Silver One Resources Inc.
Price History
Loading chart...
About Silver One Resources Inc.
Silver One Resources Inc. (SVE.V) is a silver mining company listed on the TSX Venture Exchange (TSXV). Our project database tracks 15 projects for Silver One Resources Inc. with technical and economic data extracted from company filings. Its flagship project is Candelaria Property - Mount Diablo (Open Pit), a exploration-stage open-pit project in Mineral and Esmeralda Counties, Nevada, USA.
Silver One Resources is developing the Candelaria silver project in Nevada, targeting near-surface silver oxide zones. The project is located in Nevada's historic silver mining district.
Primary Commodities
Project Economics
Candelaria Property - Leach Pads
- Mineral Resources
- LP1 Measured 22,060 kt @ 43.5 g/t Ag, 0.075 g/t Au, 44.6 g/t AgEq; LP1 Indicated 126 kt @ 45.0 g/t Ag, 0.074 g/t Au, 46.1 g/t AgEq; LP1 M&I 22,186 kt @ 43.5 g/t Ag, 0.075 g/t Au, 44.6 g/t AgEq; LP2 Indicated 11,457 kt @ 44.7 g/t Ag, 0.100 g/t Au, 46.6 g/t AgEq; Total 33,643 kt @ 43.9 g/t Ag, 0.084 g/t Au, 45.5 g/t AgEq
Candelaria - Low-Grade Stockpile
- Mineral Resources
- Inferred: 3,780,000 tonnes at 25 g/t Ag (FA) (16 g/t AgCN) and 0.10 g/t Au (FA) (0.09 g/t AuCN). SP_E: 1,640,000 tonnes at 24 g/t Ag (FA), 0.09 g/t Au (FA). SP_W: 2,140,000 tonnes at 25 g/t Ag (FA), 0.10 g/t Au (FA).
Candelaria - Low-Grade Stockpiles
- Mineral Resources
- Inferred: 3,780,000 tonnes @ 25 g/t Ag(FA), 0.10 g/t Au(FA)
Candelaria - Mount Diablo Open Pit
- Mineral Resources
- Measured: 5,470,000 tonnes @ 50 g/t AgCN, 0.15 g/t AuCN; Indicated: 13,250,000 tonnes @ 47 g/t AgCN, 0.15 g/t AuCN; M&I: 18,723,000 tonnes @ 48 g/t AgCN, 0.15 g/t AuCN; Inferred: 2,780,000 tonnes @ 31 g/t AgCN, 0.11 g/t AuCN
Candelaria - Mount Diablo Underground
- Mineral Resources
- Measured: 220,000 tonnes @ 76 g/t AgCN, 0.13 g/t AuCN; Indicated: 980,000 tonnes @ 70 g/t AgCN, 0.11 g/t AuCN; M&I: 1,200,000 tonnes @ 71 g/t AgCN, 0.11 g/t AuCN; Inferred: 650,000 tonnes @ 56 g/t AgCN, 0.07 g/t AuCN
Candelaria - Northern Belle Open Pit
- Mineral Resources
- Measured: 1,250,000 tonnes @ 50 g/t AgCN, 0.24 g/t AuCN; Indicated: 2,100,000 tonnes @ 50 g/t AgCN, 0.18 g/t AuCN; M&I: 3,350,000 tonnes @ 50 g/t AgCN, 0.20 g/t AuCN; Inferred: 180,000 tonnes @ 44 g/t AgCN, 0.17 g/t AuCN
Candelaria Property - Low-Grade Stockpile
- Mineral Resources
- Inferred: SP_E 1,640 kt @ 24 g/t Ag (FA), 0.09 g/t Au (FA), 17 g/t AgEq; SP_W 2,140 kt @ 25 g/t Ag (FA), 0.10 g/t Au (FA), 16 g/t AgEq; Total 3,780 kt @ 25 g/t Ag (FA), 0.10 g/t Au (FA), 16 g/t AgEq
Candelaria Property - Mount Diablo (Open Pit)
- Mineral Resources
- $27.50 Ag Design Pit: Measured 5,470 kt @ 50 g/t AgCN, 0.15 g/t AuCN, 54 g/t AgEq; Indicated 13,250 kt @ 47 g/t AgCN, 0.15 g/t AuCN, 52 g/t AgEq; M&I 18,723 kt @ 48 g/t AgCN, 0.15 g/t AuCN, 52 g/t AgEq; Inferred 2,780 kt @ 31 g/t AgCN, 0.11 g/t AuCN, 34 g/t AgEq
Candelaria Property - Mount Diablo (Underground)
- Mineral Resources
- Underground Continuity Shape: Measured 220 kt @ 76 g/t AgCN, 0.13 g/t AuCN; Indicated 980 kt @ 70 g/t AgCN, 0.11 g/t AuCN; M&I 1,200 kt @ 71 g/t AgCN; Inferred 650 kt @ 56 g/t AgCN
Candelaria Property - Northern Belle
- Mineral Resources
- $27.50 Ag Design Pit: Measured 1,250 kt @ 50 g/t AgCN, 0.24 g/t AuCN, 59 g/t AgEq; Indicated 2,100 kt @ 50 g/t AgCN, 0.18 g/t AuCN, 56 g/t AgEq; M&I 3,350 kt @ 50 g/t AgCN, 0.20 g/t AuCN, 57 g/t AgEq; Inferred 180 kt @ 44 g/t AgCN, 0.17 g/t AuCN, 47 g/t AgEq
Cherokee Project
Phoenix Silver Project
Candelaria Mine Project
- Mineral Resources
- Indicated: 22.2 Mt averaging 42 g/t Ag (30 Moz) on heap leach pads; Inferred: 11.5 Mt averaging 42 g/t Ag (15.4 Moz) on heap leach pads. Historical (2001) M&I: 12.36 Mt averaging 110 g/t Ag (44 Moz); Historical Inferred: 16.65 Mt averaging 65 g/t Ag (35 Moz).
Candelaria - Leach Pads
- Mineral Resources
- LP1 Indicated: 22,180,000 tonnes @ 42 g/t Ag(FA), 0.074 g/t Au(FA); LP2 Inferred: 11,450,000 tonnes @ 42 g/t Ag(FA), 0.100 g/t Au(FA)
Candelaria Mine - Historical Resource (Mount Diablo)
- Mineral Resources
- Historical M&I: 12.36 Mt averaging 110 g/t Ag (44 Moz); Historical Inferred: 16.65 Mt averaging 65 g/t Ag (35 Moz) (Mount Diablo + N. Belle + Low Grade Stockpiles)
Project figures are automatically extracted from company filings and presentations and reflect the most recent disclosure found. They may contain errors — always verify against the linked source document.
Find the best mining projects
Be the first to know about new mining results, and how they compare to other projects.
Financial Metrics
Loading financial data...
Frequently Asked Questions
- What does Silver One Resources Inc. mine?
- Silver One Resources Inc. is focused on Silver.
- What is Silver One Resources Inc.'s flagship project?
- Candelaria Property - Mount Diablo (Open Pit), a exploration-stage project in Mineral and Esmeralda Counties, Nevada, USA.
- What exchange is Silver One Resources Inc. listed on?
- Silver One Resources Inc. trades under the ticker SVE.V on the TSX Venture Exchange (TSXV).
- How many projects does Silver One Resources Inc. have?
- We track 15 projects with extracted technical and economic data for Silver One Resources Inc.
Quick Facts
- Ticker Symbol
- SVE.V
- Market Cap
- Small Cap
- Category
- Silver
- Commodities
- Silver
This information is for educational purposes only and does not constitute investment advice. Always conduct your own research before making investment decisions.