Significant Results from RC Drilling at Tibooburra Gold Project

HIGHLIGHTS Novo completed its maiden drill program at the Clone prospect as part of the Tibooburra Gold Project, in May 2025. The program comprised 14 RC holes for 1,984 m, testing 500 m of strike.Drilling produced significant high-grade gold intercepts including: 12 m @ 5.90 g/t Au from 16 m, including 5 m @ 13.74 g/t Au from 23 m (TBR0001)17 m @ 2.40 g/t Au from 59 m including 9 m @ 4.14 g/t Au from 59 m (TBR0014) The peak intercept in hole TBR001 (12 m @ 5.90 g/t Au) fills a 180 m gap in prev
HIGHLIGHTS Novo completed its maiden drill program at the Clone prospect as part of the Tibooburra Gold Project, in May 2025. The program comprised 14 RC holes for 1,984 m, testing 500 m of strike.Drilling produced significant high-grade gold intercepts including: 12 m @ 5.90 g/t Au from 16 m, including 5 m @ 13.74 g/t Au from 23 m (TBR0001)17 m @ 2.40 g/t Au from 59 m including 9 m @ 4.14 g/t Au from 59 m (TBR0014) The peak intercept in hole TBR001 (12 m @ 5.90 g/t Au) fills a 180 m gap in prev