Silver One Resources Inc.
Price History
Loading chart...
About Silver One Resources Inc.
Silver One Resources Inc. (SVE.V) is a silver mining company listed on the TSX Venture Exchange (TSXV). Our project database tracks 10 projects for Silver One Resources Inc. with technical and economic data extracted from company filings. Its flagship project is Candelaria Mine Project, a development-stage open-pit project in Nevada, USA holding 30 Moz Ag of contained metal.
Silver One Resources is developing the Candelaria silver project in Nevada, targeting near-surface silver oxide zones. The project is located in Nevada's historic silver mining district.
Primary Commodities
Project Economics
Candelaria - Low-Grade Stockpile
- Mineral Resources
- Inferred: 3,780,000 tonnes at 25 g/t Ag (FA) (16 g/t AgCN) and 0.10 g/t Au (FA) (0.09 g/t AuCN). SP_E: 1,640,000 tonnes at 24 g/t Ag (FA), 0.09 g/t Au (FA). SP_W: 2,140,000 tonnes at 25 g/t Ag (FA), 0.10 g/t Au (FA).
Candelaria - Low-Grade Stockpiles
- Mineral Resources
- Inferred: 3,780,000 tonnes @ 25 g/t Ag(FA), 0.10 g/t Au(FA)
Candelaria - Mount Diablo Open Pit
- Mineral Resources
- Measured: 5,470,000 tonnes @ 50 g/t AgCN, 0.15 g/t AuCN; Indicated: 13,250,000 tonnes @ 47 g/t AgCN, 0.15 g/t AuCN; M&I: 18,723,000 tonnes @ 48 g/t AgCN, 0.15 g/t AuCN; Inferred: 2,780,000 tonnes @ 31 g/t AgCN, 0.11 g/t AuCN
Candelaria - Mount Diablo Underground
- Mineral Resources
- Measured: 220,000 tonnes @ 76 g/t AgCN, 0.13 g/t AuCN; Indicated: 980,000 tonnes @ 70 g/t AgCN, 0.11 g/t AuCN; M&I: 1,200,000 tonnes @ 71 g/t AgCN, 0.11 g/t AuCN; Inferred: 650,000 tonnes @ 56 g/t AgCN, 0.07 g/t AuCN
Candelaria - Northern Belle Open Pit
- Mineral Resources
- Measured: 1,250,000 tonnes @ 50 g/t AgCN, 0.24 g/t AuCN; Indicated: 2,100,000 tonnes @ 50 g/t AgCN, 0.18 g/t AuCN; M&I: 3,350,000 tonnes @ 50 g/t AgCN, 0.20 g/t AuCN; Inferred: 180,000 tonnes @ 44 g/t AgCN, 0.17 g/t AuCN
Cherokee Project
Phoenix Silver Project
Candelaria Mine Project
- Mineral Resources
- Indicated: 22.2 Mt averaging 42 g/t Ag (30 Moz) on heap leach pads; Inferred: 11.5 Mt averaging 42 g/t Ag (15.4 Moz) on heap leach pads. Historical (2001) M&I: 12.36 Mt averaging 110 g/t Ag (44 Moz); Historical Inferred: 16.65 Mt averaging 65 g/t Ag (35 Moz).
Candelaria - Leach Pads
- Mineral Resources
- LP1 Indicated: 22,180,000 tonnes @ 42 g/t Ag(FA), 0.074 g/t Au(FA); LP2 Inferred: 11,450,000 tonnes @ 42 g/t Ag(FA), 0.100 g/t Au(FA)
Candelaria Mine - Historical Resource (Mount Diablo)
- Mineral Resources
- Historical M&I: 12.36 Mt averaging 110 g/t Ag (44 Moz); Historical Inferred: 16.65 Mt averaging 65 g/t Ag (35 Moz) (Mount Diablo + N. Belle + Low Grade Stockpiles)
Project figures are automatically extracted from company filings and presentations and reflect the most recent disclosure found. They may contain errors — always verify against the linked source document.
Financial Metrics
Loading financial data...
Frequently Asked Questions
- What does Silver One Resources Inc. mine?
- Silver One Resources Inc. is focused on Silver.
- What is Silver One Resources Inc.'s flagship project?
- Candelaria Mine Project, a development-stage project in Nevada, USA.
- What exchange is Silver One Resources Inc. listed on?
- Silver One Resources Inc. trades under the ticker SVE.V on the TSX Venture Exchange (TSXV).
- How many projects does Silver One Resources Inc. have?
- We track 10 projects with extracted technical and economic data for Silver One Resources Inc.
Quick Facts
- Ticker Symbol
- SVE.V
- Market Cap
- Small Cap
- Category
- Silver
- Commodities
- Silver
This information is for educational purposes only and does not constitute investment advice. Always conduct your own research before making investment decisions.