Drilling at Mount Polley Intersects 11.0 Metres Grading 4.43% Copper, 1.53 g/t Gold and 41.7 g/t Silver
VANCOUVER, British Columbia, Jan. 22, 2026 (GLOBE NEWSWIRE) -- Imperial Metals Corporation (“Imperial” or the “Company”) (TSX:III) reports on the first diamond drill hole from the Mount Polley 2025 Phase 2 Diamond Drill Program which includes 11.0 metres with a grade of 4.43% copper, 1.53 g/t gold and 41.7 g/t silver. The nine hole Phase 2 program consisted of 3,718.3 metres. The Mount Polley 2025 Phase 2 program had three goals; to test a high-grade zone beneath the Wight Pit (See Figure 1), to
VANCOUVER, British Columbia, Jan. 22, 2026 (GLOBE NEWSWIRE) -- Imperial Metals Corporation (“Imperial” or the “Company”) (TSX:III) reports on the first diamond drill hole from the Mount Polley 2025 Phase 2 Diamond Drill Program which includes 11.0 metres with a grade of 4.43% copper, 1.53 g/t gold and 41.7 g/t silver. The nine hole Phase 2 program consisted of 3,718.3 metres. The Mount Polley 2025 Phase 2 program had three goals; to test a high-grade zone beneath the Wight Pit (See Figure 1), to
Get the next one first
Be the first to know about new mining results, and how they compare to other projects.