original technical report before making any investment decision.

View the source filing from
Pinnacle Silver and Gold Corp.
View Source Filing (PDF) →
◆ ◆ ◆