Erdene Expands Mineralization at Zuun Mod Molybedenum-Copper Project

Highlights: Drilling from surface to 150 metres depth returned multiple intersections of ore-grade mineralization in areas modelled as wasteHigh-grade intersections, greater than 0.1% MoEq1 were returned from multiple holes over widths of 6 to 18 metresHole ZMD-98 extended to 450 metres, intersected near continuous Mo and Cu mineralization over 374 metres, averaging 0.066% MoEqResource model will be updated with 2025 drilling results ahead of a planned Preliminary Economic Assessment expected to
Highlights: Drilling from surface to 150 metres depth returned multiple intersections of ore-grade mineralization in areas modelled as wasteHigh-grade intersections, greater than 0.1% MoEq1 were returned from multiple holes over widths of 6 to 18 metresHole ZMD-98 extended to 450 metres, intersected near continuous Mo and Cu mineralization over 374 metres, averaging 0.066% MoEqResource model will be updated with 2025 drilling results ahead of a planned Preliminary Economic Assessment expected to