COPPERPEAPROJECT ECONOMICS

Caribou Mine / Murray Brook PEA: C$169M NPV, 41% IRR

ByMining Stocks Research
Nov 16, 2026
Source:Canadian Copper Inc.
Canadian Copper Inc. logo
Related Company
Canadian Copper Inc.
$CCI.CN
View Company →

Canadian Copper Inc.'s Caribou Mine / Murray Brook in Canada, New Brunswick (Bathurst) has a Preliminary Economic Assessment (PEA) outlining an after-tax NPV of C$169M, an after-tax IRR of 41%, and initial capital of C$64M. The mine plan runs 13.2 years at about 30 Mlb CuEq per year.

Canadian Copper Inc.'s Caribou Mine / Murray Brook has reported Preliminary Economic Assessment (PEA) results for the copper project in Canada, New Brunswick (Bathurst). The study headlines an after-tax net present value of C$169M at a 7% discount rate. It reflects Canadian Copper Inc.'s (CCI.CN) latest disclosed economics for the asset.

Economics. The after-tax NPV is C$169M using a 7% discount rate. After-tax IRR is 41%. Initial capital expenditure is estimated at C$64M, with life-of-mine sustaining capital of C$49M. All-in sustaining costs are pegged at 3.14 USD/lb CuEq. Economics are based on US$4.25/lb Cu, US$1.30/lb Zn, US$27/oz Ag, US$1.10/lb Pb; USD/CAD 0.746.

Production and mine plan. Life of mine is 13.2 years. Average annual production is approximately 30 Mlb CuEq. The open-pit strip ratio is 5.0:1.

Resources and ownership. The company holds a 100% interest in the project. Royalties and streams: OR Royalties stream: 20% life-of-mine payable gold & silver ($38.4M stream financing); Ocean Partners project debt up to $48.0M.

These figures are extracted from Canadian Copper Inc.'s technical disclosures and reflect the most recent PEA on file. Compare this project against other developers and producers in our project economics database, and always verify the numbers against the original technical report before making any investment decision.

Mining Stocks Research

Our Analysis

IRR after-tax
41%

higher than 96% of 45 projects we track

NPV after-tax
C$169M

higher than 19% of 52 projects we track

Initial capex
C$64M

38% of NPV

costlier than 5% of 57 projects we track

Mine life
13.2yrs
Discount rate
7%
Study price assumption
US$4.25/lb Cu, US$1.30/lb Zn, US$27/oz Ag, US$1.10/lb Pb; USD/CAD 0.746
Spot copper today
$6.04/lb

Bathurst, New Brunswick, is old base-metal country, and a copper PEA from it that pairs a 41% after-tax IRR with a C$64M initial build is unusual on our screen. The return sits above 96% of the 45 copper projects we track, and the capex is lower than 95% of the 57 we track. The 41% clears the roughly 15% hurdle for project finance, and also the 20%+ typically demanded of a junior with little else behind it. Canada is a mining-friendly jurisdiction with established infrastructure, so this is not a return that needs a jurisdictional discount to make sense.

The catch is that the economics are better than the evidence behind them. This is a scoping-level PEA, which is preliminary, may lean on inferred resources, and typically carries a plus or minus 50% band on capital. Even a modest overrun erodes the capital-light story, and the NPV of C$169M, which ranks higher than only 19% of the 52 copper projects we track, shows this is a small asset, not a large one. The high IRR comes from a low denominator, not from sheer size. The 13.2-year mine life is respectable, but a polymetallic deposit with zinc, silver and lead credits means the return depends on several prices and on metallurgy that a PEA has not fully de-risked. The study uses US$4.25/lb copper against a live spot of $6.04/lb, so the base case is conservative on the lead metal, which is genuine upside if spot holds. Offsetting that, the by-product assumptions deserve their own scrutiny.

Funding is the sharper issue. The company is a US$78M micro-cap, and the build cost is about 0.6x its entire market cap, so this cannot be financed quietly. NPV at about 1.6x market cap can be read two ways: the market has yet to credit a good asset, or it is discounting dilution, a stretched balance sheet and PEA-level uncertainty. Having 5 projects in the portfolio spreads attention and capital, which helps diversification but does not fund this build. The question that decides the outcome is whether a feasibility study confirms the capex and resource quality closely enough to secure financing without heavy equity dilution at today's valuation.

Our take, benchmarked against the project economics in the Mining Stocks database. Figures are estimates drawn from company technical reports — not investment advice; always verify against the source filing.

Free email updates

Get the next one first

Every mining project we track, with its study figures and sources, kept up to date. Sign up and download the data right away.

By signing up, you agree to receive marketing emails from Mining Stocks and to our data license. You can unsubscribe at any time. Privacy policy

View the source filing from
Canadian Copper Inc.
View Source Filing (PDF) →
◆ ◆ ◆